Tender notice from Hungary, published on 26 Aug 2017.
Executive Summary
The ERZSÉBET A KÁRPÁT-MEDENCEI GYERMEKEKÉRT ALAPÍTVÁNY has issued a Tender notice for the procurement of a Contract notice: Engineering design services in the Hungary. This Tender notice was published on 26 Aug 2017 and is scheduled to close on 02 Oct 2017, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 15976398, while the tender notice number is 332443-2017 and Register on the platform.
Object of the contract Engineering design services Description: Contract notice: Engineering design services Authority Type: Other Contact Nature: Services Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 71320000, 71240000, 71248000, 71300000, 71320000, 71240000, 71248000, 71300000 CPV Description: Engineering design services. Architectural, engineering and planning services. Supervision of project and documentation. Engineering services. A Zankai Erzsebet-tabor es a Fonyodligeti Erzsebet-tabor megvalositasahoz szuekseges general tervezői, komplex beruhazas-lebonyolitoi es BREEAM tanacsadoi feladatok ellatasara. Tervezesi es mernoeki szerződes a Zankai Erzsebet-tabor es a Fonyodligeti ErzsebThe general designer of complex projects, complex bachelor-lebonyolites and BREEAM teaching tasks. Main Site: 8251 Zanka, Kuelteruelet hrsz. 030 / 15. Your design assignment: The Gift Provider is the owner of the 8251 Zanka, entitled Quotation Order 030/15, 017/5, 017/6 and 018/7, for children's taverns (905 811 m2): - Existing epitopes are bonEquipments: Storehouse 1 007 m2, workshop 657 m2, Modettin 567 m2, Boelcsőde 217 m2, Zala hall 1005 m2, Disco 510 m2, Garden pots and regi playgrounds 700 m2 - Maintenance of existing parts: Gas stove, 8) es Nyari (1-4) accommodation, Viztorony epueletek, 25 035 m2 - Existing renovation and expansion: Nyari (5-8) accommodation 9 700 m2, Co-operative one-line---3 278 m2,, Koezoessegi epuelet ("Siraly") 1 887 m2,, kitchen-room 7 083 m2, Konyhatechnologia, Porta 22 m2, Oeltoező 132 m2, Kazanhaz 409 m2, Opava brewery 1 400 m2, Egeszseghaz 1 272 m2, Szinhaz 3617 m2, Szolgalati ferőhely - 3 428 m2, with a parking lot, additional 60 000 m2, rebuilding the plot of land on the plot, develop on the plotStonework, kikoető and molo complete replenishment, water sports training station is also suitable for the at-litasa, the existing own wastewater treatment technologic and maintenance replenishment, Kresz park, as well as a control system, internal camera flight, reception system, radio system, terhangos on the campsite. : Forest reserves (1-5) 6 250 m2, Multifunctional organizing3, 715 sqm, Workshop, Store 2 351 sqm, Office space 2 332 sqm, Office space 800 sqm, Parking space for 10 000 sqm, Garden and park, water tower and connecting water system, technologic and maintenance renovation of the waterworks - Full geodesic geodesic, - Photographic documentary, - Installation of auxiliary equipment and plans for the installation of auxiliary equipment for the construction of the building and the execution of plans in accordance with the technical documents of the Koezbeszerzesi Documents Residential Plans. Planned maximums of 3500 hectares and 200 parking places. the planned 24 months of construction is constantly The above information Energy Design Design Energy Modeling of New Epochs The BREEAM system is designed to meet the requirements of the BREEAM system with the help of the specialists. - Risk analysis of the project at the beginning of the projectS legal and legal software - - The contractor is eligible to receive the technical documentation at the same time as the technical designee. - The professional review and application of the licensing and implementation plans. - Continuous and up-to-date check-ups, checkweighers. the 1st will bring the bejaras organ of the day - The planning and development of the information and management system of the technical and pensiest management system of the project. - The progress of the project, the continuity of the projects and the implementation of the project will be continuously monitored. all the same. Beruhazas-lebonyolitos es mernoek-The task is to do the job with a job at the end of the job. In the case of the latterT: There is no such thing as a promoter, a subcontractor or a candidate for a commercial transaction, Section 62 (1) (a) to (q), sub-paragraph (2) (a) (b) of the present law. Paragraphs 67 (1) - (2) and 321/2015. (X. 30.) Government Decree 1.