Object of the contractExhibition equipment
Description: Contract notice: Exhibition equipment
Authority Type: Other
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 39154000, 39155000, 71000000, 71313400, 71320000, 71321200, 71323100, 71325000, 71326000, 71327000, 71330000, 71351910, 71400000, 71510000, 71521000, 71540000, 79932000, 71200000, 71220000, 71221000, 71240000, 71245000, 71247000, 71248000, 71250000, 71251000, 71300000, 92521200, 45000000, 45453000, 45343000, 45300000, 45400000, 45212310, 45212313, 39154000, 39155000, 71000000, 71313400, 71320000, 71321200, 71323100, 71325000, 71326000, 71327000, 71330000, 71351910, 71400000, 71510000, 71521000, 71540000, 79932000, 71200000, 71220000, 71221000, 71240000, 71245000, 71247000, 71248000, 71250000, 71251000, 71300000, 92521200, 45000000, 45453000, 45343000, 45300000, 45400000, 45212310, 45212313
CPV Description: Exhibition equipment.
Library furniture.
Architectural, construction, engineering and inspection services.
Environmental impact assessment for construction.
Engineering design services.
Heating-system design services.
Electrical power systems design services.
Foundation-design services.
Ancillary building services.
Load-bearing structure design services.
Miscellaneous engineering services.
Geologyservices.
Urban planning and landscape architectural services.
Site-investigation services.
Construction-site supervision services.
Construction management services.
Interior design services.
Architectural and related services.
Architectural design services.
Architectural services for buildings.
Architectural, engineering and planning services.
Approval plans, working drawings and specifications.
Supervision of building work.
Supervision of project and documentation.
Architectural, engineering and surveying services.
Architectural and building-surveying services.
Engineering services.
Preservation services of exhibits and specimens.
Construction work.
Overhaul and refurbishment work.
Fire-prevention installation works.
Building installation work.
Building completion work.
Construction work. for construction relating to exhibitions.
Museum construction work.
Development of design documentation for exhibition systems and design documentation for the reconstruction of historic blocks with inventory numbers A-8 and A-9 at the Auschwitz Museum. The subject of this order is part of the implementation of the investment project under the name: "The new Głownia exhibition in blocks with inventory noA-4, A-5, A-6, A-7, A-8 and A-9 at the Auschwitz-Birkenau State Museum in Oświęcim. "
Main Site: Oświęcim, POLAND
The subject of this order is part of the project investment under the name: "Nowa Głownia exhibition in blocks with inventory numbers A-4, A-5, A-6, A-7, A-8 and A-9 in the grounds of the Auschwitz-Birkenau State Museum in Oświęcim".It assumes the change and expansion of the permanent exhibition of the Museum, the content of which will be presented in blocks no inventory numbers A-4, A-5, A-6, A-7, A-8 and A-9 and will be divided into three (3) stages .
This order refers to the first stage of the project covering only Blocks A-8 and A-9.
The first stage of the project includes the following ranges:
a. execution of design works - madeDocumentation of the Contractor;
b. execution of construction and conservation works;
based on Project Documentation;
c. execution of exhibition space, including cabinets, based on the Exhibition System Documentation and Documentation Documentation.
The first stage of the project will be implemented as part of two separate orders: - Order No. 1 (being the subject of this announcement)includes the scope of a. and c. and Order No. 2 (which will be initiated separately by the Employer) will cover the scope of b. The subject of the Order No. 2 will be the Contractor's Documentation.
1. Contractors who are not subject to exclusion from the proceedings under Art. 24 sec. 1 item 13 to 23 and par. 5 points 1, 2, 3, 4, 8 Pzp.
2. Confirmation documentsno grounds for exclusion:
2.1. information from the National Criminal Register in the scope specified in art. 24 sec. 1 point 13, 14 and 21 of the PPL, issued not earlier than 6 months before the deadline for submission of tenders;
2.2. certificate of the competent head of the tax office confirming that the Contractor is not in arrears with paying taxes, issued not earlier than 3 months before the deadlineat the submission of offers or other documents confirming that the Contractor has concluded an agreement with the competent tax authority regarding repayment of such receivables with possible interest or fines, in particular obtained legally permissible, postponement or payment of overdue installments or suspension in full of the decision of the competent authority ;
2.3. proper certificatethe local organizational unit of the Social Insurance Institution or the Agricultural Social Insurance Fund or other document confirming that the contractor is not in arrears with paying social security or health insurance contributions, issued not earlier than 3 months before the deadline for submission of tenders, or other document confirming that the contractor has concluded an agreement with responsibleiymym authority regarding the repayment of these receivables, together with any interest or fines, in particular obtained the legally required exemption, deferral or payment in installments of overdue payments or suspension in full of the implementation of the decision of the competent authority;
2.4. excerpt from the relevant register or from the Central Register and Information on Economic Activity, if separate regulations require into the register or records, in order to confirm the absence of grounds for exclusion under Art. 24 sec. 5 point 1 Pzp,
2.5. the contractor's statement that he has not been the subject of a final court judgment or final administrative decision on default of taxes, fees or social security or health insurance premiums, or - in the event of such a decision or decision - a documentaryin confirming payment of these receivables together with any interest or fines or conclusion of a binding agreement regarding repayment of such receivables;
2.6. the contractor's statement about the lack of a ruling against him as a preventive measure of the prohibition against applying for public orders;
2.7. the contractor's statements about non-payment of taxes and local fees, of which I am speakingand in the Act of 12.1.1991. on local taxes and charges (Journal of Laws of 2016, item 716).
