Tender notice from Switzerland, published on 24 Oct 2018.
Executive Summary
The OFFICE FÉDÉRAL DES ROUTES — INFRASTRUCTURE ROUTIÈRE OUEST FILIALE ESTAVAYER-LE-LAC has issued a Tender notice for the procurement of a Contract notice: Engineering services in the Switzerland. This Tender notice was published on 24 Oct 2018 and is scheduled to close on 12 Dec 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 27918003, while the tender notice number is 469158-2018 and Register on the platform.
Object of the contract Engineering services Description: Contract notice: Engineering services Authority Type: Ministry or any other national or federal authority Contact Nature: Services Procedure: Open procedure Document: Contract notice Regulation: GPA Award criteria: The most economic tender CPV code: 71300000, 71332000, 71317000, 71300000, 71332000, 71317000 CPV Description: Engineering services. Geotechnical engineering services. Hazard protection and control consultancy services. 170022 - EP 4 Environmental management - Identification, study and monitoring of hazards and natural gravitational events (ID 5623) Swiss national roads are concerned by the problem of natural hazards. Among these dangers, those with a gravitational characterin some degrees, a threat to some of the network's trunks. They include avalanches, falling rocks, eboulements, debris flows and floods and landslides. Main Site: The place of performance of services is done on the site and the subsidiary F1 (territory of the UT II) from Ofrou to Estavayer-le-Lac (seances) Swiss national roads are concerned by the problemish of natural hazards. Among these dangers, those with a gravitational character are, in different degrees, a threat to certain sections of the network. They include avalanches, falling rocks, bursts, torrential and floodwaters and landslides. The services required include the identification of phenomena, the concept and monitoring ofthese, the hazard assessment, the proposal, the project and the monitoring of implementation of protective or remedial measures. They also include the monitoring of protective works, the archiving of documents, the storage of the main data in a database at the agent, the establishment of a hotline for 5 years are also part of this call for papers. ofQ1.1 Tenderer's reference A tenderer's reference to a project of comparable complexity in the same specialized area, already completed or substantially completed, indicating the period, the overall investment of the tenderer project, the services performed and the interlocutor (principal) authorized to provide information. Q1.2 Sub-traup to a maximum of 50% of the service may be provided by subcontracting. Q2 Economic and financial capacity of the tenderer Q2.1 Turnover The tenderer's annual turnover is equal to or greater than twice the amount Q2.2 Documents to be submitted Documents to be submitted with the bid of the bidder: - voluntary declaration of the bidder signed, - excerpt (s) from the commercial register for the tenderer and where applicable for each member of the association of partners. For companies having their headquarters abroad, similar certificate (s). These documents must be less than 3 months from the date of submission of the offer. Q2.3 Certifications to be submitted after the submission of the offer Certifications to be submitted after delivery of the offertender by the tenderer at the request of the contracting authority within a period of 7 days: - certificate of the bankruptcy office stating that the company is not in liquidation, - extract from the register of prosecutions (more recent than 3 months by relative to the time of submission of the offer), - justifications of the current payments for AVS / AI / APG / AC as well as SUVA and AFC, - justifications of the paymentsfor the LPP, - professional liability insurance (s) for damage and coverage amounts as specified in the draft contract. Q3 Key personnel skills and availability Q3.1 Managers' reference ( key-person) A reference in an equivalent function for a project of comparable complexity, already realized or largely realized, indicating the function, the period, the amount of the tenderer's fees and the overall cost of the project, the phases carried out, the services performed and the principal's contact person authorized to provide information. Q3.2 Availability Evidence that the availability of the project responsible and his deputy for the mandate of this tender is greater than or equal to the minimum availability exized by the contracting authority during the 2 1 years of the mandate. Enumeration and detailed description of the time constraints imposed by their other projects or activities. Q3.3 Language requirements The person in charge and his / her deputy must have at least the level of mastery of the following French: - manager: C1, - assistant: B2. The levels mentioned above are part of the common European framework ofe reference for languages edited by the Council of Europe. The tenderer must complete the tables of the tender documents and attach to the CV any certificate of the required level or equivalent or provide sufficient explanations to justify the achieved levels. Partial offers are not allowed. Conditions for countries that have not acceded to the WTO Agreements: None. ConditGeneral conditions: according to the draft contract provided for. Negotiations: are reserved. Conditions governing the procedure: the contracting authority awards public contracts for services in Switzerland only to contractors who guarantee compliance with the provisions on the protection of workers, working conditions and equal pay for men and women. Other indications: 1) Award Criteria Bidders are requested to use the bid document delivered with the bid documents to order the evidence. List of Award Criteria (according to the Public Procurement Manual): C1 Competence and Key References C1.1 Person in Charge [20%] Evidence for this criterion: - references of the person to a similar function (as manager or deputy) for a project of comparable complexity, - CV of the key-person (diplomas, certificates, reference projects, completed phases, career path), - language requirements table. Elements of judgment : - basic and continuing training, member of expert committees related to the areas concerned by the project, - experience: number of years of experienceexperience in the areas concerned by the project, adequacy of reference projects related to the market, functions performed in reference projects. Quality of the services provided in the reference projects, - mastery of the French language. C1.2 Assistant to the person in charge [15%] Evidence for this criterion: - references of the person in a similar function (as a responsable or deputy) for a project of comparable complexity, - CV of the key person (diplomas, certificates, reference projects, completed phases, professional career), - table language requirements. Elements of judgment: - basic and continuing training, member of expert committees related to the areas concerned by the project, - experience: number of years of experience inin the areas concerned by the project, adequacy of reference projects in relation to the market, functions performed in reference projects. Quality of the services provided in the reference projects, - mastery of the French language. C2 PRICE [25%] Evidence for this criterion: - amount of the financial offer Elements of judgment: the price considered for the evaluation is the amountof the offer with discount, without discount and without VAT, after control by the representative of the MO and correction of arithmetic errors. The price evaluation is carried out according to the following method: the maximum score (5) is attributed to the lowest price bid. Bids, which are priced 100% or more above the lowest offer, are marked 0. In betweenlinear and takes into account the hundredths. C3 Specific competences and references of the tenderer [20%] Evidence for this criterion: - organization chart of the project team, - explanation of the tenderer's particular skills and references, - quality management within the project. Elements of judgment: organizational chart: - organization of the project team. References: --Tenderer experience (number, importance and complexity of projects) Quality management: - performance and efficiency of processes, tools and methodology for quality management C4 Analysis of tasks and proposal for a procedure, concept quality management, risk analysis [20%] Evidence for this criterion: - analysis of tasks, - proposal for a procedure, - organization of the project, - risk analysis. Elements of judgment: Analysis of tasks: - identification of the framework conditions related to the project, - identification of the main and specific tasks related to the mandate put in submission. Proposals of procedure to follow: - ... Internet address (URL): https://www.simap.ch
The bid deadline for Contract notice: Engineering services was 12 Dec 2018. Bidding is closed.
This tender has been issued by OFFICE FÉDÉRAL DES ROUTES — INFRASTRUCTURE ROUTIÈRE OUEST FILIALE ESTAVAYER-LE-LAC in Switzerland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 71300000 - Engineering services, 71332000 - Geotechnical engineering services, 71317000 - Hazard protection and control consultancy services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 27918003. The purchaser document reference is 469158-2018.
This tender falls under Construction and Real Estate in Switzerland. Suppliers in these sectors can track similar Switzerland tenders using CPV-based alerts.