(2) - (3) of Section 3 of the EC Treaty, you must first certify in the case of the one-off European Documentation Documentation that there is no exclusionary reason for this. (4) to (7) of Subsection (3) of Section 69 of the Law on Expropriation for the Exclusion of Expenses (X. 30.) Korm. Ordinances 8, 10 and 12 to 16 shall be trueYou are sorry that it does not fall within the scope of exclusionary reasons set forth in the justifications. According to Section 69 para. (11), the complainant states that the grounds for exclusion are not mentioned in the excluded provisions and that the economic operator has indicated them in the single European co-ordination document.The applicant shall be responsible for the capacity of the appropriate body of competent authority, in that case, the exclusionary reasons shall not necessarily involve the submission of the one-off European Bidding Documents in section A and B of Title II and Section III, information, properly enclosed and the excluded agentin the context of the subprojects which do not necessarily give the Applicant a legitimate expectation. (4) of - 67. The exclusion of the reasons for the lack of a pool of proofs is a matter of time. Article 64. - 321/2015. (X.30.) Korm. Decree of Section 2 (2) with regard to the following electronicPlease provide us with the terms and conditions: https://ec.europa.eu/growth/tools-databases/espd/filterlang=en As submitting statements must be dated to the filing deadline. Article 65 (1) (c) of the sub-decree of the Foundation on the basis of the design and merchandising services related to the epithetor in the case of non-resident operators established in the country of resident or in the country of residency, with a right or with an organizational or chambers of reference, in accordance with the provisions of the Kbt. Section 65 subsection (1) c) of the Act on Equal TreatmentAnd must be certified in advance by the European Commission. Provider accepts a simple statement from the distinguished businessman IV. Please contact the relevant branch office of the Hungarian Chamber of Commerce (MEK) in accordance with the design regulations of the respective district. Article 69 (11) m(Eg https://www.mek.hu). (4) - (7) of Section 69 of the Act on the Rights of the Applicant (s). Section 69 (11), the free verification of the relevant data or data is not in the form of the extract from the register, the certificate issued by the registry managing body or the registerN is a justification for the use of the document in the simple masonry. For all the relevant information, please contact our Customer Service. Article 67 (1) to (2) and Article 321/2015. (X. 30.) Korm. (1) (1) of the Decree of the Ministry of Foreign Affairs of the Republic of Hungary must first state in the application of the one-off European documentary evidence that thesatisfactory. The promoter of the one-eyed European Dealership Document with a preliminary acknowledgment accepts the simple statement from the distinguished economic operator in the context of a detailed information. (X.30.) Korm. Decree No. 2 (2) - (3), in the light of the following electronic eligibility: https://ec.europa.eu/growth/tools-databases/espd/filteR Lang = hu A Kbt. (4) to (7) of Subsection (4) of Section 69, the persons who have been referred to in this Subpart are to be proved by each of the following: P / 1. The timer is 321/2015. (X.30.) Korm. R. Article 19 (1) (a) shall be accompanied by all the relevant information on the day-to-day application of the day-to-day application, From a zuyen invasion, a question about the 24-month recurrence of a missed call, with no more explicit statement with the present caller, with the following content, attentively on the time when he or she started writing to the letter or when he started to work if these data were available: Penzforgalmi szamla szamla, - miota guides the penzforgalmi szamlat, - penzforWas the last 24 hours before the day before the day before the day, or 15 days before the day of the LXV. Toervens Section 2, subsection 25, line item. P / 2. The timer is 321/2015. (X.30.) Korm. 19 - (1) (c) must enclose a declaratory statement with the last one before the day before the day, with a seizure date(Including the design of a high-rise building and the co-ordinated building and planning of buildings, the design coordinator of the building, the work of the co-operative and the co-operative tasks of the monastery, as well as the altaryou will be informed of the fact that the time when you were on paper or when you started work when these data are available. The cashier will raise the attention of the 321/2015 when it comes to the certificate of fitness. (2) - (3) and (6) - (7) of the Ordinance of the Government of the Republic of Hungary (X.30.) Korm. Order No. 321/2015 (X.30.)