This tender has closedBids were accepted until 05 Nov 2018 (2929 days ago). New bids can no longer be submitted. The details below are kept for reference.
Tender notice from Hungary, published on 28 Sep 2018.
Exeutive Summary
The NIF NEMZETI INFRASTRUKTÚRA FEJLESZT? ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG has issued a Tender notice for the procurement of a Contract notice: Engineering design services in the Hungary. This Tender notice was published on 28 Sep 2018 and is scheduled to close on 05 Nov 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 27192679, while the tender notice number is 422842-2018 and Register on the platform.
Object of the contract Engineering design services Description: Contract notice: Engineering design services Authority Type: Body governed by public law Contact Nature: Services Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 71320000, 71320000, 71320000 CPV Description: Engineering design services. Gyoengyoes western descent II. uetem pre-writer Reference Number: EKR000699622018 Gyoengyoes western descent II. I do not know how to do it. Main Site: Hungary, 1134 Budapest, Vaci ut 45th Atrium Park Irodahaz "B" Ep. Gyoengyoes nyugati elkeruelő II. I have been preparing for the following: - learning curriculum for I and II. in the middle of the night, as well as in the paths of the wealthy roads- issuing permits for issuing permits, issuing permits for issuing permits, obtaining permission for licensing and licensing of pools and coagents, - obtaining a concessionaire / service declarations, - export planning plans- Approval of the plans of the I and the four connected varos (Vachott Sandor, Szent Bertalan, Lajos Kossuth and Petőfi Sandor utc-k). Amounts: Approx. 1.6 km of long-distance trails - aerial run-off planing of the river, the Gyoengyoes western descent I. uetem and the 3rd. he headed down. The road section contains one set of coopera- tion points and one, with a joining head to form a knot. The trail crosses the Gyoengyoes Stream and the Tarjan Stream. Teak 2 bridged bridge should be designed, approx. 10 to 14 m in length The detailed description of the task is provided in the documentation of the time period PST code: K240.01.11, 12; 13, 15 A) Kizaro reasons: In this form, you may not be a time-consuming, underserved, and may not be eligible for a commercially available economic operator. Section 62 (3) (5) and Section 63 (3) of the Kbt. .) • The Kbt. Article 74 (1) In point b), the timekeeper must be excluded from the workout for that timea party, a party or a suitably accountable organization, who is either responsible for the exclusion of the former. Kizaro reasons justify its modesty: 1. Preliminary Verification Mod: For the Applicant, see Kbt. Section 67 (1) - (2) and Section 1 para. (1) of the Cr. it must be stated, in advance, that the excluded grounds for exclusion do not fall within the scope of the EEKDThe economic operator or the eligible economic operator is a member of the Section 4 (1). please confirm in advance the Kb. Section 62 para. (1) - (2) excluded (see - 4 (3) - (4) and 6 (1) - (2) of the Criminal Code as well). In the case of a timely event, all the time-watchers of each of them will hear the formatted. In Section 15 of the Cr.in the case of a suitably justified subcontractor or body, only the EEKD shall be subjected to a trial for the exclusionary reasons for the non-existence of the subcontractors, and in the case of subprojects which are not reasonably justified by the prospectus. Section 67 (4) is subject to a petition. Section 13 of the Cr.in the case of a previous case, the applicant is required to attach a copy of the registration note to the consignee (together with all the rescinders) and the electronic certificate. If there are no alternative records, please enclose a corresponding negative statement. 2. A veritable mode of time for fun: The aplease contact us. Section 69 (4) - (7) based on the identi fi cation of the justifications for exclusionary grounds in the 8th, 10th, 12th and 16th centuries. You must certify that you do not have the cause of the exclusionary reasons. The proofs can not be obtained if the application form is the Kbt. According to Section 69 para. (11), the consignee, who is not mentioned in the excluded provisions, -the exclusionary reasons are well-documented, and the economic operator has made these available in the EEKD. Section 12 (2): in this case, it is stated in the case that it should take into account the validity of the document submitted in the course of the selection procedure. * For the exclusionary reasons and the appropriate conditions, the commencement of the trial(may be used) as long as the contents of the certificate or data contained in the verdicts are valid. AK - Until the other proof - the data content of the light is recorded by the person in charge of the queue in question. Due to the constraint of my character, III.1.1) is continued in III.1.2) !!! AjanlaFor the full text of the Section 67 (1) - (2) and Section 