Object of the contractFleet management, repair and maintenance services
Description: Contract notice: Fleet management, repair and maintenance services
Authority Type: Regional or local authority
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 50111000, 34000000, 34431000, 22460000, 35120000, 48151000, 48220000, 50111000, 34000000, 34431000, 22460000, 35120000, 48151000, 48220000
CPV Description: Fleet management, repair and maintenance services.
Transport equipment and auxiliary products to transportation.
Non-motorised bicycles.
Trade-advertising material, commercial catalogues and manuals.
Surveillance and security systems and devices.
Computer control system.
Internet and intranet software package.
Zorganizowanie, zarządzanie i utrzymanie systemu rowerow miejskich w Opolu w ramach przeOpolski Rower Miejski (ORM)
Reference Number: ZP.271.2.5.2019
The subject of the order is the organization, management and maintenance of the municipal bike system in Opole as part of the Opolski Rower Miejski (ORM) project.
Main Site: Opole
The subject of the order is to organize, management and maintenance of the city bike system in Opole as part of the Opolski Rower Miejski project(ORM).
The scope of the order includes in particular:
1. execution and agreement with the Employer: a bicycle design that meets the basic requirements of the Employer, bicycle station equipment, ORM system website design fully compatible with the system operation software, ORM use regulations and the Customer Service Center (BOK),
2. delivery and assembly of the deviceń which are complete equipment for 18 bicycle stations,
3. delivery of min. 200. pieces of bicycles equipped with on-board computers (bicycles so-called IV generation) of the city type and supply of reserve 10 pieces of bicycles (the number of bicycles ordered will result from the Contractor's tender offer),
4. having a comprehensive IT system (software) with the ability to operate and monitor the functionthe system by the Employer using a web browser,
5. support for the ORM system website,
6. training persons indicated by the Ordering Party in the scope of ORM monitoring,
7. running a Customer Service Office,
8. providing a bicycle service in the city of Opole,
9. comprehensive maintenance and management of the ORM system during the term of the contractIt allows changing the contract in the following cases:
a. increase in the number of city bikes during the term of the contract,
b. application of modern technologies agreed with the Employer,
c. statutory change of VAT,
d. statutory change in the amount of the minimum wage, with the proviso that a change in the remuneration of the Contractor may only be a consequence of a change in the amount of the wagefencing the minimum persons employed under a contract of employment with the minimum wage participating in the implementation of the contract, in the period after the entry into force of a specific legal act increasing the amount of the minimum wage. Documenting these circumstances rests with the Contractor, e. statutory change of social and health insurance rules, with the Contractor should calculateshall submit an offer for known published provisions on the day preceding the deadline for submitting bids,
f. having the character of changes irrelevant to the content of the offer, on the basis of which the Contractor was chosen,
g. the Contractor's failure to meet the deadlines under the Agreement for reasons beyond his control which he could not have foreseen at the time the Agreement was concluded - if these changes arehave had an impact on the cost of ordering by the Contractor. - The condition of contract amendment will be the documented request of the Contracting Party, and the change may occur if its introduction is necessary for the correct implementation of the order and the contracting parties agree to this.
The ordering does not provide for the order to be referred to in art. 67 sec. 1 point 6 The Law of Repeating Likeservices.
Pursuant to art. 45 par. 1 Rights The Ordering Party requires the Contractors to pay a bid bond. The Contracting Authority specifies the amount of the bid bond in the amount of PLN 50, 000. Detailed information is included in the SIWZ, available at https://www.bip.um.opole.pl/przetargi=1&rok=2019&mc=2&eid=4613.
O contract may be awarded to Contractors who are not subject to exclusion. excludes from the proceedingsfor awarding a public contract to the Contractor against which there will be reasons for exclusion, referred to in art. 24 sec. 1 and par. 5 points 1 and 5-8 Rights
1. The Contractor is obliged to submit in electronic form a statement valid as of the day of submitting bids constituting preliminary confirmation that the Contractor is not subject to exclusion and meets the conditions for participation in the proceedings in the form ofa single European order document, drawn up in accordance with the standard form provided for in the Commission Implementing Regulation issued on the basis of art. 59 par. 2 of Directive 2014/24 / EU, hereinafter referred to as the "Single European Order Document (abbreviation: EAT)." Formula EED is attached to the ToR.
