Contract notice: Electrical wiring and fitting Tender - 15694886
Tender notice from Switzerland, published on 16 Aug 2017.
Executive Summary
The OFFICE FÉDÉRAL DES ROUTES — INFRASTRUCTURE ROUTIÈRE OUEST FILIALE ESTAVAYER-LE-LAC has issued a Tender notice for the procurement of a Contract notice: Electrical wiring and fitting work in the Switzerland. This Tender notice was published on 16 Aug 2017 and is scheduled to close on 24 Oct 2017, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 15694886, while the tender notice number is 321154-2017 and Register on the platform.
Key facts
Summary
Contract notice: Electrical wiring and fitting work
Object of the contract Electrical wiring and fitting work Description: Contract notice: Electrical wiring and fitting work Authority Type: Ministry or any other national or federal authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: GPA Award criteria: The most economic tender CPV code: 45311000, 45310000, 34996000, 32415000, 45232300, 32344250, 45314300, 45311000, 45310000, 34996000, 32415000, 45232300, 32344250, 45314300 CPV Description: Electrical wiring and fitting work. Electrical installation work. Control, safety or signalling equipment for roads. Ethernet network. Construction and ancillary works for telephone and communication lines. Radio installations. Installation of cable infrastructure. N05.72 080011 — Upn.La Neuveville — Bienne-Ouest — DAO Lot 5.1 - Surveillance, systeme de gestion et communication (D5 et D6) (ID 4594) The present project deals with the anticipated measures at the UPONNS section N05 La Neuveville-Bienne for the renovation of the Ligerztunnel operating and safety equipment and the BSA installations of the SiSto safety gallery. NUTS Code: CH0 Main Site: N05 between La Neuveville and Twann, security gallery SiSto, subsidiary F1 of the OFROU in Estavayer-le-Lac (offices), offices and loc(UT IX), offices and premises of the DGT and DLT in Marin or Serrieres (meetings). This project deals with the anticipated measures at the UPnNS section N05 La Neuveville-Bienne for the renovation of equipment Operation and safety of the Ligerztunnel as well as the BSA installations of the SiSto safety gallery. The consistency of the work covered by this consultationOt 5.1 is shown in Exhibit 3, KBOB, it is summarized below: D5 - Surveillance installations, video installation (IVI) and various installation (DIV). D 6.1 - Communication networks D 6.2 - Management system D 6.3 - Radio installation. D 6.4 - Rescue telephones and telephone installation The following certificates / confirmations must be filedS at the same time as the tender dossier unless otherwise specified; Q1.1 Reference of the tenderer References of projects of comparable complexity in the following specialized fields: video installation - image analysis system (SAI), Management systems (section management and installation control, commands-The three specialized fields of video / SAI installation, development of management systems and installation of telephony must all be attested by a maximum of 3 references. The reference (s) must concern the construction of a road tunnel. It is specified that for management systems, the hardware (servers, industrial programmable logic controllers)T communication protocols (supervision software) must be derived from a standard solution of the market and not from specific project development. The company will have to justify with this architecture at least an equivalent experience in terms of the volumetry of data points (greater than 5000 data points for the management system and 1 000 data points for the CIs)For each reference, in addition to the description, it will indicate the dates, the amount of work, the name of the client and the specialized fields covered. For works carried out in a consortium, the company indicates the nature of the tasks carried out by it and the percentage share of its services, on all the works. The company indicates the reference works carried out inoutsourcing. This information must be inserted in the tender documentation. Q1.2 Subcontracting. 70% of the service may be provided by subcontracting. This criterion is to be stated in the tender document. Q2 Economic and financial capability Q2.1 Turnover Annual turnover is more than twice the annual amount of the contract.- Documents to be submitted together with the tenderer's offer: - Voluntary declaration of the tenderer (signed); - Extract (s) from the commercial register or, for companies having their seat abroad, Analogue (s) (less than 3 months from the time limit for submission of the tender). Q2.3 Certificates to be submitted after the tender has been submitted.The offer by the tenderer at the request of the principal within a period of 7 days: - extracts from the register of proceedings (more recent than 3 months compared to the time limit for the submission of the tender); - justifications for current payments for AVS / AI / APG / AC as well as SUVA and AFC; - justifications for current BVG payments; - professional liability insurance certificate (s)And the amounts of coverage as specified in the draft contract. Q3 Key figures. Q3.1 Key reference. A reference work of the key person (*) for a tunnel project Under exploitation, of comparable complexity, fully realized, indicating the period, the overall investment of the project, the executed works and the interlocutor (client) authorizes (*) As the person who will be responsible for the execution of the function of: - Project Manager: he / she is responsible for the overall execution of the contract on the contractual, technical and cost aspects, From the study phase to the overall reception phase. He is the sole interlocutor of the client and his representatives. It is responsible Q3.2 Availability Proof that the availability of the key person (s) (*) is greater than that of the user (s) Than the availability required for the duration of the project. Detailed description and description of the burden over time within the company and other