Contract notice: Electrostatic air and gas Tender - 33134210
Tender notice from Poland, published on 21 May 2019.
Executive Summary
The PGE ENERGIA CIEP?A S.A. has issued a Tender notice for the procurement of a Contract notice: Electrostatic air and gas cleaners in the Poland. This Tender notice was published on 21 May 2019 and is scheduled to close on 17 Jun 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 33134210, while the tender notice number is 235935-2019 and Register on the platform.
Key facts
Summary
Contract notice: Electrostatic air and gas cleaners
Object of the contract Electrostatic air and gas cleaners Description: Contract notice: Electrostatic air and gas cleaners Authority Type: Utilities entity Contact Nature: Works Procedure: Negotiated procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 42514200, 42514200 CPV Description: Electrostatic air and gas cleaners. Modernization of the K-3 boiler electrostatic precipitator in Rybnik in order to adjust the dust emission to the requirements of BAT Reference Number: 1001211100 The subject of the order is the modernization of the K-3 electrostatic precipitator installed in PGE Energia Ciepła S.A. Branch in Rybniku. The aim of modernization is to adapt the electrostatic precipitator to the dust emission requirements resulting from the BAT conclusions, i.e.to obtain dust concentration in dust gas (parameters for dry gas, under contractual conditions for 6% O not more than 50 mg / Nm. Main Site: PGE Energia Ciepła SA Branch in Rybnik, 44-207 Rybnik, Podmiejska Street 1. The subject of the Order is the modernization of the K-3 electrostatic precipitator installed in PGE Energia Ciepła SA in Rybnik. The aim of the modernization is to adapt the electrostatic precipitator to the requirementsin dust emission resulting from BAT conclusions, ie obtaining dust concentration in dust gas (parameters for dry gas, under contractual conditions for 6% O) not more than 50 mg / Nm. The scope of the task includes the design, modernization, commissioning and commissioning of an electrostatic precipitator for use (in a turnkey formula). In order to improve the level of emissions on an electrostatic precipitator the contracting authority assumes that the work will be carried outin the following areas: - optimization of the exhaust velocity profile in flue gas ducts and electrostatic precipitator - mass flow equalization, - power system modernization, - modernization of the hopper seals, - modernization of the aggregate and flux cascade damper system, replacement of a set of collecting electrodes together with suspension beams and rigid bars, - exchange of manholestogether with fragments of the shell plating, - replacement of drive isolator seats, - sealing and partial replacement of the chamber cover, confusors and diffusers as well as inlet and outlet channels, in the exchange places insulation replacement, - cold and hot roof exchange with insulation, - sealing the chamber by welding overlays, - building electromagnetic stirrups on the funnelsIII zone (high temperature drop hinders ash retention). 2. The detailed description of the subject of the Order will be presented by the Ordering Party after the Contractors are admitted to participate in the Proceedings in the Functional and Functional Program, constituting an attachment to the initial SIWZ. 3. The orderer does not provide for the option right. 4. The Awarding Entity does not provide for the ordering referred to in art. 67paragraph. 1 point 6 or art. 134 sec. 6 point 3 of the Public Procurement Law - the Ordering Party does not set specific requirements to meet this condition. The Contracting Authority will consider that the Contractor meets the condition of participating in the Proceeding in the economic or financial situation, if the Contractor demonstrates that he has: a) liability insurance civilian in the scope of conducted activities related to the subject ofsay no less than 8, 000, 000.00 PLN (in words: eight million zlotys), b) funds or creditworthiness for an amount not lower than the equivalent of PLN 10, 000, 000.00 (say: ten million zlotys). 1.The ordering party entrusted ancillary shopping activities, including the preparation and conduct of the present proceedings by the Purchase Department of PGE Energia Ciepła SA. Branch No. 2 CUW in Krakow. 2. Communication between the Employer and Contractors, in particular submitting Applications and statements and documents, including the Initial EAT Declaration takes place only using electronic communication means, ie the shopping portal at: https: // pgeenergiaciepla .eb2b.com.pl The Contractor is obliged to register on the Shopping Portal, which will enableIt gives him the status of a user with a unique login and access password to the Procurement Platform. The registration is one-off and allows access to all open tender procedures conducted by the Employer. Using the Procurement Platform for Contractors is free. Contractors who can not be excluded on the basis of the procedure may participate in the proceedings.not art. 24 sec. 1 point 12-23 of the PPL Act, subject to art. 133 ust. 4 of the PZP Act, and are not subject to exclusion pursuant to art. 24 sec. 5 points 1-2 and 8 of the PPL Act. The exclusion takes place in the cases specified in art. 24 sec. 7 of the Pzp. Contractor who is subject to exclusion pursuant to art. 24 sec. 1 point 13 and 14 and 16-20 or paragraph 5 points 1-2 and 8 of the PPL Act, may submit with the application dowody that the measures taken by him are sufficient to demonstrate its reliability, in accordance with art. 24 sec. 8 Public Procurement Law 4. In order to confirm the absence of grounds for exclusion referred to above, the Employer pursuant to art. 26 par. 2f of the Public Procurement Law, requests from the Contractors to submit together with the Application the following declarations and documents (subject to clause 4.8) indicated in the Regulation. Minister Roa coil on the types of documents that can be requested by the contracting authority from contractors in the proceedings for the award of the contract (Journal of Laws 27.7.2016 item 1126): 4.1. indicated in par. 5 points 1, 4.2. indicated in par. 5 point 2, 4.3. indicated in par. 5 point 3, 4.4. indicated in par. 5 points 4, 4.5. indicated in par. 5 points 5, 4.6. indicated in par. 5 points 6, 4.7. indicated in par. 5 points 9, 4.8. indicated in par. 5 points10 in accordance with art. 24 sec. 11 of the Public Procurement Law (submission within 3 days from the date of notification by the Employer of the results of the assessment of compliance with conditions for participation in the proceedings). A detailed list of statements and documents submitted to demonstrate the absence of grounds for exclusion is specified in item 17 of the Requirements for Contractors. . Contractor who refers to the resources of other entities, into prove the absence of grounds for exclusion against them, submit together with the application documents and statements referred to in point 4 points 4.1.-4.7 above. 6. With respect to Contractors having their registered office or place of residence outside the territory of the Republic of Poland and Contractors established in the territory of the Republic of Poland, in relation to persons domiciled inoutside the territory of the Republic of Poland, the required documents are specified in item 17.6. - 17.10 Requirements Information for Contractors. 7. Procedure of the Application for admission to participate in the proceedings is Annex No. 1 to the Information and Requirements for Contractors. Applications must be submitted in the original, in Polish, drawn up under pain of nullity in electronic form and bearing a qualified signaturektronicznego, through the Purchase Portal. Required attachments to the Application are indicated in item 20.5. Information and Requirements for Contractors. 8. The Contracting Party does not provide for the application of the procedure provided for in art. 24aa of the Public Procurement Law 9.The deadline for being bound by the Final Offer shall be indicated in the final SETC. 10. Information regarding the protection of personal data is included in item 31.3 of the Information and Requirementsfor Contractors. Internet address (URL): https://www.pgeenergiaciepla.pl/
The bid deadline for Contract notice: Electrostatic air and gas cleaners was 17 Jun 2019. Bidding is closed.
This tender has been issued by PGE ENERGIA CIEP?A S.A. in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 42514200 - Electrostatic air and gas cleaners.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 33134210. The purchaser document reference is 235935-2019.