Object of the contractElectrical supplies and accessories
Description: Contract notice: Electrical supplies and accessories
Authority Type: Utilities entity
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Mixed
CPV code: 31680000, 31680000, 31680000
CPV Description: Electrical supplies and accessories.
Overhead line fittings II.
Reference Number: EKR001317512019
NKM Aramhalozati Ltd. is a supplier of small coexistence overhead line fittings for existing and future infrastructure of NKM Aramhalozati Ltd.
Main Site: 6728 Szeged, Napos ut Purchase of 9100 coexpressure overhead line tensioner assemblies.st, the amount contained in the Technical Specifications and Specifications of the Co-Procurement Documents and in the Technical Specifications and Related Attachments.
In all cases: shall not be eligible for certification as an economic operator against which Kbt. Article 62 (1) to (2)For any of the zaroous reasons. Article 74 para. (1) excludes AT, AV, and / or AT from the procedure. the organization certifying its suitability, which is subject to the authority of exclusion grounds; who is the subject of the exclusion reason in the course of the procedure.The economic operator receiving the certificate must be certified in advance by the Single European Co-Procurement Document (in the form of an EEKD - EKR form). Pursuant to Article 67 (4), the AT must declare that it does not subscribe to the Kbt. AV falling under the scope of exclusion grounds under - 62 (1) - (2) (ECR form and arrow)
Clear: AK calls attention to Kbt. 64.
AK a Kbt. Article 69 (4) to (6) basically calls for the AT to be considered the most favorable from a commercial point of view, with an appropriate time limit for fire, inviting the submission of non-substantiated exculpatory justifications.he / she can doent that not only the most favorable AT, but also the definite number of the next most favorable AT in the order of sales, should be called for the submission of the certificates.
are not maintained:
- Excluded reasons for AT established in Hungary, no. (X. 30.) Korm. - For non-Hungarians who are not established in Hungary, the reasons for their exclusion must be certified in accordance with Article 10 of the Act.
The verification method according to - 8 (i) (ib) and - 10 (g) (gb) of the Kr.- (1) (k) Please provide with content as described in sub-paragraph (k) (AT) (or declare the owner of the property in accordance with - 3 (38) (a) to (b) or (d) of TVLIII of 2017) (in the form of an ECR). With regard to the exculpatory justification, the provision of - 1 (7) of the Cr. Shall apply.and variation registration procedure (declaration of negative content is also required) (in the form of an ECR). In the event of an ongoing listing procedure, please attach to the AT trial offer an admission request submitted to the company and a certificate of its registration by the company. - 35 (2a); 41 / A. - (1), (3), (4), (5); 65. - (12); 69th(11a) and - 1 (8) of the Criminal Code
In all cases:
Prior approval by the EEKD - in accordance with Kbt. Article 67 (1) - (3), - 1 (1) and - 2 (5) of the Cr. the IVD is sufficient for IV.
Submission of the following documents is excludedg The relevant expressions of AK, Kbt. 69. -- (4) - (6) based on base:
P / 1. - 19 (1) of the Cr. (c) AT attaches a statement of net receipts for the supply of supplies (supplies and delivery of low voltage power lines) for the business year closed to the tenderer for the last 3 business days preceding the day of delivery, depending on when the AT came to the start and when the activity started, provided that this information is available.
P / 2. - 19 (1) of the Cr. (a) AT attaches a dated statement from all of the top-notch Penzuegyes of the day to the Provisional Contributor, stating this Contributor and expressly stated below, l Depending on the time when the Offeror drew up or down. when you started your activity, if these data are available:
- enter the traffic number,
- have there been queues for more than 15 days in the 12 months preceding the call.
- 2. The term defined in Article 2 (25) of the TV Act favors the time testedalso wants to attach the certificate to any suspense account that has been terminated in the interval, by accepting any certificate dated expired.
P / 3. - 19 (1) of the Cr. (b) AT attaches its own or its predecessor's account statement to the last 3 closed business days prior to the date of the quotation (subject to the establishment of the host entity)country law requires collusion). If the AK garden report is available on the ceginformation service website, the AK data will be verified by the AK, and the report available on this site is not required.
If AT is P / 3. is not in possession of the document for the entire period prescribed by AK, because after the beginning of the period, rgyabol is certified by a solemn declaration of intake. AK is required to establish the AT's pencil and economic capability if, at the time of purchase, the cost of supplying the co-op supplies (delivery of free-line equipment) is at or above 1.r: 20, 000, 000 Ft 2. r: 20, 000, 000 Ft. r: $ 6, 000, 000;
4.r: $ 7, 000, 000 5th: 4, 000, 000Ft 6r: $ 10, 000, 000, Round 7: $ 20, 000, 000, Round 8: $ 4, 000, 000, Round 9: $ 10, 000, 000, Round 10: $ 6, 000, 000, Lot 11: $ 50, 000, 000, Lot 12: $ 100, 000, Lot 13: $ 20, 000, 000, Lot 14: $ 2, 000, 000
AK calls attention to Section 1 ( 8) b., 19. - (3) of the Kbt. 65 (7) to (9), (11) to (12), 67 (3), 69 (11) to (11a)
In each case:
1) The offer is exclusiveelectronically via the EKR system (www.ekr.gov.hu) and crossed in! Please make sure that the electronic documents of the documents / declarations, ie all the declarations available in non-electronic forms, are scanned, in .pdf, excel, zip / rar file format.
2) The language of the procedure is Hungarian. If any doc. not seedI removed the product descriptions for the Yar language link, so I try to include it in the AT Hungarian translation as well.
3) In case of Koezoes suggestion, a consortium agreement of the Koezoes AT must be attached
4) Additional information can be obtained from Kbt. According to - 56.
5) AK does not provide a commission commissioner. - 74 (2), you may be excluded from the procedurean AT who does not need to provide a national banana, the AT who is offering a pedigree that does not require a national banana in the offer
7) The offer must include:
- Reading Form (ECR Form)
- Kbt. Section 66 (2) para. Declaration (EKR Form)
- Kbt. Section 66 (6) para. (a) and (b) (A statement with a negative content must be attached!) csimply underneath
- Kbt. Section 65 (7) para. arrow. (also with negative content) - like the docks not highlighted by Kbt. and the requirements of the KD
8) AK the Kbt. 71 of the Act provides the Hianypotlast and Kbt. Section 71 (6) para.
9) AK has 30 calendar days per 1 month written down in Section IV.2.6
10) Eligible according to III.1.2) and III.1.3)sagi conditions and their required verification in the official records of qualified ATs are subject to more stringent qualification criteria.
11) AK does not apply the Kbt. - 75 (2) (e).
12) Time of delivery: CET
13) If the AT, the sub-contractor, occasionally the recipient of the transaction is a participant in the Kbt instead of the certificate prescribed in the KD. Under Article 69 (11), If you want to verify data, you will be interested in declaring which breed of data you want to prove further this breed holds data. also available free of charge in the Hungarian language on the availability of all available electrical power.
14) Iranyado Laws: Kbt., 307/2015. (X.27.) Korm.r., 321/2015. (X.30.) Korm.r., 424/2017. (XII.19.) Korm.r., Ch.
15) FAX:
Name : Dhaka Vince
Registered: 01105
Mailing Address:6720 Szeged, Klauzal ter 9.
E-mail address:
[email protected] For more information and to have documentation please visit
Internet address (URL): https://www.nkmaram.hu