projects. Conditions for countries not having acceded to the WTO agreements: None General conditions: According to the draft contract Conditions governing the procedure: The contracting authority awards public contracts for services in Switzerland only to tenderers Other indications: 1) Criteria for awarding contracts C1 PRICES [50%] Proofs for this criterion: - Price List, Descriptive Quote Judgment Items: The price considered for valuation is the amount of the offer with discounts, without discount and without TVA, after control by the OM proxy and correction of arithmetic errors. Prices are priced according to the following method: The maximum score (5) is allocated to the revised offer at the lowest price. Tenders with a price greater than 50% or more than the lowest offer score 0. Between two, the evaluation is linear and takes into account the centuries. C2 QuEvidence of the criterion: A technical memorandum covering all areas of the consultation dossier will be produced, including the following chapters: 1. The description of the technical solutions proposed for each area will be detailed: - The solution for video surveillance / image analysis system (SAI) / video recording, performance of- The software and hardware architecture of the management system (GS) and the management of the installations (response to the functional objectives), - The emergency telephony installations And service facilities and equipment to guarantee the level of operation of the structure during the works, - The installations(DIV), the DAO technical sheets listed in the tender dossier must be duly completed, as well as the model of equipment evaluation, provenance and the characteristics of the main supplies and equipment used for the performance of the services and Of the work, with precision of the references of the corresponding suppliers will be described. This chapter-Will incorporate a technical note outlining the performance benefits of the proposed equipment (performance, homogeneity and maintainability). 2. General methodology (material, human, process, control) This chapter will describe in particular: - Scheduling studies related to the completion of the work: synthesis plans, construction plans, technical specifications, execution note, Ote of calculations, layout plans, functional descriptions, consolidated list of inputs and outputs management systems, diagrams and architecture notes, interface, ... - The means and the organization of the studies of realization (DREA), - The means and organization for the coordination mission, the coordination of the planning and the management of the interfaces with the other batches, Execution of the work specifying in particular: - the preparatory work, - the procedures for the supply and storage of equipment / materials, - the place of installation. - The methodology of realization of the recipes factory, platform and site (from the prototypes to the final reception). 3. The GANTT general plan indicating notably (not exhaustive): - The period of preparation, - The duration of the studiesExecution by technical fields and by parts of works, - Delays in the supply of the main supplies, - Periods of control and acceptance tests distinctly identified by technical fields (detailed methodology), - Service verification period Regular (VSR). This schedule will be accompanied by a note specifying in particular the means by tasks and by phase(DREA, works, training, VSR, warranty, DOR), number of teams, cadences and consideration of migration principles, number of tunnel closures in preparatory phase, Work, and any other element to judge the reliability of this schedule. The following detailed schedules (type GANTT) will be provided: - Detailed planning etuof. - Detailed planning of management system (including factory receipts). - Planning works. Elements of judgment: 1. Adequacy of technical solutions: -Adequation of the technical solutions proposed for the execution of the market, - Quality of the equipments. 2. Methodology: - Method of execution of the execution studies (DREA) -Method of realization of the works: -Methods and tools implemented pFor the realization of factory / platform / site revenues. 3. Adequacy, security and optimization of planning. C3 Means to ensure the quality of the structure [10%]. Evidence for this criterion: An organizational memorandum will be produced, comprising the following chapters: 1. Description of the organization and coordination of the bidder for each stage of the project (studies, (Including GS and CI-CL management systems), follow-up of the warranty, training and DOR. The taking into account of the batches in interface will be described. This chapter will be illustrated by organizational charts by phase and a table will explain the distribution of the services between the members of the consortium and subcontractors.- The CVs and references of the key person and the main collaborators involved, on markets of comparable complexity and for comparable posts, - The assignment rates on the project of these persons will be specified . This chapter will explain how the experience and skills are adapted to the project.Ojet: maximum of 6 risks directly linked to the project. Elements of judgment: 1. Appropriateness and adequacy of the organization in terms of the constraints of the project, in particular of the project management team 2. Competences and experiences of the person: - Basic and continuing training in relation to the fields concerned By the project; - Experience: number of years of experience in the domainsInes related to the project, adequacy of draft references in relation to the market, functions performed in reference projects; - Mastery of the French language. 3. Relevance of the specific risks to the project and adequacy of the proposed measures to eliminate or reduce the risks. For all the proofs: - Quality and clarity of the documents. Evaluation of criteriaThe evaluation is always indicated by means of marks 0 to 5: 0 = Evaluation impossible; no information. 