Expired Tender Poland ICB TOT Ref. 21689640

Contract notice: Electromagnetic geophysical Tender - 21689640

Tender notice from Poland, published on 20 Mar 2018.

Executive Summary

The POLITECHNIKA WROC?AWSKA has issued a Tender notice for the procurement of a Contract notice: Electromagnetic geophysical instruments in the Poland. This Tender notice was published on 20 Mar 2018 and is scheduled to close on 27 Apr 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 21689640, while the tender notice number is 121078-2018 and Register on the platform.

Key facts

Summary
Contract notice: Electromagnetic geophysical instruments
TOT Ref. No.
21689640
Document Ref. No.
121078-2018
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
20 Mar 2018
Bid deadline
27 Apr 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Electromagnetic geophysical instruments
Description: Contract notice: Electromagnetic geophysical instruments
Authority Type: Other
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 38230000, 38230000
CPV Description: Electromagnetic geophysical instruments.
ZP / BZP / 027/2018 - Delivery of equipment for the earth science and mineral engineering laboratory within the framework of the "GEO-3EM Energia Ekologia Edukacja" project (magnetic separator)
Reference Number: ZP / BZP / 027/2018
1. The subject of the order is the delivery of the equipment of the earth science and mineral engineering laboratory within the framework of the project "GEO-3EM Energia ComplexEcology Education "(magnetic separator):
Main Site: GEO-3EM building, Na Grobli 13 street, Wrocław.
1 The subject of the order is the delivery of laboratory equipment for Earth sciences and mineral engineering as part of the project" Complex GEO-3EM Energy Ecology Education "(magnetic separator):
1.1. Magnetic Separator
The subject of the orders includes: delivery, assembly, installation, commissioning and instructionsie (as a presentation of the way of use) and checking the correctness of operation at the place designated by the Employer. CPV code: 38230000-6 Electromagnetic geophysical instruments
Detailed description of the order is in Appendix No. 3 to the ToR - OPZ. the order is in the model contract, constituting Annex 2 of the ToR.
2. ABOUTThe offer must be unambiguous and comprehensive, i.e. cover the whole assortment of the order (all equipment) along with the necessary elements of the equipment infrastructure. The subject of the order must be complete with all components, parts and materials necessary for commissioning and use, and must correspond to the content of the specification of essential terms of the order. Offered itemcation must meet the requirements of the orderer. The contractor at the stage of order completion, executes the subject of the order in accordance with the requirements of the orderer.
3. The Contractor is obliged to clearly specify the equipment / products / elements offered, characterizing them by means of an appropriate indication / confirmation (according to the specific requirement set by the ordering party), e.g.product, name, type, model, manufacturer's name, parameter - in accordance and respectively with Annex No. 3 to the ToR.
4. The delivered equipment must be brand new, non-core, free from legal and physical defects and will comply with the standards and applicable technical and operational requirements in force in Poland. Hardware and software provided to the customer and materials usedDuring the assembly works, they will come directly from the producer or from official distribution channels authorized by the producer and come from the legal and official producer's distribution channel.
5. The deadline for completing the order is: 5.11.2018, but not earlier than from 1.9.2018. The deadline depends on the completion of construction works. The ordering party will agree with the contractorthe final schedule of executing the subject of the order up to 15 calendar days counted from the date of signing the contract.
6. Details regarding the date and conditions of the subject matter of the order can be found in the contract template, which constitutes Annex 2 to the ToR. • Questions regarding the provisions of the ToR, how to place an offer and the order should be sent electronically: justyna.kulpa @pwr.edu.pl.
1. Contractors, who:
1) can not be excluded from the contract based on art. 24 sec. 1 point 12-23 and (additionally, the Contracting Authority foresees the exclusion of the Contractor) art. 24 sec. 5 points 1 and 8 uPzp, ie:
1.1. in relation to which the liquidation was opened, the court approved in the restructuring proceedings is expected to satisfy the creditorse with the liquidation of his property or the court ordered the liquidation of his property pursuant to art. 332 par. 1 of the Act of 15.5.2015. Restructuring law (Journal of Laws of 2015, item 978, 1259, 1513, 1830 and 1844) or whose bankruptcy was announced, with the exception of the Contractor who, after the bankruptcy, concluded a system approved by a legally binding decision court, if the agreement does not provide for the satisfaction of creditors prliquidation of the assets of the bankrupt, unless the court ordered the liquidation of his assets in accordance with art. 366 para. 1 of the Act of 28 February 2003 Bankruptcy Law (Journal of Laws of 2015, item 233, 978, 1166, 1259 and 1844),
1.2. who violated obligations regarding tax payments, fees or social security or health insurance premiums, which the Purchaser is able to demonstrate by means of appropriate evidencech, except in the case referred to in paragraph 1 point 15, unless the Contractor has paid the tax due, fees or social security or health insurance contributions with interest or fines or has entered into a binding agreement regarding the repayment of these receivables.
2) meet the conditions for participation in the proceedings regarding: - 2.1. competences or entitlements to conduct a specific activity zawoif it results from separate regulations. The orderer does not set a specific condition in this respect.
2.2. economic or financial situation. The ordering party does not set a specific condition in this respect.
2.3. technical or professional capacity. The Ordering Party does not set a specific condition in this respect.
2.3.2 dis. Persons dedicated to perform works constituting the subject oforder. The ordering party does not set a specific condition in this respect.
