Contract notice: General construction work Tender - 39704720
Tender notice from Romania, published on 15 Jan 2020.
Executive Summary
The S.C. RAJA S.A. CONSTANȚA has issued a Tender notice for the procurement of a Contract notice: General construction work for pipelines in the Romania. This Tender notice was published on 15 Jan 2020 and is scheduled to close on 20 Mar 2020, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 39704720, while the tender notice number is 020339-2020 and Register on the platform.
Key facts
Summary
Contract notice: General construction work for pipelines
Object of the contract General construction work for pipelines Description: Contract notice: General construction work for pipelines Authority Type: Utilities entity Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45231100, 45231100, 45231112, 45232150, 45232152, 45232411, 45231100, 45231112, 45232150, 45232152, 45232411 CPV Description: General construction work for pipelines. Installation of pipe system. Works related to water-distribution pipelines. Pumping station construction work. Foul-water piping construction work. Mangalia water networks and resorts. Rehabilitation and extension of manholes and sewerage networks Mangalia and resorts Reference Number: 1890420/2019/7 / CL 16 CL 17 POIM Contract execution activitiestele works "Mangalia water networks and resorts. Rehabilitation and extension of manholes and sewage networks Mangalia and resorts "are grouped on 2 lots: Main Site: Mangalia City Ob. 1 Rehabilitation of water distribution network in Mangalia municipality • Rehabilitation of water distribution network, with pipelines PEID, PE 100, SDR26RC, PN 6, 110 mm, 160 mm, 180 mm and 250 mm, Total = 11.860 m; • Rehabilitation of the water distribution network, with pipelines PEID, PE 100, RC, SDR17, PN 10, 400 mm and 500 mm, Ltotal = 4, 139 m; Ob. 2 Extension of the water distribution network in the municipality Mangalia • Expansion of distribution network, with pipelines PEID, PE 100, SDR26RC, PN 6, 110 mm, 160 mm and 250 mm, Ltotal = 5, 025 m; Ob. 3 Rehabilitation of the sewage network in Mangalia municipality • ReEnabling domestic sewerage network with PVC pipes, SN8, PE100, DN 250 mm Dn 315mm, Ltotal = 370 m; • Rehabilitation of the sewerage network with pipes from PAFSIN, SN10000, Dn 600 mm, Ltotal = 64 m; Ob 4 Expansion of the domestic sewerage network in the municipality of Mangalia • Extension of the domestic sewerage network with PVC pipes, SN8 Dn 250mm Dn 315 mm, Ltotal = 10, 185 m; • Extension of the networksRON for sewage sewerage with pipes from PAFSIN, SN10000, Dn 600 mm, Ltotal = 310 m; Ob. 5 Domestic wastewater pumping station and discharge pipe • Domestic wastewater pumping station SPAU Dobrogea 2 1 pcs • Relief pipe for the SPAU Dobrogea 2, from PEID, PE 100 RC, SDR 17, PN 10, 180 mm, L = 542 m; Ob. 6 Measurement points of flow, electrically operated valves and pressure (conform LDC-D-6) Equipment (according to LDC-D-7) • Mobile generator set, including 1 piece road trailer Requirement no. 1. The bidders, associations, third-party supporters and subcontractors must not find themselves in the situations provided in art.177, art.178 and art.180 of the Law 99/2016 regarding the sectoral procurement. The DUAE of call the operators participating in the procedure (Bidders, associations, third party supporters and subcontractors), with the information related to their situation. place. The information in the aforementioned certificates is threethey must be real / valid at the time of presentation. These documents are: O The criminal record of the economic operator and of the members of the administration, management or supervision body of the respective economic operator, or of those who have the power of representation, of decision or control within it, as it results from the certifying certificate issued by the ONRC / the constitutive act; A Certificate confirming the lack of outstanding debts regarding the payment of taxes, taxes or contributions to the consolidated general budget at the time of their presentation. 179 para. (2), art.180 para. (2), art. 184 of Law 99/2016 regarding the acquisitions sec Other construction documents, as the case may be. Non-resident economic operators (foreigners) have the right to present any building documents to prove that they have fulfilled their obligations to pay taxes, taxes and contributions to the general consolidated budget, in accordance with with the requirements of the country of origin or the country in which the bidder / candidate is established, ereleased by the competent authorities of the country of origin (such as certificates, tax filings or other equivalent documents). The documents will be presented with their authorized translation into Romanian. Note 1: Any economic operator in any of the situations provided in art. 177, 178 and 180 of Law 99/2016, which attract exclusion from the award procedure can providethere is evidence to show that the measures taken by him are sufficient to demonstrate in concrete terms his credibility by reference to the reasons for exclusion in accordance with the provisions of art 184 of law 99 / 2016. Note 2: The forms and / or