3. If the contractor is established or resides outside the territory of the Republic of Poland, instead of the documents referred to in point 2 of this section
3.1. submit information from the relevant register or, in the absence of such a register, another equivalent document issued by the competent judicial authorityy or administrative of the country in which the contractor has its registered office or place of residence or the person concerned by the information or document, to the extent specified in art. 24 sec. 1 points 13, 14 and 21 PPL,
3.2. submits a document or documents issued in the country in which the contractor has its registered office or place of residence, confirming that: a) it is not in default of paying taxes, fees, social security or health insurance contributions or that it has entered into an agreement with the competent authority regarding the repayment of such receivables with possible interest or fines, in particular it has obtained the legally required exemption, deferral or installment payment of overdue payments or suspension in full of the decision of the competent authority ;
b) its liquidation has not been opened or a declaration has been madezono bankruptcy. 1. The Contractor may, in order to confirm compliance with the conditions of participation in the procedure, in relevant situations and in relation to a specific order, or part thereof, rely on technical or professional capacity or financial or economic situation of other entities, regardless of the legal nature of the legal relationship he has with it. Contractor who relies onor the situation of other entities, must prove to the Ordering Party that, when performing the order, it will have the necessary resources of these entities, in particular by presenting the obligation of these entities to give them the necessary resources for the needs of the order.
2. Contractors may jointly apply for the award of the contract. Requirements for contractors in commonrequesting the order is described in Section IV of the ToR.
3. The Contractor will be bound by the offer for a period of 60 days.
4. Together with the offer, the contractor submits a statement valid as of the day of submitting bids constituting preliminary confirmation that it meets the conditions for participation in the proceedings and is not subject to exclusion in the form of a single document (in the scope and in accordance with the specimen set out in Annex 2 to SIWZ). The Contractor who relies on the resources of other entities to demonstrate the absence of grounds for exclusion and compliance with them, in so far as it relies on their resources, the condition of participation in the proceedings also includes uniform documents relating to these entities. The Contracting Authority provides for the possibility of supplementary procurement, referred to in art. 67 sec. 1 point 6 Pzp, whose total, total value will not exceed 50% of the value of the basic order. The scope of possible supplementary orders may be based on the repeated type of orders consistent with the subject of the basic order, in particular when there is a justified need to extend the subject of the order by carrying out design works, construction works or prac Conservation works for Blok-w A 8 and A 9 or their surroundings, in the area of their impact.
In particular, supplementary orders may include:
a) design works in the field of installations and constructions for construction works and maintenance works regarding the reconstruction of Block A 8 and A 9 conservation;
b) design work related to the components of the Systemand (c) works related to the development of maintenance programs; - d) construction and finishing works in the scope of Exhibition and implementation of individual elements of the Exhibition System.
Contractual conditions under which any supplementary orders will be granted: basis for negotiation conditions for the award of the contract will be a model ofthat does not differ significantly from the provisions of the design of material provisions of the contract constituting Annex No. 11 to the ToR.
6. In the proceedings for the order, the communication between the Employer and the Contractors is done using the miniPortal https://miniportal.uzp.gov.pl, EPUAP https://epuap.gov.pl/wps/portal or email
[email protected]6.1. Contractor intending to take part in the followingWhen applying for a public order, he must have an ePUAP account. The contractor having an account on ePUAP has access to the forms: submission, modification, withdrawal of the offer or application and to the communication form.
6.2. Technical and organizational requirements for sending and receiving electronic documents, electronic copies of documents and statements and information provided to themuse are described in the Regulations for the use of miniPortal and the ePUAP Regulations.
7. The Contracting Authority requires a bid bond in the amount of PLN 300, 000.00 (in words: three hundred thousand zlotys)
Internet address (URL): www.auschwitz.org