Procurement Summary
Country : Hungary
Summary : Contract notice: Furnace burners
Deadline : 22 Oct 2019
Other Information
Notice Type : Tender
TOT Ref.No.: 36429401
Document Ref. No. : 439471-2019
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : GY?R-SZOL GY?RI KÖZSZOLGÁLTATÓ ÉS VAGYONGAZDÁLKODÓ ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG
Office Name: GY?R-SZOL Gy?ri Közszolgáltató és Vagyongazdálkodó Zártkör?en M?köd? Részvénytársaság
Address: Orgona utca 10.
Town: Gy?r
Postal Code: 9024
Contact Point: Ormos Judit
Phone: +36 96501200
Fax: +36 96417386
Hungary
Email :kozbeszerzes@gyorszol.hu
URL :http://www.gyorszol.hu
Tender Details
Object of the contract
Furnace burners
Description: Contract notice: Furnace burners
Authority Type: Utilities entity
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 42310000, 42390000, 45331110, 45262680, 45310000, 48151000, 71240000, 42310000, 42390000, 45331110, 45262680, 45310000, 48151000, 71240000
CPV Description: Furnace burners
Parts of furnace burners, furnaces or ovens
Boiler installation work
Welding
Electrical installation work
Computer control system
Architectural, engineering and planning services
Delivery, installation, commissioning of boilers
Reference Number : EKR001166932019
Contract for supply of PTVM-50 type forrovizo boiler, installation of boiler units related to this
Main Site: Forward Water Boiler Service (9028 Gyor, Rozgonyi u. 44) Forward Water Boiler
For Power Boat Service Director (9028 Győr, Rzg. ARC. site for PTVM-50 type forroviz boiler (4 pieces)
delivery (manufacture, packaging, transportation), installation and related tasks (design, licensing, dismantling, on-site construction (machinery, electricity, statics and document technology)), installation (documenting this issue, documentation). The exact technical specifications are detailed in the technical specification. (In the overcast and beyondReferences in the contract documents to the specific product type shall only be used for the purpose of unambiguous identification of the goods and related products to be supplied. before the start of my probe, an independent expert trusted by AKUnified Warranty Mariners must certify:
Nominal useful output heat output of at least 58 MW; (XII.4.) Of the Ministry of Transport and Communications (VM) on emission of pollutants in the full load range of the boiler.a: 15.4.2020 es 30.4.2020. coezoett (prerequisite for commencement of demolition work to obtain special permits and other permits),
- completion (machinery, electricity, statics and accounting technology): 15.09.2020. - Started: 17.11.2020, subject to the conditionally warranted performance of the warranty,
- Duration: Incremental 240 hours.
Technical Attestation (Civil Code 6: 247 (2): up to 30 calendar days) Completion: 17.12.2020
Assignment of working body and acceptance of warranty by seamen are accepted. (Warranty and other claims management): According to the recommendation of the offerer (min. 24 months)its zigzag object is a complex set of tasks, the essential breakdown of which is impossible. Benchmarked for bidding, there is a single guarantee for claims management, high-level coordination of tasks.This is a technical description of the contract and a draft contract.
List of exclusions:
1. in the process, they may not be tenderer (AT), subcontractor (AV), and shall not be eligible for certification as an economic operator to whom the Kbt. One of the exclusion clauses in - 62 (1); procedures may not include AT, AV, and may not include a certificate of aptitudeyan is an economic actor against whom Kbt. Exclusion for the purposes of - 62 (2).
List of Certification Modes and Description of Roevid:
The AT and the Certified Economic Operator (GSZ) are subject to the Kbt. According to Masodik Resze, in the process of co-procuring, when submitting an offer, Kr. In accordance with Chapter 2-7, the single European co-procurement document(EEKD) must be notified in advance that it does not belong to Kbt. - 62 (1) and (2).
At the time of filing, AT must declare that it will not accept the performance of the contract under the exclusive grounds of - 62 (1) - (2). rain AV. The statement must be submitted even if the AK has not specified the known AVs in the procedure.
AK under Kbt. - 69 (4) to (8), the submission of certificates of exclusion to an economic operator who has been called upon pursuant to Article III of the Criminal Code. In accordance with Sections 8 and 10 of this Chapter, you must certify that you are not subject to the exclusion criteria set out in the Procedure, and further state whether you are in the process of changing your listing before the company and, if so, attach
The Variety Register Claim filed with the Cegbirosag and the certificate of its receipt, which was negotiated with the Cegbirosag. Certificates certified in Sections 8-16 of the Chapter may not be obtained if AK is in accordance with the Kbt. In accordance with Article 69 (11), koezvetlenuel attachafer to databases not mentioned in the relevant Chapters, which show the existence of reasons of ineligibility or economic capacity, and the economic operator noted their availability in the EEKD. The proofs mentioned in Sections 8-16 of the Chapter may be pronounced in accordance with Chapter V if the economic operator in question proves that he meets the requirements of the Collective Procurement Procedures by means of qualified references.created certificates may be retrieved (used) for as long as the contents of the certificate or certificate are valid. Unless AK has evidence to the contrary, the data content of the data is the subject of a statement by the tenderer in this respect. According to Masodik Resze, in the process of co-procuring, when entering an offer, the II. According to chapter, in EEKDyujtasa must first confirm that it complies with the Kbt. - 65 is based on the eligibility criteria determined by the AK.