1 para. (1) of the Cr. the EEKD has to prove in advance that it meets the applicable requirements. In the case of an EEKD certification, the awarding party accepts a simple statement from the distinguished economic operator in accordance with the suitability criteria for the appropriate test methods. Koezoes are all timersone of them is listening to the formatted. Provider of the form IV. you will not be able to provide us with detailed information. Section 69 (4) - (7) the idle timers of the base will test their suitability as follows: P / 1. In accordance with Section 19 para. (1) of the Criminal Code, (c) shall be accompanied by the last one preceding the call for applications, the closing date for the(the design of a national plan) is a simple statement about the arithmetic of a subordinate traffic conveyance, and it is easy to find out when the data provider is on a letter or when it began to be artificial if these data are available. Section (3) - The Kbt. Section 65 (6) is the appropriate basis for the experimental timethe archers of the kings are seized. The Kbt. Section 65 (7) - (8), (11), and Section 19 para. (7). Please refer to the documentation for more information on the modem. 1. Hianypotlas (hp), respectively. please contact us. 71. By the way, by the time he is with the Hianypotlass, the time-maker is no longer a farmer. enters the role of the participant, and this host. actorthe new hp will be added to the newer hp, then the exclusive (AK) exclusive will order one hp (see Section 71 (6)). a new host. coating is not possible. To submit your Documentation Documentation (AD): Article 39 para. (1) makes it available electronically on the EDF. 2.The date is published by the EDF Korm. Section 5 (2) base electronIt must be submitted in electronic form. The electronic file holder must have the complete time frame in electronic format (.tif, or.jpeg or .pdf) in one or more beautiful files. The timing should include a read-out that AT has in the form of electronic form provided by the EDF (see - 11 (1) of the EDF Guidelines). AsleepCONTRACT NOTICE Supplies SECTION I: CONTRACTING AUTHORITY I.1) NAME, ADDRESSES AND CONTACT POINT Section 66 (6) according to the information provided. 4. The Trustee reminds you that the Excerpts Plan for Appropriate Tasks, the quoted share (work and copyright) will not be less than 55% of the total net designers. If the design plan is in line with the contract(55%) does not differ from the total net designer and does not qualify as a significant number of times, which results in unreasonable delays.5 The customer (AT) has to break the net amount of time in the rehearsal it is important for the designer to make a statement on the basis of the draft contractor's SZF11 article atruhazasra (vbrain) copyright to your opponents as well. Useful information in the co-procurement documents. (III.1.3) The technical or technical aspects of the min. professional from M1. to be more strictly prescribed; M2.a shall be added to the names and addresses of the respective parties). Section 66 (2) and Section 134 (5)int. 8.Property liability insurance: min.15 million HUF / carnival price and min. 45 million HUF / year. 9. Documents submitted pursuant to - 47 para. (2) and the EDF Korm. r. According to - 10. A IV.2.6. The time period specified in Section B of the Kbt. Section 81 (11) based on 60 days. 11. The CA is based on the concession of the Dean of the Koezbeszerzesi (Ertesitő 2016/147, 21 December 2016) the quantitative aspect (ar), the translated articulation, 2.1 to 2.3. s. in the case of qualitative points, the straight-set golden method is used, in which points are divided by 0-10 test subjects. A 2.1 to 2.3. s. in the case of a qualitative point of view, 24 months is the maximal consideration that can be taken into consideration, and the maximal adhato 10 points are awarded. The author's argument is that he is the winnerthe buyer is obliged to do so. III.1.3) M / 2. - 266/2013. (VII.11.) Korm., With the following (or with the same) design right, and in the MMK's register of names with such a right: - M / 2.1. point - KE-K right - M / 2.2. point - HT rightholders - 297/2009. (XII.21.) Of the Hungarian Government, the following (or equivalent)), with a legitimate right of action, and the term of office of a specialist in science and technology, with such legitimacy: - M / 2.3. point - SZTV - 2.1. legacies 13.The absorption of the cloud by the roavidites due to the characterization in the EDF; in the Documentation. Due to the limitation of my character, please continue with VI.3) [Further Information] in VI.4.3 !!! Internet address (URL): http://www.nif.hu
The bid deadline for Contract notice: Engineering design services was 05 Nov 2018. Bidding is closed.
This tender has been issued by NIF NEMZETI INFRASTRUKTÚRA FEJLESZT? ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 71320000 - Engineering design services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 27192679. The purchaser document reference is 422842-2018.