1 = Criterion very poorly filled; Insufficient and incomplete information. 2 = Incorrectly completed criterion; Information that is not sufficiently related to the project. 3 = Criterion filled normally, average; Average quality corresponding to the requirements of thePel offers. 4 = Criteria well filled, satisfactorily; good quality. 5 = Criteria very well filled in a very satisfactory manner; Excellent quality, a very important contribution to the achievement of the objective. Calculation of points: Sum of all scores multiplied by their weighting (maximum score possible: score 5 x 100 = 500 points) Decimals must be taken into account dIn the multiplication by the weighting of the criterion concerned. 2) Visit of the places. No site visits are planned. 3) Remuneration of tenders, return of documents. The preparation of tenders shall not be remunerated. The tender documents are not returned. 4) Awarding of the services The successful tenderer has no right to a full tendering of the services put out to tenderication. 5) Obtaining the documents from the file. The documents may be consulted exclusively on SIMAP (www.simap.ch) until the expiry of the time limit for submission of tenders (24.10.2017). 6) Reserve. The contract will be awarded subject to the maturity of the project and / or the availability of credits. 7) Handbook on Government Procurement, National Roads, FEDRO. The manual on public procurement, national roads, FEDRO-Is the basis for procurement procedures. The manual can be downloaded from: https://www.astra.admin.ch/astra/en/home/services/dokumente-nationalstrassen/modeles-for-the-projects-of-infrastructure/models-for-the- -Acquisitions-and-the-contrats.html. 8) Subsequent steps. Under s. 13 al 1 let h OMP and Art. XV d d AMP, the contracting authority reserves the right to award, In accordance with the procedure referred to in this Article, new markets related to this contract and similar to it. 9) Exclusion, pre-involvement. The persons or undertakings which have collaborated in the preparation of tender documents or the procedure in such a way that they are likely to influence the tendering procedure in their favor shall not be allowed to participate in the procedure and are excluded from it. Engineering officesEGIS Tunnels, 74373 Pringy and HBI Haerter AG, Zurich and the engineering offices of the AJS Group (AJS civil engineers SA), who are the authors of the invitation to tender, can not participate in the procedure. Remedies: In accordance with Art. 30 LMP, this publication may be challenged, within 20 days of its notification, to the Tribunal administratifIstratif federal, PO Box, 9023 St. Gallen. The memorandum of appeal, to be submitted in duplicate, shall state the conclusions, grounds and evidence and shall bear the signature of the appellant or its agent; A copy of the present publication and the documents invoked as evidence, when available, shall be attached to it. Closing time for the submission of tenders/ Remarks: Complete file on paper (2 copies) and numerical on 2 USB keys in a sealed envelope bearing the number / the official title of the project with the mention. In the case of postal mail (at least in letter A), the postal stamp or bar code of the Swiss Post Office or the officially recognized foreign post office determines whether the delivery deadline is met(Postage paid by companies is not considered a postal stamp). In case of hand-delivery, the tender must be lodged at the Lodge of the FEDRO, a subsidiary of Estavayer-le-Lac, within the above-mentioned time limit during opening hours : 8:00 - 12:00 and 13:30 - 17:00), against delivery of an acknowledgment of receipt (address in 1.2). Offers rFax or e-mail will not be taken into account. In all cases, the onus is on the tenderer to prove that he has submitted his tender within the time limit. Tenders submitted outside the time limit can not be taken into consideration and are sent back to their dispatcher without having been opened. Remarks (Delay wishes to ask questions in writing): Given the duration of this callThe contracting authority decided to carry out two phases of questions / answers under the following conditions. Questions should be anonymously submitted on the SIMAP forum (www.simap.ch) of the relevant submission. The first set of questions is to be filed until 6.9.2017 at 23:59. The responses will be given exclusively through this platform, To 15.9.2017. Questions asked after 6.9.2017 will be answered during the 2 rd of questions / answers. The 2 sets of questions must be filed until 29.9.2017. Replies will be given exclusively through this platform until 10.10.2017. The downloading of responses is the sole responsibility of the bidders. There will be noarning. Issues received outside the period will not be dealt with. National reference publication: SIMAP of 11.8.2017, doc. 978757. Delai wishes to ask questions in writing: 29.9.2019. File available from 11.8.2017 to 24.10.2017. Requirements for obtaining tender dossier: without indication. Internet address (URL): https://www.simap.ch Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Electrical wiring and fitting work was 24 Oct 2017. Bidding is closed.
This tender has been issued by OFFICE FÉDÉRAL DES ROUTES — INFRASTRUCTURE ROUTIÈRE OUEST FILIALE ESTAVAYER-LE-LAC in Switzerland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45311000 - Electrical wiring and fitting work, 45310000 - Electrical installation work, 34996000 - Control, safety or signalling equipment for roads, 32415000 - Ethernet network, 45232300 - Construction and ancillary works for telephone and communication lines, 32344250 - Radio installations, 45314300 - Installation of cable infrastructure.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 15694886. The purchaser document reference is 321154-2017.
This tender falls under Construction and Real Estate, Materials and Products, Computer Hardware and Software Services in Switzerland. Suppliers in these sectors can track similar Switzerland tenders using CPV-based alerts.