Contract notice: Electricity Tender in Greece - 16390870
Tender notice from Greece, published on 11 Sep 2017.
Exeutive Summary
The ΑΝΏΝΥΜΗ ΕΤΑΙΡΕΊΑ ΔΙΑΧΕΊΡΙΣΗΣ ΑΝΑΝΕΏΣΙΜΩΝ ΠΗΓΏΝ ΕΝΈΡΓΕΙΑΣ ΜΕ ΔΙΑΚΡΙΤΙΚΌ ΤΊΤΛΟ ΔΕΗ ΑΝΑΝΕΏΣΙΜΕΣ ΑΕ has issued a Tender notice for the procurement of a Contract notice: Electricity in the Greece. This Tender notice was published on 11 Sep 2017 and is scheduled to close on 12 Oct 2017, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 16390870, while the tender notice number is 355067-2017 and Register on the platform.
Object of the contract Electricity Description: Contract notice: Electricity Authority Type: Utilities entity Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: Lowest price CPV code: 09310000, 45251160, 45233140, 09310000, 45251160, 45233140 CPV Description: Electricity Wind-power installation works Roadworks Study and construction of infrastructure works of 10 wind farms with a total capacity of 19, 80 MW in Marmari, Evia and the Aegean Islands Reference Number: 0061/17/5300 Study and construction of projects infrastructure of 10 wind farms with a total capacity of 19, 80 MW in the following locations: Marmari, Evia Power 5, 40 MW, Perniki Ikaria Power 0, 90 MW, Agios Ioannis Karpower station 0, 90 MW, Siggari of Lesvos Power 2, 70 MW, Lignos Vigos Power 0, 90 MW, Lakas Pythagorion of Samos Power 1, 80 MW, Chios Melanium Power 2, 70 MW, Profitis Ilias Psara Power 1, 80 MW, Potamia 0.90 MW Chios and Mykonos frying pan with a capacity of 1.80 MW, with a total indicative budget of EUR 5 230 000, excluding VAT or EUR 6 485 200, including VAT, currently at 24%. Main Site: Marmari, Evia, 1 The Wind Parks will be constructed on land, delimited on maps and topographical maps included in Issue 6 and considered by the Regulatory Authority for Energy (RAE). Areas are also specified on the RAE site. The locations of the 10 CAs, the rated power of the aircraft, as well as the assigned andof the CAs to be installed are detailed in Table 1, Issue 1 of the Declaration. 2 The Project's scope includes the following: 2.1 The design, design, construction, testing, commissioning, maintenance, until the approval of the temporary receipt protocol of each CA. 2.2 In particular, the provision of the required services for the issuance of thebuilding permits, designing, designing and constructing the required infrastructure projects, ie the electrical and civil engineering projects, as well as all the necessary auxiliary facilities. Civil engineering includes internal road construction (new or improvement of existing) access to CG A / C, improvement or even opening of external access road(where necessary), expressly excluding their authorization, the foundations and squares of the new A / C, the construction of a new or renovation of an existing control dwelling (if the control dwelling is deemed suitable for the new installation), the shaping of the environment space and environmental rehabilitation works, as well as all kinds of technical works (drains, wells, trenches, etc.). OnElectrical engineering projects include the internal electrical network of the wind turbines with the PPC Medium Voltage network up to the limit of the separation of responsibility between DEDDIE SA and electricity producer PPC Renewables SA, as defined in the Association Agreement of each CA. Also, the Project's scope includes the complete excavation, demolition / demolition of the foundations of the W-(AEKK), their management in an approved Alternative Management System (AEK) and the disposal of the steel reinforcement of the deconstructed foundations as non-hazardous solid waste by removing them from the existing Waste Management, Construction and Demolition Waste CAs. It is noted that, for reasons related to their technical ability-heavy vehicles for the transport and demolition of the foundations of the wind turbines, the pylons and fins of the existing WT will be disassembled and completely dismantled. It should be noted that the decommissioning of the pylons and fins of the existing WGs is not the subject of this declaration. 3 Each CA will be configured in such a way that it functions as a complete installation4 The Contractor shall be responsible for ensuring safe conditions for the transport of all equipment to the site of erection of each CA, with the improvement and / or construction of new access roads as well as for the specification and adaptation of specifications and studies of Documents 5 (Technical Specifications) and 6 (Designs-Studies-Licenses) on Special Requirementsspecifications of the equipment to be installed. The Contractor is solely responsible for the preparation and submission of the above required for approval as well as for their implementation during the execution stage of the project. Appropriateness for the exercise of professional activity. Certificate of MEEP or, in the case of foreign companies, corresponding professional registerof their country, for civil engineering (IT) and electrical engineering projects, as defined in paragraph 4.3.2.a) of the Document. Certificate of Certification of Students' Register or, in case of foreign scholars, the corresponding professional of their country registry for static studies of towers and foundations according to paragraph 4.3.2.b) of the Report. The average of the Circleof the Works of the Tenderer or, in the case of a Partnership, of at least one of the Companies that participate in it in the last three years, should not be less than 50% of the total Budget of the Project. Internet address (URL): http://www.ppcr.gr Directive: Classical Directive (2014/25/EU)
The bid deadline for Contract notice: Electricity was 12 Oct 2017. Bidding is closed.
This tender has been issued by ΑΝΏΝΥΜΗ ΕΤΑΙΡΕΊΑ ΔΙΑΧΕΊΡΙΣΗΣ ΑΝΑΝΕΏΣΙΜΩΝ ΠΗΓΏΝ ΕΝΈΡΓΕΙΑΣ ΜΕ ΔΙΑΚΡΙΤΙΚΌ ΤΊΤΛΟ ΔΕΗ ΑΝΑΝΕΏΣΙΜΕΣ ΑΕ in Greece.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 09310000 - Electricity, 45251160 - Wind-power installation works, 45233140 - Roadworks.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 16390870. The purchaser document reference is 355067-2017.
This tender falls under Power and Energy, Construction and Real Estate in Greece. Suppliers in these sectors can track similar Greece tenders using CPV-based alerts.