Object of the contractHarbour construction works
Description: Contract notice: Harbour construction works
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 45241000, 45241000, 45241000
CPV Description: Harbor Construction Works
"Construction and Installation Works for bringing Ports Terminal 1" Rosenets "to the requirements and good European practices - Stages 1"
The subject of this order is "Construction -instruction works for bringing the "Rosenets" 1st, 2nd and 3rd pirks 1 to the normative requirements and good European practices - Stage 1 ", which generallycapture Category 1 construction works for building a Shorebuilder with a road between Piris 1 and Porsche 2; Reconstruction of Pirus 1, including a North Tall Pavilion, a North Pentagon, Technological Piles, a South Pantry and a South Tall Pavilion; Construction of Porsa Fire Protection System, including Main Pump Station with Operator Hall, Main Water and Furnace to Pirus 1, Dosing Distribution-station, hydro and foam monitor towers, fire alarm system and automation, sea pumping and mooring facilities.
Main Site: Rosenet Port Terminal
The subject of this order is "Construction and installation works for bringing the 1st, 2nd and 3rd pirks of FP Rosenets to the regulatory requirements and good European practices - Stage 1 ", which generally cover the CMP of the 1st category for constructiongiving a Coastguard with a road between Piris 1 and Pirus 2; Reconstruction of Pirus 1, including a North Tall Pavilion, a North Pentagon, Technological Piles, a South Pantry and a South Tall Pavilion; Construction of Piraeus Fire Protection System, including Main Pump Station with Operator Hall, Water Pipes and Pipes to Pirss 1, Dosing Distribution Station, Hydro and Foam MonitorThe subject of this order includes a full range of construction, assembly, start-up works (FUP), single unit tests or parts of them, as applicable, 72 a Sub-Functional Sub-Test of Sub-Objects or parts thereof, where applicable, and includes submission by the Contractor-of the Contracting Authority signed by the Designer, the Builder and the person exercising Construction Supervision Protocol Art. 15 for the entire Object. The Contractor shall provide everything else within the scope specified in the Technical Specifications which is necessary for obtaining a Building Permit from the State Acceptance Commission.
The Contractor shall, in addition to the Equipment already delivered by the Contracting Authority, -all the necessary equipment necessary for the complete completion of the site, as specified in the design specifications, forming the equipment supplied by the Contractor.
The works include the following building sub-projects:
Sub-item: "Pirse 1" .- Subproject: "Fire System - .
A similar feature: "Coastal dome with a road between Piris 1 and Piris 2" The participant must be registered in the Central Profeasibility report of the builder for the first, second, third and fourth group, first category construction. Each participant must have achieved a minimum total turnover of 50, 000, 000 (fifty million) leva excluding VAT, including a minimum turnover in the scope of the contract, amounting to 50, 000, 000 (fifty million) leva excluding VAT calculated on the basis of annual turnover for the last three years(2015, 2016 and 2017 years) depending on the date when the participant was established or started its activity. Each participant must have professional liability insurance for the participants in the construction under Article 171 of the TDA, covering the minimum insurance sum for construction - first category according to the Ordinance on the conditions and the procedure for compulsory insurance in thedesign and construction; or equivalent under Art. 171a of the Territory Control Act
In connection with the Company's security requirements, visits to the refinery shall take place only on working days (from 08:00 am to 16:00 am) after issuing the respective entry pass in strict compliance with the requirements of the mode. Making a pass is done after a written request and a scanned copy of the documenta statement proving the representative authority of the participant / representative or a journalistic map of the media representatives
[email protected] until 14:00 on the working day prior to the date of entry.
Internet address (URL): http://neftochim.lukoil.com/bg/