Contract notice: Electricity distribution Tender in Poland - 38147602
Tender notice from Poland, published on 20 Nov 2019.
Executive Summary
The POLITECHNIKA ?WI?TOKRZYSKA has issued a Tender notice for the procurement of a Contract notice: Electricity distribution and control apparatus in the Poland. This Tender notice was published on 20 Nov 2019 and is scheduled to close on 20 Dec 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 38147602, while the tender notice number is 546544-2019 and Register on the platform.
Key facts
Summary
Contract notice: Electricity distribution and control apparatus
Object of the contract Electricity distribution and control apparatus Description: Contract notice: Electricity distribution and control apparatus Authority Type: Other Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 31200000, 31731100, 31120000, 31121340, 45314310, 31200000, 31731100, 31120000, 31121340, 45314310 CPV Description: Electricity distribution and control apparatus. Modules. Generators. Wind farm. Installation of cable laying. Purchase and commissioning of the power grid on the campus of the Kielce University of Technology Reference Number: ATZ-381-67 / 19 Subject of order pn . "Purchase and commissioning of the power micro grid (hereinafter referred to as Ministry of Economy) on the campus of the University of Technologyętokrzyska "is the delivery, assembly, commissioning and commissioning of MG components, which mainly include: photovoltaic modules with photovoltaic installation, wind turbines, natural gas powered generator, lithium-ion energy storage, electric car charging stations, connections power between key nodes and dispatchplumbing (control center) together with automation and a system for collecting, monitoring and processing numerical data of energy production and distribution from micro network nodes, and then putting into operation of the newly created power microsystem infrastructure on the campus of the Kielce University of Technology. A detailed description of the subject of the contract is specified in Annex 1 to the ToR. Main Site:Kielce, POLAND, Kielce University of Technology 1. The subject of the order, entitled "Purchase and commissioning of the power micro network (hereinafter referred to as MG) on the campus of the Kielce University of Technology" is the delivery, assembly, commissioning and commissioning of MG components, which mainly include photovoltaic modules together with photovoltaic installations, turbines inpower source, natural gas powered generator, lithium-ion energy storage, electric car charging stations, power connections between key nodes and dispatch (control center) along with automation and a system for collecting, monitoring and processing numerical data of energy production and distribution from micro nodes, and then putting into service nof the resulting infrastructure of the power micro network on the campus of the Kielce University of Technology. A detailed description of the subject of the contract is specified in Annex 1 to the ToR. 2. As part of the subject of the contract, the Contractor shall provide, assemble, put into operation and put into service all the elements specified in the order, provide the expected guarantee and conduct appropriate training. 3. ZamawThe applicant requires a guarantee for the entire investment made, counted from the time of final acceptance, not less than 24 months, hereinafter referred to as the standard guarantee. Repairs and replacements that occur during the warranty period will be carried out free of charge. The response time to a service request cannot be longer than 3 days, but in the case of health and safety or fire hazard not longer than 24 hoursfrom the moment of notification. The repair time cannot be longer than 21 days. 4. The Employer requires conducting training on the proper operation and maintenance of the power grid for a minimum of 4 people, not shorter than 64 hours, at the Employer's premises. The Contractor provides the training and all materials necessary for the training at his own expense as part of the offerprices. The Awarding Entity requires the issue of a training document to each training participant. 5. The contractor is obliged to provide: - DTR for each element of the MG in Polish in paper and electronic versions, - the following as-built documentation in the field of automation: • topological diagram of the communication network for all controlled devices, generators and counters / switches with legible and consistent marking of communication cables at each device / communicator and in the documentation (connection from where to where, protocol, function, number of connection sockets, if any), • electrical topological diagram for all controllers with legible and consistent marking power cables on equipment and in the document(AC or DC, voltage value, max. current value, connection number), • schematic diagram of data flow in the communication network (logical diagram) including each local controller, each central controller, data server, central server and end devices ( protocol, type of data, if necessary), • map, for all devices working in the automation network, enabling physical location of these devices on campus, - the following as-built documentation in the field of server rooms: • wiring diagram of communication cables for each network device both at or on the device and in the documentation (connection socket numbers, where-to-where connection, protocol, function), • arrangement diagram of devices in server and distribution cabinetsh (where what is installed together with the function, you can use the numbers of mounting points), • wiring diagram of switchboards with legible and consistent with the documentation marking of each wire (number of the connection socket, connection: where, voltage value, max. current, AC or DC). Information from the bank or cooperative savings and credit unionamounting to the amount of financial resources or creditworthiness of the Contractor, within a period not earlier than 1 month before the deadline for submitting bids in the proceedings. List of declarations or documents confirming the lack of grounds for excluding the Contractor from participation in the proceedings: - information from the National Criminal Register in the scope specified in art. 24 paragraph 1 point 13, 14 and 21 of the Act, wysubmitted not earlier than 6 months before the deadline for submission of bids, - certificate of the competent head of the tax office confirming that the Contractor is not in arrears with tax payments, issued not earlier than 3 months before the deadline for submitting bids or other document confirming that the Contractor has concluded an agreement with the competent tax authority regarding these paymentstogether with any interest or fines, in particular, he obtained the exemption provided for by law, deferment or distribution in installments of overdue payments or withholding in full the implementation of the decision of the competent authority, that Wthe contractor is not in arrears with payment of social security or health insurance contributions, issued not earlier than 3 months before the deadline for submitting bids or other document confirming that the Contractor has entered into an agreement with the competent authority regarding the repayment of these receivables along with any interest or fines, in particular obtained legal exemption, deferment or unbundlingpayment in installments of overdue payments or withholding in full the execution of the decision of the competent authority, - an extract from the relevant register or from the central register and information on economic activity, if separate provisions require an entry in the register or the register, in order to confirm the absence of grounds for exclusion pursuant to art. 24 paragraph 5 item 1 of the Public Procurement Law, - the Contractor's declaration of no issuea final judgment of the court or a final administrative decision on arrears with the payment of taxes, fees or social security or health insurance contributions, or in the case of such a judgment or decision, documents confirming the payment of these claims together with any interest or fines or conclusion of a binding repayment agreement these claims, - the Contractor's statement on the lack of a judgment against him as a preventive measure of the prohibition to apply for public procurement, - the Contractor's statement of non-payment of local taxes and fees referred to in the Act of 12.1.1991 on local taxes and fees (i.e. Journal of Laws of 2019, item 1170), - the Contractor's statement on belonging or not belonging to thisthe capital group itself, referred to in art. 24 paragraph 1 point 23 of the Public Procurement Law (according to the model constituting Annex 6 to the ToR), and in the case of belonging to the same capital group, the Contractor may submit together with a declaration documents or information confirming that links with another Contractor do not lead to distortion of competition in the proceedings. The Contractor shall forward this declaration to the Employerwithin 3 days of placing by the Employer on the website the information referred to in art. 86 section 5 of the Public Procurement Law (information from the opening of offers). Internet address (URL): www.bip.tu.kielce.pl
The bid deadline for Contract notice: Electricity distribution and control apparatus was 20 Dec 2019. Bidding is closed.
This tender has been issued by POLITECHNIKA ?WI?TOKRZYSKA in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 31200000 - Electricity distribution and control apparatus, 31731100 - Modules, 31120000 - Generators, 31121340 - Wind farm, 45314310 - Installation of cable laying.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 38147602. The purchaser document reference is 546544-2019.
This tender falls under Defence and Security, Construction and Real Estate in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.