The PA?STWOWE GOSPODARSTWO WODNE WODY POLSKIE has issued a Tender notice for the procurement of a Contract notice: Engineering services in the Poland. This Tender notice was published on 18 Sep 2019 and is scheduled to close on 30 Sep 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 36426971, while the tender notice number is 438830-2019 and Register on the platform.

Key facts

Summary
Contract notice: Engineering services
TOT Ref. No.
36426971
Document Ref. No.
438830-2019
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
18 Sep 2019
Bid deadline
30 Sep 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Engineering services
Description: Contract notice: Engineering services
Authority Type: Other
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 71300000, 71337000, 45453000, 71300000, 71337000, 45453000
CPV Description: Engineering services.
Corrosion engineering services.
Overhaul and refurbishment work.
Maintenance works on the Jeziorsko reservoir, lateral dam Siedllic reinforced concrete breakwater repair at km 0 000/0 621.5
Reference Number: ROZ / 73/2019
The subject of the order is carrying out maintenance works on the Jeziorsko water reservoir facilities, Siedllic side dam, gel repairbreakwater at km 0 000/0 621.5.
Main Site: Side dam Siedltkow water reservoir Jeziorsko, voivodeship Ł-DZKIE
1. Scope of work:
1) surface preparation:
- cleaning of concrete surfaces with high-pressure water jet - cleaning the breakwater structure with a 2x30 cm wide belt loading and transporting debris by cars to the investor's landfill at a distance of up to 3 km,
- mmechanical forging of concrete at repair sites with the thickness of up to 2 cm on horizontal and vertical surfaces of corroded and damaged concrete to reach a load-bearing substrate,
- mechanical forging of corroded reinforcement with diam. 12 mm on vertical and horizontal surfaces;
2) repair and protection of reinforced concrete surfaces:
- protection of reinforcements and steel elements against mineral corrosion by means ofapplying two anti-corrosion coatings in the form of polymer-cement sludge with a brush,
- protective coatings on concrete surfaces - one-time graft layer in the form of polymer-cement sludge with a brush,
- manual reprofiling (filling defects) of the vertical and horizontal breakwater construction coarse-grained repair mortar - sulfate resistantup to 25 mm thick, applied with a steel trowel and one float, one layer with sharp troweling,
- mechanical reprofiling (filling of defects) of concrete structure surfaces by spraying with coarse-grained mortar - sulfate resistant up to 6 mm thick applied with a spray pump, one layer with smooth seizing,
- protective coatings on concrete surfacesch - application of the first layer of flexible insulation sludge with a hard brush - cross painting,
- protective coatings on concrete surfaces - application of the second layer of flexible insulation sludge with a hard brush - cross painting.
2. Additional information:
a) All work should be carried out in accordance with the enclosed technical specification of execution andacceptance of construction works and applicable health and safety standards and regulations. The construction waste generated during the execution of works should be handed over to authorized economic entities.
B) The Employer allows the use of other materials than those specified in STWiOR, provided that parameters not worse than those specified in these documents are provided. In the case of using other materials than those adopted in docdesign fragmentation, the Contractor is obliged to submit relevant documents confirming these materials at the stage of submitting the tender. In the event that the use of these materials will require a change in the design documentation, the costs of redesign will be borne by the Contractor.
C) The Employer requires that all persons employed in the positions of the worker takingparticipation in the implementation of the contract, were employed under a contract of employment throughout the duration of the contract. The number of workers involved in the contract is to ensure the timely completion of the contract. The above requirement applies to employees who carry out activities indicated in the bill of quantities, which are to be implemented by workers.
D) It is recommended that before submittingferty The Contractor made a site visit and familiarized himself with the terms of the task. The Contractor who fails to carry out the local vision bears all the risks associated with the task.
A detailed description of the subject of the contract can be found in the Terms of Reference and its attachments.
Information of the bank or cooperative savings and credit union confirming the amount of financial resources orthe Contractor's creditworthiness, issued not earlier than 1 month before the deadline for submitting bids or submitting requests to participate in the contract award procedure. No. 1 to the ToR, made, under pain of nullity, inelectronic form and bearing a qualified electronic signature,
- single European order document [EAT], i.e. a current statement as at the date of submission of tenders to the extent indicated by the Employer in the contract notice or in the Specification of Essential Terms of Order. The information contained in the statement constitutes a preliminary confirmation that the Contractor is not subject to exclusion andz meets the conditions for participation in the proceedings. EAT is prepared, under pain of nullity, in electronic form with a qualified electronic signature, and sent together with the offer by means of electronic communication in accordance with point 17 of the ToR,
- the Contractor, who relies on the resources of other entities to confirm compliance with the conditions for participation in the procedure, submits with the offer fromobligation of a third party (in electronic form with a qualified electronic signature of a third party),
- detailed cost estimate prepared under pain of nullity, in the form of an electronic document with a qualified electronic signature, taking into account the requirements of point 22 of the Terms of Reference,
- powers of attorney - should be made in the form electronic and dressinga qualified electronic signature by persons authorized to represent the company, in accordance with the registration act or a copy certified by a notary public using an electronic signature,
- Contractors jointly applying for the award of the contract, attach a statement in which they appoint a representative to represent them in the contract award procedure or representation inproceedings and conclusion of the public procurement contract. This declaration (power of attorney) should be made in accordance with section 11 of the ToR,
- the bid security must be lodged in accordance with point 14 of the ToR.
Self-submitted by the Contractor within 3 days of placing information by the Employer from the opening of tenders:
- the Contractor alone (without request ) within 3 days of being postede of the Awarding Entity's website, referred to in point 20.4.1 of the ToR, shall provide the Awarding Entity with a declaration of belonging or not belonging to the same capital group as referred to in art. 24 paragraph 1 point 23 of the PPL Act. Along with submitting the declaration, the Contractor may provide evidence that links with another Contractor do not lead to a distortion of competition in thigh proceedingsordering. The Contractor submits a statement in electronic form with a qualified electronic signature via a miniPortal or via electronic mail, the address of which has been indicated in point 1.1 of the ToR.
Contractors who are subject to exclusion pursuant to art. 24 paragraph 1 and art. 24 paragraph 5 of the Public Procurement Law
Detailed information onare in SIWZ.
Internet address (URL): http://www.wody.gov.pl

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Engineering services was 30 Sep 2019. Bidding is closed.

This tender has been issued by PA?STWOWE GOSPODARSTWO WODNE WODY POLSKIE in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 71300000 - Engineering services, 71337000 - Corrosion engineering services, 45453000 - Overhaul and refurbishment work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 36426971. The purchaser document reference is 438830-2019.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.