The Contractor is obliged to complete the EED to the extent that the Order is madeable to verify whether the Contractor meets the conditions for participation in the proceedings and is not subject to exclusion to the extent described in the ToR.
The Contracting Authority places the link of the Public Procurement Office on the website www.bip.um.opole.pl to the instructions for completing the Single European Order Document under address: https://www.uzp.gov.pl/data/assets/pdf_file/0015/32415/Instrrukcja-wypelniania-JEDZ-ESPD.pdf
In the event of a joint application by the Contractors, the Single European Order Document shall be submitted by each of the Contractors. The statement is to confirm the fulfillment of the conditions for participation in the proceedings and the lack of grounds for exclusion to the extent that each of the Contractors demonstrates that they fulfill the conditions for participation in the proceedings and no grounds for exclusion.by the Contractor, the part of the orders, the implementation of which he intends to entrust to subcontractors (in the form tender bid) and the submission by the contractor of subcontractors companies (in the statement EAT).
2. Contractor who refers to the resources of other entities in order to demonstrate the lack of grounds for exclusion and fulfillment to them in so far as it refers to their conditional resourcesu in the proceedings also submits the statement referred to in point 1 of this chapter regarding these entities / includes information about these entities in the statement referred to in point 1 of this chapter.
To the tender form, the Contractor is obliged to attach:
a. If you demonstrate technical or professional capacity or financial or economic situation that your thighAnother entity: an obligation signed with a qualified electronic signature by the person / persons representing the disclosing entity.
b. Document confirming the deposit payment.
C. Power of attorney, if the Contractor has appointed a plenipotentiary, mandatory power of attorney in the case of a consortium. - Contractor within 3 days of posting on the website information referred to in art. 86paragraph. 5 of the Law, it provides the Ordering Party with a declaration of belonging or non-affiliation to the same capital group as referred to in art. 24 sec. 1 point 23 of the Law. In the case of belonging to the same capital group, the Contractor may submit together with the statement documents or information confirming that connections with another contractor do not lead to distortion of competition in the proceedingsfor ordering.
Pattern of the declaration attached to the ToR.
Documents bearing a qualified electronic signature by persons authorized to represent the Contractor should be sent to the following e-mail address:
[email protected].
Cd. dot point III.1.3)
If the Contractor is established or resides outside the territory of the Republic of Poland, instead of the documents referred to in point b, c, d, e compositionda respectively:
B1. information from the relevant register or, in the absence of such a register, another equivalent document issued by the competent judicial or administrative body of the country in which the contractor has its registered office or place of residence is the person who is the information or document, to the extent specified in art. 24 sec. 1 points 13, 14 and 21 of the Law and, regarding convictsand for offenses on custody, to the extent specified by the ordering party under art. 24 sec. 5 points 5 and 6 of the Rights issued not earlier than 6 months before the deadline for submitting offers.
C1., D1., E1., - document or documents issued in the country in which they have their registered office or place of residence, confirming that: - it is not in arrears with paying taxes, fees, insurance premiumssocial security or health care, or that it has entered into an agreement with the competent authority regarding the repayment of such claims together with any interest or fines, in particular it obtained the legally required exemption, deferral or installment payment of overdue payments or suspension of enforcement of the decision of the competent authority issued not earlier than 3 months before the deadline for submission- no bankruptcy liquidation has been opened or bankruptcy issued not earlier than 6 months before the deadline for submitting bids - if the country in which the contractor has its registered office or place of residence has the person the document relates to, it does not appear documents referred to in point b1., c1., d1. and e1., they are replaced by a document containing an appropriate onefor the contractor's statement, with an indication of the person or persons authorized to represent it, or a statement of the person to whom the document was to be applied, submitted to a notary or before a judicial, administrative or professional self-regulatory or economic authority competent for the seat or place of residence of the contractor or place of residence this person (issued with terms likeabove). - Contractor established in the territory of the Republic of Poland, in relation to a person residing outside the territory of the Republic of Poland, which is referred to in the document indicated in point b, submit the document referred to in point b1, to the extent specified in art. 24 sec. 1 items 14 and 21 and par. 5 point 6 Rights. If in the country in which the person has a place of residence, whose dockment was to relate, no such documents are issued, it is replaced by a document containing a statement made by the person before a notary or before a judicial, administrative or professional self-regulatory or economic self-regulatory body. The document should be issued not earlier than 6 months before the deadline for submission of offers
Internet address (URL): www.bip.um.opole.pl