(1) (a) of the Act on Equal Treatment may be complied with by the fact that the most basic of the test subjects is to fully comply with the particular experimental conditions, given that the aforementioned penzuyne-economical characteristics can be tested for a person . Section 19 para. (1) of Decree 321/2015 (X.30.)(S) may meet the requirements of the appropriate test procedures in accordance with paragraph (c) of this Article. The eligible personnel may meet the requirements of any applicable body or person. According to Section 65 (7). Article 65 (8) of the Constitution is based on the organization the data of which is provided by the provider on the occasion of the economic and penniesusefully justify it, cf. 6: 419th - the responsible person shall be responsible for the timeframe, the time-consumer shall complete his or her loss or defective execution in the event of an offense. (1) of Section 65 (1) of the Civil Code. Article 57 (2) of the Basic Law on the Provision of Timeframes that the co-procurement documents are given timely legalAn idle, or the sub-idiosyncine named in the term, must electronically abandon it. In the case of a given web site, the contents of the contract documents are described in detail by the registration of a registration file, in which the economic operator in question is tested for the contact archive2) The notice must contain a statement of the Kbt. Section 66 (5) and (6) not including the content and the Kbt. (2) and (4) of Section 66. The enclosed documents contain the complete notes in the case file. 3) In the case of all forms of retrospective methodology: The exact number of adhato points also has an upper limit of 0-10 points. 1. One-eyed net offer ar: translate gold. 2. Auxiliary housekeeper: 1.1-1.4. In the view of a qualitative aspect, straightforward articulation. The details of the relevant explanatory notes and the documents accompanying the scheduling of the times are contained in Experiment I. Proof of the Koezbeszerzesi Dokumentumok. Tanusitvanyok: Absolutely astute. 4) The time is right(5) The tenderer is responsible for the fact that he is responsible for the planning and merck review of the project III.1.1). III.1.3) The contractor's representative is obliged to provide the full- M / second Point where relevans is related to rogziti that is hungarian-In the case of the chamber of commerce, both the Hungarian and non-Hungarian economic operators, as well as the specialists involved in the underdevelopment of the subordinate profession, are the author of the author's motto. The claim to the register or the omission of the tenderer's copy of the contract will be deemed to be pale. (4) of Section 131 of the ConstitutionThe second most favorable offer will be given by the Adjuster to the contractor. A contractor wins a period of time during the entire term of the contract, to enforce the rights holders and to ensure the actor in the register. The person who has to accept the terms must give a statement on the offer. 6) The winner is the most timely tester of the date of the contractto extend or extend the liability of a contractor or an existing liability insurer to an expiration date in accordance with the provisions of the Koezbeszerzesi Dokumentum. (5) to (6) of Section 53 of the Constitution. If a timeshare man decides to make a fortune, he canAnd the cover is not available to you, so in the case of the authoritarian power, all the details of the up-to-date Kuratoriumanak doentese and the coverage are available. Hatalybalepes can also be repeated in stages with respect to specific tasks. 8) The timeline should include a variable entry in the case file(9) FAKSZ: dr. And dr., And also the certificate of the cegbirosag altal, if such a jury is not in progress. Pieter Peter (00064). 10) To be completed by the Pty. (2) (e) of Section 75. 11) The period of time provided to you for a period of time, the cause of which is in the case of Res. 1Million HUF, while in the 2nd Look 5 Million Ft. To indicate the Time Deposit Provider, please complete the following number of sessions: 10300002-10668919-49020061. 12) Placebreakers: 09.06. 10:00 am, Fonyodliget; 9:07. 10:00 am Internet address (URL): http://www.erzsebetalapitvany.hu/ Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Engineering design services was 02 Oct 2017. Bidding is closed.
This tender has been issued by ERZSÉBET A KÁRPÁT-MEDENCEI GYERMEKEKÉRT ALAPÍTVÁNY in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 71320000 - Engineering design services, 71240000 - Architectural, engineering and planning services, 71248000 - Supervision of project and documentation, 71300000 - Engineering services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 15976398. The purchaser document reference is 332443-2017.