Object of the contractGames and toys; fairground amusements
Description: Contract notice: Games and toys; fairground amusements
Authority Type: Other
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 37500000, 37535200, 37500000, 37535200
CPV Description: Games and toys; fairground amusements.
Playground equipment.
Design, execution, delivery and assembly of educational models for the Garden of Experiences. Stanisław Lem as part of the project "Winter Garden of Experiences extending the offer of Garden of Experiences"
Reference Number: DR.26.3.2019
The subject of this contract is to design, manufacture, supply and install educational models for the GardenOf experiences Stanisław Lem as part of the project "Winter Garden of Experiences, expanding the offer of the Garden of Experiences St. Lema w Krakowie ".
Main Site: Stanisław Lem Garden of Experiences, al. Pokoju 68, 31-580 Krakow, POLAND.
As part of the subject of the contract in Part 1, the Contractor:
a) will develop complete design documentation of educational models for the Garden of Experiments Stanisław Lem letEmployer to assess the functional, material, functional and aesthetic parameters at the contract implementation stage, in particular: drawings with dimensions, projections along with the correct arrangement of equipment, technical and material specifications, description of the educational model, description of the assembly, description of the adopted quality solutions, material and finishing, documentation of the areaexecutive, which should be understood as project documentation taking into account changes made during the implementation of the educational model, instructions for use and operation;
b) will make and provide educational models to the Garden of Experiences. Stanisław Lem in accordance with the design documentation approved by the Employer;
c) will complete the assembly of models in accordance with the final plan for the deployment of the modeli provided by the Employer at the stage of contract implementation (a preliminary plan for the distribution of educational models is included in Annex 7 to the ToR) and in accordance with the guidelines contained in Annex 6 to the ToR;
d) provides quality guarantee and warranty for the period indicated in the offer
detailed condition in this respect.
The Purchaser does not set a detailed condition in this respect.
1. The contractor, in relation to which any of the circumstances referred to in art. 24 paragraph 1 point 12 23 and specified in art. 24 paragraph 5 points 1) and 8) of the Public Procurement Law
2. The contracting authority informs that in these proceedings it will apply the so-called "Inverted", described in the content of Article 24aa of the PPL, i.e. it will first evaluate the offers, andthen it will examine whether the contractor whose tender has been assessed as the most advantageous is not subject to exclusion and meets the conditions for participation in the procedure.
3. The Contractor is obliged to attach to the offer:
a) a current statement as at the date of submitting the offers constituting a preliminary confirmation that the Contractor is not subject to exclusion and meets the conditions for participation in the procedure, submitted at Uniform EuropePolish Order Document (EAT), prepared according to the model (form) constituting Annex 2 to the ToR, regarding:
i. contractors (in the case of contractors jointly applying for the award of each of them);
ii. entities on whose resources the contractor relies in order to demonstrate compliance with the conditions for participation in the proceedings,
In the absence of grounds for exclusion and compliance withand the conditions for participation in the procedure (part II, III of the single document to the extent relevant to the conditions specified in Article 24 (1) and paragraph 5 item 1) and 8) of the Public Procurement Law), part IV in the alpha section) of the single document (in the case of completing the section alpha). The contractor does not need to complete any of the other sections in Part IV of the single document.)
Note! Contractors are required to submit the formEAT in electronic form, in the manner specified in detail in the content of Chapter X of the ToR;
b) proof that the contractor will have the necessary resources of another entity - referred to in Chapter VII paragraph 2 ToR (if applicable);
c) Power of attorney to represent all Contractors jointly applying for the award of the contract, possibly a cooperation agreement, which will result fromsubject power of attorney, signed by a qualified electronic signature by the person (s) authorized to represent indicated in the relevant register. A proxy may be appointed to represent Contractors in proceedings or to represent in proceedings and conclude a contract, pursuant to art. 23 clause 2 of the Public Procurement Law;
d) power of attorney to sign the offer signed by a qualified signaturem by electronic person / s authorized to represent indicated in the relevant register, if it does not result from the documents referred to in Chapter VII of the ToR.
4. A detailed description of the documents that the Contractor shall request to submit, requested by the Employer in order to confirm compliance with the conditions for participation in the procedure and to demonstrate the lack of grounds for exclusion from the procedureindicated in Chapter VII para. 7 ToR. Requirements of the Employer in relation to entities with registered offices outside of Poland are specified in Chapter VII para. 8-13 of SIWZ.
5. According to art. 13 section 1 and 2 of Regulation (EU) 2016/679 of the European Parliament and of the Council of 27.4.2016 on the protection of individuals with regard to the processing of personal data and on the free movement of such dataand repealing Directive 95/46 / EC (General Data Protection Regulation) (Journal of Laws EU L 119 of 4.5.2016, p. 1) hereinafter "GDPR" we inform that:
a) the administrator of personal data provided by the Contractor is the Employer of the Museum of Municipal Engineering in Krakow, with its registered office at ul. Św. Wawrzyńca 15, 31-060 Krakow, POLAND, tel. 48 124286600, e-mail regarding personal data:
[email protected];
b) the processing of personal data by the Employer is necessary for purposes arising from legitimate interests pursued by the Employer and the fulfillment of the legal obligation incumbent on the administrator;
c) the legal basis for the processing of personal data is Art. 6 clause 1 lit. b and c GDPR
6. For more information on personal data, see Chapter XI of the ToR.
Internet address (URL): http://www.mim.krakow.pl