DESIGN PRO LTD. has floated a tender for Contract notice: Generator units. The project location is Ireland and the tender is closing on 24 Aug 2018. The tender notice number is 362234-2018, while the TOT Ref Number is 25975912. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Ireland

Summary : Contract notice: Generator units

Deadline : 24 Aug 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 25975912

Document Ref. No. : 362234-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : DESIGN PRO LTD.
Office Name: Design Pro Ltd.
Address: Rathkeale Industrial Estate
Town: Rathkeale
Postal Code: Co Limerick V94 ESC
Contact Point: Karolina Mazurek

Phone: +353 6963842
Ireland
Email :accounts@designpro.ie
URL :http://designproautomation.com/

Tender Details

Object of the contract
Generator units

Description: Contract notice: Generator units

Authority Type: Other
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 31122000, 31122000, 31122000
CPV Description: Generator units.

Design and supply of a power take off converter and control system for a 60 kw hydro-kinetic turbine

Reference Number : DPR 60 PTO Controller

DesignPro is developing a hydro-kinetic turbine to generate electrical power from water flows. The turbine design deploys 2 hydrokinetic turbines connected to in-line gearboxes that drive standard 3 phase induction motors. Given the fluctuating power to be derived from variable water flows, the rotational speed of the turbines must be controlled to standardise the power output, which will need to be adapted to a standard acceptable for grid connection. Accordingly, the Company requires the design, supply and testing of an "AC to AC" power conversion unit together with a control system that is capable of managing the adaptation of the power output to grid acceptable standards.

Main Site : Rathkeale, Co Limerick, Ireland

DesignPro is developing a hydro-kinetic turbine to generate electrical power from water flows. The turbine design deploys 2 hydrokinetic turbines connected to in-line gearboxes that drive standard 3 phase induction motors. Given the fluctuating power to be derived from variable water flows, the rotational speed of the turbines must be controlled to standardise the power output, which will need to be adapted to a standard acceptable for grid connection. Accordingly, the Company requires the design, supply and testing of an "AC to AC" power conversion unit together with a control system that is capable of managing the adaptation of the power output to grid acceptable standards.

Respondent must be able to demonstrate relevant history and expertise in respect of the proposed supply of electrical conversion and controller system.


Internet address (URL): http://designproautomation.com/