Cd conditions:
2. (if applicable) The Contractor may, in order to confirm compliance with the conditions referred to in point 1.2) sub-point 2.3. above, where appropriate and in relation to a specific contract, or part thereof, to rely on technical or professional capacity or a financial or economic situation inentities, irrespective of the legal nature of the legal relationship The Employer at the same time informs that the "appropriate situation" referred to above will occur only if the Contractor, which relies on the abilities or situation of other entities, proves to the Ordering Party that while implementing the order will have the necessary resources of these entities, in particularpresenting the commitment of these entities to provide it with the necessary resources for the order.
The Contracting Authority will assess whether the technical or professional capacity or their financial or economic situation made available to the Contractors by other entities, allow the contractor to demonstrate compliance with the conditions for participation in the procedure, if they do not deal with this subjectgrounds for exclusion, referred to in art. 24 sec. 1 item 13 22 and par. 5 points 1 and 8.
If the technical or professional capacity or economic or financial situation of the entity providing resources does not confirm the Contractor's compliance with the conditions for exclusion or the entities are subject to exclusion, the Employer shall request the Contractor within the time specified by Zamawiającego:
1. replaced this entity with another entity or entities or
2. committed to the personal implementation of the relevant part of the order, if it shows technical or professional capacity or financial or economic situation, referred to in point. 1.2), respectively, item 2.3 above.
List of documents:
1. To confirm compliance with the conditions of participation in the proceedings and the lack of grounds for exclusionlearning, Contractors must submit the following declarations and documents valid on the day of submitting offers:
1.1. Declaration in the form of a single European order document, hereinafter referred to as EED made in accordance with the standard standard form specified in the executive regulation of the European Commission and completed in the places indicated by the Ordering Party in the Annex-No. 4 to the ToR. The information contained in the EED is a preliminary confirmation that the Contractor is not subject to exclusion and meets the conditions for participation in the procedure.
1.2. In case of reliance on resources of other entities referred to in art. 22a uPzp the Employer in order to assess whether the Contractor, relying on the abilities or situation of other entities - will have the necessary resources to the extent possibleproper execution of the public order and assessment whether the relationship between the Contractor and these entities guarantees effective access to their resources, the Ordering Party requests documents (in particular by presenting the commitment of these entities to give him the necessary resources for the needs of the order), which specify in particular: the range of resources available to the Contractorthe subject, the manner of using the resources of another entity, by the Contractor, while performing the public order and the scope and period of participation of another entity in the performance of the public order.
1.3. Contractor who refers to the resources of other entities referred to in art. 22a uPzp in order to demonstrate the lack of grounds for exclusion and fulfillment to them in the extent to which they are pthe conditions for participation in the proceedings are set aside on their resources. It is submitted to EED regarding these entities
1.4. In the event of a joint application by the Contractors, the EAT shall be submitted by each of the Contractors applying for the order. These documents confirm compliance with the conditions for participation in the proceedings and no grounds for exclusion to the extent that each of the Contractors demonstrates fulfillment of the conditionso participation in the proceedings and no grounds for exclusion.
1. The contractor remains bound by the submitted offer for 60 days. The period of being bound by the offer starts as soon as the deadline for submission of tenders expires.
2. The offer must consist of:
2.1. documents and statements referred to in Chapter VI point 1 of the ToR (and accordingly in this announcement),
2.2. Contractor's tender form Annex No. 1-to SIWZ;
2.3. demonstrating the reservation of information constituting a trade secret in accordance with point 7 below (if applicable);
2.4. power of attorney in accordance with point 3 of this chapter (if applicable).
2.5. description of the offered item, the order of the technical specification of the offered equipment allowing to determine compliance with the requirements of the Employer presented in Annex No. 3 to-SIWZ, together with any Information for Contractors, completed and signed Annex No. 3 to the Terms of Reference OPZ.
3. Contractor within 3 days from the date of posting on the website information referred to in art. 86 par. 3 uPzp, will provide the Employer with a declaration of belonging or non-affiliation to the same capital group as referred to in art. 24 sec. 1 point 23 of the Public Procurement Law Along with depositsiem statement, the Contractor may provide evidence that the relationship with another Contractor does not lead to distortion of competition in the procurement procedure (in the case of a joint application for a contractor to be ordered by the Contractors), Each of the Contractors jointly applying for the order).
Internet address (URL): http://przetargi.pwr.edu.pl/
Directive: Classical Directive (2014/24/EU)

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Electromagnetic geophysical instruments was 27 Apr 2018. Bidding is closed.

This tender has been issued by POLITECHNIKA WROC?AWSKA in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 38230000 - Electromagnetic geophysical instruments.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 21689640. The purchaser document reference is 121078-2018.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Technology and Equipment in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.