Contract notice: Engineering works Tender in Poland - 12434484
Tender notice from Poland, published on 13 Apr 2017.
Executive Summary
The Gmina Miasta Jaworzno, UrzAe has issued a Tender notice for the procurement of a Contract notice: Engineering works and construction works in the Poland. This Tender notice was published on 13 Apr 2017 and is scheduled to close on 30 May 2017, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 12434484, while the tender notice number is 138647-2017 and Register on the platform.
Key facts
Summary
Contract notice: Engineering works and construction works
Object of the contract Engineering works and construction works Description: Contract notice: Engineering works and construction works Authority Type: Regional or local authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45220000, 45221110, 45221113, 45222300, 45220000, 45221110, 45221113, 45222300, 45233162, 45233220, 45232451 CPV Description: Engineering works and construction works. Bridge construction work. Footbridge construction work. Engineering work for security installations. Cycle path construction work. Surface work for roads. Drainage and surface works. „Miejskie Centrum Integracji Transportu w Jaworznie: Integracja Drog dla Rowerow w Jaworznie w podziale na dwie części". Reference Number : BZ.271.1.8.2017 Część nr 1: ObiekEngineering department NUTS Code: PL22 Main Site: Jaworzno. Part 1: Engineering objects In the frame of the ordering the contractor will make a bridge in km 1 801.64 Velocity as a reinforced one-span arch structure with a hot ride, supported on perpendicular hooks. Supports as reinforced reinforced nipples with micropiles. The object is to use balustradesMade of stainless steel with hardened tempered glass. Balustrades are placed in the railings. The facility has two unidirectional cycles and pedestrian traffic. Width of the object 5.70 m, total length 39.00 m, vertical gauge under the object Al. J. Piłsudskiego 4, 50 m engineering object in km 2 338, 46 Velocity tunnel in perpendicular cross sectionWith: a band (0.25 m), pedestrian traffic (2.00 m), a bicycle trail (2.25 m), a dividing track (0.50 m), a bicycle trail (2.25 m) and Bands (0.45 m), total width 7.70 m. The width of the road is variable on the length of the object. The total length of the tunnel is 14.27 m, the length of the retaining wall in the piles axis is 53.35 m, the length of the wings at the inlet of the pile axes is 5.92 m.In the form of a frame with a monolithic ceiling based on steel sheet piles. Ceiling of concrete tunnel BE 45 reinforced with A-III N steel, 0.55 m thick, side walls are killed as steel piles. On perpendicular monolithic nodes, reinforced concrete supports afterLive directly. Handrails were attached to the top surface of the main beams, while on the comms they were attached to the retaining structure. The property has two lanes and 1 pedestrian lane. Cross-section on the viaduct: a beam with a ledge and balustrade (0.5 m), a pedestrian crossing (1.50 m), a cycling trail (2 x 1.50 m)A cyclone (0.20 m), a beam with a ledge and a balustrade (0.50 m) total width 5.70 m, a total length of 32.60 m. 1. The contractor is excluded from the procurement procedure for any of the circumstances. Referred to in art. 24 section 1 point 12-23 of the Public Procurement Law 2. At the request of the contracting authority to confirm the lack of grounds to exclude the contractor from progressThe contractor shall submit: a) information from the National Criminal Register within the scope specified in Art. 24 sec. 1, 13, 14, and 21 of the Public Procurement Law issued not earlier than 6 months prior to the deadline for submission of tenders; b) statement of the contractor that no final court order or final administrative decision has been issued against it.Social or health insurance footways or in the event of the issuance of such a judgment or decision of the documents confirming the payment of these duties together with any interest or fines or the conclusion of a binding agreement on the repayment of those debts, c) the statement of the contractor's failure to rule against him as a preventive measure To apply for an orderAnd the public. If the contractor has a registered office or a place of residence outside the territory of the Republic of Poland and where the person concerned is domiciled outside the territory of the Republic of Poland for the purpose of submitting the documents referred to in para. 2 (a) the rules set out in i?1/2 7 and 8 of the Regulation of the Minister of Development of 26.7.2016 applyDocumentary documents which may be requested by the contracting authority from the contractor in the procurement proceedings (Journal of Laws of 2016, item 1126). The documents referred to in para. 2 point a) are submitted by all contractors jointly applying for the award of the contract and the entities, on the capacity of the contracting entity The contracting authority does not set a condition in this regard. Contractor within 3 days of postingEnia on the website of the contracting authority, on which the announcement of the order and SIWZ (www.bip.jaworzno.pl), the information referred to in art. 86 sec. 5 of the Public Procurement Law will provide the contracting authority with a statement of affiliation or non-affiliation to the same capital group referred to in art. 24 sec. 1 point 23 of the PPL Act. With the statement, the contractor can provide evidenceY that links to another contractor do not lead to distortion of competition in the procurement procedure. In the case of performing artists, it is required to submit the above mentioned document to all entities. With the offer the contractor is obliged to submit a Single European Document of Contract (JEDZ). In the case of joint application for orders by contractors, SingleThe document is submitted by each of the contractors who are jointly applying for the order. This document confirms the fulfillment of the conditions for participation in the procedure and no grounds for exclusion to the extent in which each of the contractors demonstrates meeting the conditions for participation in the procedure and no grounds for exclusion. The contractor, who relies on the abilities or situation of other entities, to demonstrate lack of existenceThe basis for the exclusion and fulfillment of the conditions of participation in the proceedings, as well as the conditions of their participation in the proceedings, shall also be submitted by the Single Document concerning those entities. Where the contractor relies on the capacity or the circumstances of other entities, the contracting authority shall submit, together with the offer, those undertakings' obligations to render the contractor at the disposal of the necessary resourcesOw for order fulfillment 6. If the contractor is acting by a proxy, he must submit with the offer the appropriate power of attorney to represent him in the procurement procedure. The run of this deadline starts with the deadline for submission of tenders. Proceedings are probaTendered in the open tender mode. Framework contract, dynamic purchasing system, electronic auction, order from art. 67 sec. 1 point 6 of the PPL, Art. 36a sec. 2 PPL Act, variant offers are not applicable .. 9. The contracting authority envisages the possibility of applying the procedure in Art. 24 aa PPL law. In this case the contracting authority will first evaluate the tenders and then examine whether the contractor, The offer was evaluated as the most advantageous, not subject to exclusion and meets the conditions for participation in the proceedings. Due to the limited number of characters that can be entered into the content of the notice, the remaining information is included in the Terms of Reference available with the announcement on the website of the contracting authority: www.bip.jaworzno.pl. Internet address (URL): www.jaworzno.pl Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Engineering works and construction works was 30 May 2017. Bidding is closed.
This tender has been issued by Gmina Miasta Jaworzno, UrzAe in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45220000 - Engineering works and construction works, 45221110 - Bridge construction work, 45221113 - Footbridge construction work, 45222300 - Engineering work for security installations, 45233162 - Cycle path construction work, 45233220 - Surface work for roads, 45232451 - Drainage and surface works.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 12434484. The purchaser document reference is 138647-2017.