Object of the contractEngineering services
Description: Contract notice: Engineering services
Authority Type: Ministry or any other national or federal authority
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: GPA
Award criteria: The most economic tender
CPV code: 71300000, 71300000
CPV Description: Engineering services.
N02, 150001, EP F3, Gotthard Road Tunnel (1TG), Main / Interim Inspections 2020-2029
The Gotthard Road Tunnel (1980) is a 16.9 km long, a rough road tunnel on the National Road N02.
Main Site: Site-related services (such as inspections or meetings) take place on site in the Gotthard road tunnel during the period of suspension and at the customer's requestber (ASTRA, Zofingen Branch), ...
The Gotthard Road Tunnel (1980) is a 16.9 km long, one-road road tunnel on the national road N02.
In the context of the maintenance of the FEDA's KuBa / tunnels, the monitoring of the structures is of paramount importance to detect damage early on and assess the condition of the structure. These are periodically main and intermediate inspectorate, These include:
- targeted checks of the structural parts (visual),
- analysis and assessment of the current state of the structure / parts of the structure,
- Dokum. with photos, damage plans, sketches and assessments to track changes in the condition.
The contractor will support ASTRA's conservation planning through the construction inspection. In addition to the main task of Insp.the following tasks will be added:
- planning and coordination of HI / ZI,
- participation in coordination meetings,
- timely provision of results (presentation, summary), - revision of the reports according to ASTRA / BHU.
The following proofs of suitability / Confirmations must be complete, unchanged and without restrictions and reservations together with the offer documentsto be submitted, otherwise the offer can not be entered:
On EC 1: Technical capacity
For the provider: References on the support and supervision of 2 projects comparable with the planned task in the last 10 years.
Regarding EC 2: Percentage of benefits Subcontractor
For the provider: A maximum of 50% of the service may be provided by subcontractorsEK 3: Economic / financial capacity
For the provider: annual turnover provider double annual turnover of the order.
Regarding EC 4: Qualification of the key persons:
For the project manager (EK 4.1) and the head of inspection (EK 4.2): Reference in the same function or Stv. Function on the accompaniment and supervision of 1 project comparable with the intended task in the leProof to be submitted by the offeror:
1) Current excerpt from the commercial register;
2) Current excerpt from the debt collection register;
3) Current statement Compensation fund AHV / IV / EO / ALV;
4) Current Confirmation SUVA / ESTV;
5) Valid proof of insurance from the supplier or planning community with regard to professional liability insurance.
Partial offers are not eligibleConditions for non-WTO member countries: None. Terms and Conditions: as provided for in the contract. Negotiations: Reserved. Pure bidding rounds resp. Price negotiations are not carried out. In the context of renegotiations, offer adjustments or changes in performance may result in a corresponding price changeCircular sentences: The client awards public service contracts for services in Switzerland only to providers who guarantee compliance with health and safety regulations and working conditions for employees as well as equal pay for men and women.
Other information:
1) The commission (not compulsory) will take place on: Tuesday 4.6.2019, 20.30 Parking Vortex tunnel Goeschenen (see registration) with inspection of the tunnel driving area, the safety tunnel and a ventilation center during the tunnel blockage. Registration with enclosed registration form until wednesday 29.5.2019 to
[email protected]. Protective clothing (light jacket, helmet, good footwear) is mandatory;
2) The time of the beginning of the main works was afterset the current level of knowledge;
3) The preparation of the offers will not be refunded. The offer documents will not be returned;
4) The tender documents are issued exclusively in electronic form and are available in German only;
5) The composition of the board of appeal is determined ASTRA-internal;
6) Exclusion, preliminary reference: EBP Schweiz AG, as well as with these legally and / or personally related companies, are excluded from participating in the present proceedings. Also, the operator 1TG, the Office for Operation of National Roads (AfBN) of the canton of Uri is excluded from participation in the present proceedings;
7) INGE IG19 is working on the mandate "Structural Inspection (HI / ZI) in Gotthard Strassentunnel "from 2012 to and including 2019. This mandate will be concluded by the end of 2019. INGE IG19 or parts of it are admitted in the present proceedings;
8) Based on Art. 36 para. 2 lit. d VoeB and Art. XV, lit. D, GPA, the client reserves the right, according to the open procedure, to submit new similar orders, which refer to the present basic orderyield;
9) The documents to be submitted for a complete and valid offer and their structure are laid down in the document "Tender Documents for Planner Services" (according to the tender documents).
Remedies: In accordance with Art. 30 BoeB, a written complaint to the Federal Administrative Court may be lodged within 20 days of opening, PO Box, 9023 St. Gallbe raised. The complaint must be filed in duplicate and contain the request to include its reasoning with indication of the evidence and the signature of the complaining person or his representative. A copy of the present publication and available evidence must be enclosed. Final date / comments: There are 2 copies of the offer (the offer documents) in paperform and 2 in electronic form (USB stick). Submission by post: A-Post (date, postmark of a Swiss or state-recognized foreign post office, company franking not valid as a postmark). The provider or the provider must in any case to prove the timeliness of the tender submission. Missed offers will notmore consideration. In addition to the name of the project, the note "Do not open the tender documents" must be clearly marked on the envelope Personal fee: The fee is due no later than the closing date mentioned above during the opening hours of the box (08.00-2.00 and 13.00-17.00, Friday 16.30) A confirmation of receipt must be issued (address see 1.2)abe to a ...
Internet address (URL): https://www.simap.ch