documents requested above, will be presented by the bidder ranked first, by each member of the association (in the case of an association), and, if applicable, by the subcontractor and by the supporting third party. Requirement no. 2- Avoidance of conflict of interest The bidders, associations, third parties and subcontractors must not find themselves in the situations provided in art. 72 and 73 of Law no.99 / 2016 on sectoral acquisitions updated.bidder / candidate, third party supporter and subcontractor, as the case may be, with relevant information, according to art. 202-204 of Law no. 99/2016 updated. The persons with decision-making functions within the contracting entity regarding the organization, development and completion of the award procedure are presented in the statement of the manager of the contracting entity, part of the public procurement fileand are the following: 1. Felix Stroe General Manager; 2. Aurel Presura - Deputy General Manager; 3. Tereza Baranescu - Economic Director; 4. Elena Sfrija - Legal Director; 5. Ion Preda - Director of External Development and Finance; 6. Stelian Budes - Deputy Director of External Development and Finance; 7. Rodica Mihai - Adj. Director of External Development and Finance; 8. Adriana Lascu - Adj. Director External Development and Financing; 9. Antoniu George B ... details on www.e-licitatie.ro Lots: 2 Annual general turnover Minimum annual turnover, realized in each of the last three years (2016, 2017, 2018) must be higher or equal to: 20, 000, 000 RON. If several economic operators jointly participate in the award procedure, the fulfillment of the criteria forreselling the economic and financial situation is demonstrated by taking into account the resources of all members of the group. Each economic operator (single bidder / associated bidder) will complete the corresponding fields in the DUAE regarding economic and financial capacity. Third Party Supporter If the tenderer demonstrates his economic and financial situation, also invoking the supportgranted by one or more third parties, then the bidder has the obligation to prove to the contracting entity that he has taken all necessary measures to have access at all times to the necessary resources, presenting a commitment to this effect from the third party / third parties. According to art. 198 of Law no. 99/2016 the economic operator the third party / third party supporter / supporters will respond insolidarity for the execution of the sectoral contract. By the firm commitment, the third party / third party will confirm that they will support the tenderer in order to fulfill the contractual obligations, either by specifying the way in which they will / will intervene concretely in order to fulfill the respective obligations for which he has provided the support, either by indicating the financial resources you will be able toavailable to the tenderer (describing the concrete way in which he will do this). With the support commitment, the bidder has the obligation to present documents transmitted to it by the third party (s), from which it will be shown the way of fulfillment by which the third party (s) the sponsor (s) will / will ensure the fulfillment of their support commitment, documents that will be fulfilled. will constitute anexus to that commitment. The supporting third party will respond in solidarity with the bidder, unconditionally, to the contracting entity for not fulfilling any obligation assumed by the bidder, based on the sectoral contract, and for which the latter has received the economic and financial support according to this commitment, renouncing in this meaning, definitive and irrevocable, invthe benefit of division and discussion. Each third party supporter will complete the appropriate fields in the DUAE regarding economic and financial capacity. The third party must not be in the situation provided by art. 177, 178 and 180 of Law 99/2016, under the sanction of exclusion from the award procedure. Lots: 1 General annual turnover Annual turnover minima, realized in each of the last three years (2016, 2017, 2018) must be greater than or equal to: 30, 000, 000 RON. If several economic operators jointly participate in the award procedure, the fulfillment of the criteria regarding the economic and financial situation is demonstrated by taking into account the resources of all group members. Each economic operator (bidderunique / associated bidder) will complete the corresponding fields in DUAE regarding economic and financial capacity. Third Party Supporter If the tenderer demonstrates his economic and financial situation by invoking the support granted by one or more third parties, then the tenderer has the obligation to prove to the contracting entity that he has taken all necessary measures to havecces at any time to the necessary resources, presenting a commitment in this regard from the third party / third parties. According to art. 198 of Law no. 99/2016 the third party economic operator / third party supporters / supporters will be jointly and severally liable for the execution of the sectoral contract. By firm commitment, the third party / third party will / will confirm that they will / will support the bidder in order tothe fulfillment of the contractual obligations, either by specifying the way in which they will / will intervene concretely in order to fulfill the respective obligations for which he granted the support, or by indicating the financial resources that he will make available to the tenderer (describing the concrete way in which he will perform this thing). With the support commitment, the bidder has the obligation to submitdocuments transmitted to it by the third party / third party supporters, from which the result of the way in which the third party / third party (s) will ensure the fulfillment of their support commitment, documents that will be annexed to the respective commitment. The supporting third party will respond jointly with the tenderer, unconditionally, to the contracting entity for non-performancethe area of any obligation assumed by the tenderer, based on the sectoral contract, and for which the latter received the economic and financial support according to this commitment, renouncing in this sense, definitively and irrevocably, to invoke the benefit of division and discussion. Each third party supporter will complete the corresponding fields in the DUAE regarding economic and financial capacitynancial. The third party must not be in the situation provided by art. 177, 178 and 180 of Law 99/2016, under the sanction of exclusion from the award procedure. - The bidders have the obligation to carefully analyze the Attribution Documentation and to pfind the offer according to all the instructions, the forms, the contractual provisions and the technical specifications contained in this Documentation, - We mention the fact that in order to view the award documentation uploaded in SICAP, the economic operators, must have a program necessary to view the electronically signed files, this program being available free on the provided sitesat the time of electronic signature, - An economic operator can participate in the procedure only if it is registered in SICAP, - The correspondence and all the documents submitted by the economic operators will be in Romanian, or accompanied by an authorized translation in Romanian, - The documentation of the award is posted in full within the participation announcement published on the site www.e-licitatie.ro, - SolThe clarifications of the potential bidders will be addressed exclusively in the SICAP to the "Questions" section of the award procedure carried out by electronic means, - The answers to the requests for clarifications will be posted in legal term under the "Documentations, clarifications and decisions "of the participation announcement published on the site www.e-licitatie.ro, - Eva CommissionThe submission will send the requests for clarification regarding the offers submitted, in SICAP to the "Questions" section. The economic operators will send the answers to the clarifications and the eventual documents requested during the evaluation of the offers through the SICAP ("Questions" section), completely in the section corresponding to the respective request, in the form of one or more documents / filesdistinct signed with the valid extended electronic signature, based on a qualified certificate not suspended or revoked at the time of the offer signing, in accordance with the legal provisions regarding the electronic signature, - In the case of the bidders (natural or legal persons) of a different nationality than the Romanian one, the documents will be transmitted in the language in which they were issued, accompanied by the translatoris authorized in the Romanian language, - In case two or more offers ranked first have equal scores, the bidders will be asked for a new financial proposal, in which case the contract will be awarded to the bidder whose new financial proposal has the lowest price and gets the highest total score, - The duration of the execution contract is 365 days (from the date The duration of the guarantee period is 1095 days. NOTE Given the fact that starting with 08.04.2019, the Single European Procurement Document (DUAE) was integrated into the SICAP, the bidders, the associations, third-party supporters and subcontractors will individually complete DUAE in SICAP, according to the instructions given by ANAP and the User`s Guide.the compliance with the legal provisions regarding the electronic signature, after completing them in the SICAP, the DUAE forms will be printed in PDF format, will be signed with the electronic signature and uploaded in the SICAP along with the offer documents. Internet address (URL): http://www.rajac.ro/
The bid deadline for Contract notice: General construction work for pipelines was 20 Mar 2020. Bidding is closed.
This tender has been issued by S.C. RAJA S.A. CONSTANȚA in Romania.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45231100 - General construction work for pipelines, 45231112 - Installation of pipe system, 45232150 - Works related to water-distribution pipelines, 45232152 - Pumping station construction work, 45232411 - Foul-water piping construction work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 39704720. The purchaser document reference is 020339-2020.