The AK accepts the simple declaration of eligibility by the economic operator in question, without prejudice to Section IV of the EECD. the details of the file. Since AK accepts eto put it simply, you don`t have to get fit in the EEKD. (AK hereby calls AT`s attention to the provision of - 62 (1) (i) Kbt.) The verification modalities mentioned in this chapter can be appropriately stated in Chapter V if the economic operator in question proves that he meets the requirements of the co-procurement procedurefor koasertam foreseen in aras
Kbt. Certificates according to - 69 (4):
To be submitted by the AT or other organization accepting the certificate of aptitude
P1) to submit the declaration of AT according to - 19 (1) c) of the AT, from the activity of co-purchasing (transporting and installing rowers with beezemeless)Mazo - General Sales Tax Calculated - Arbitrary Income
If GSZ does not have the documents and data required above because it operates in a legal form that is not possible in respect of the merchandise or the Arbitration Income Statement he may proceed in accordance with - 19 (3) of the Criminal Code.t is required to meet the requirements of the other organization, Kbt. Relevant declarations and certificates according to - 65 (7) - (8) shall also be submitted in the offer. In addition, the Certification Authority is required to prove that it is fit for purpose, as justified above. (Section 67 (3) Kbt.)
1. Felhivas IV.2.6) In the case of a home day = 30 days, subject to - 81 (11) Kbt., the "Starting Day" under point II.2.7) is the intended date of the contract test, which may vary from one year to the next. This does not, however, affect the dates announced in II.2.4 / "Uplifting" or II.2.7 / "Finishing".
2.it must be made available by the end of the time, the time of the trial trial must be firm. Mod: Deposit 11737007 20703121 or collateral under a penzuegyte or insurer, or collateral, or a collateral under a collateral. Koezoes AT is enough once. Read Kbt -54 (4) - (7), EKR Kr 10. - (4).
3. Bidder applies Kb in this procedure. - 74 (2).
4. Critical value or inconsistency with respect to tender offer: none
5. Suitability: Condition, proof min. ATs are stricter with notes
6. AK does not order a new hianypotl for a newly named AV according to Kbt.71 (6).
7. Kieg.taj. can be searched according to Kbt.56 - (1), answer Kbt.56 - (2) - (5)according to the ECR (ECR - 2). No consultation, will be on site visit: October 08, 2019, 10:00 am, on site. Further requirements regarding the content, submission, accountability, translation, certification modalities, verified needle letter, record time of the offers are included in the Co-Procurement Document. AK does not require, so you do not have to appear in the offeri the co-contractor (s) for which the AV AV is to be completed and the AV AVs known at the time of submitting the quotation need not be provided. (Kbt.66.- (6)).
10. Declarations and certifications: primarily, but not exclusively, in Section 66 (2), (5) and (6) of the Kbt. optionally Kbt. -- 65 (7) - (8), (12), ill. Yes. - 35 (2a).
Which is my statementinta electronic declaration form (EUe) in the ECR the declaration is in the language of the lien, the declaration must be made in the EUe, which is provided by me in - 13 (1) ECR
Koezoes ATs in the EU
AK is willing to accept if AT submits the EEKD used in a previous co-purchase procedure under -7C, provided that its contents are correct.
EEKThe AT is responsible for the accuracy of the information contained in D (Art. 17 (1)). felf and the exclusion. ok ig to the Kbt. He is also entitled under Article 69 (11a). Cegnek qualifies as AT, an organization under -65 (7) Kbt. a certified Cegalairas statement (a cimpeldany with co-notary alairas authentication) or a lawsuit pursuant to - 9 (3) of Act V of 2006or a sample of alairas countersigned by a chamber attorney;
b. and, where applicable, the power of attorney as specified in the documentation. The suggestion price should include full implementation of the task. Commercial-professional quotation is submitted by elvaras.
13. FAX: Adamne Judit Egri (registration number 00239). AK does not apply - 75 (2) (e) of the Civil Code.
15. Felhiv III.2.2) afternt app. Legislation: Yes. 135.- (1), (5) - (6); CXXVII. tv; CC. 6: -- 130 (1) - (2)
Continued at VI.4.3)
Internet address (URL): http://www.gyorszol.hu
Documents
Tender Notice