Object of the contractElectrical machinery, apparatus, equipment and consumables; lighting
Description: Contract notice: Electrical machinery, apparatus, equipment and consumables; lighting
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Negotiated procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 31000000, 31000000, 31121110, 31200000, 31321300, 45000000, 45315400, 45314310, 50532000, 50532400, 51110000, 51112000, 31000000, 31121110, 31200000, 31321300, 45000000, 45315400, 45314310, 50532000, 50532400, 51110000, 51112000, 31320000, 31321400, 31321500, 45314300
CPV Description: Electrical machinery, apparatus, equipment and consumables; lighting.
Power converters.
Electricity distribution and control apparatus.
High-voltage cable.
Construction work.
High voltage installation work.
Installation of cable laying.
Repair and maintenance services of electrical machinery, apparatus and associated equipment.
Repair and maintenance services of electrical distribution equipment.
Installation services of electrical equipment.
Installation services of electricity distribution and control equipment.
Power distribution cables.
Underwater cable.
Submarine cable.
Installation of cable infrastructure.
Greenlink Interconnector Project
Greenlink Interconnector Limited is developing a 500 MW HVDC interconnector system between the existing electricity grids in Ireland and Wales (UK). The interconnector will provide a new grid connection between Great Island transmission substation in County Wexford, Ireland and Pembroke transmission substation in South Wales. The Greenlink Interconnector cable route is approximately 205 km in length between the Pembroke Converter Station and the Great Island Converter Station of which 7 km is onshore in Wales, 170 km is subsea and 28 km is onshore in Ireland.
Main Site : Great Island, County Wexford, Ireland and Pembroke, Wales, United Kingdom
While Greenlink does not consider itself a "contracting entity" for the purposes of the EU Utilities Directive
(Directive 2014/25/EU) and any national implementing legislation, it is conducting this procurement voluntarily in accordance with the terms of the Directive 2014/25/EU to ensure an open, transparent and competitive tender process.
The scope of requirements of lot 1 within this contract notice are:
— the detailed design,
— engineering,
— procurement,
— manufacture,
— supply,
— transportation,
— installation,
— construction (including civil works),
— testing,
— commissioning,
— maintenance and supply and delivery of spares of:
(a) 2 x HVDC Converter Stations (1 in Great Island, County Wexford, Ireland and 1 in Pembroke, Wales, UK);
(b) All HVAC cables and accessories required to connect the HVDC converter stations to the grid connection equipment in Great Island, County Wexford, Ireland and Pembroke, Wales, UK (optional for Ireland and / or UK at the sole discretion of Greenlink Interconnector Limited);
(c) Grid connection equipment in grid connection substation in Great Island, County Wexford, Ireland and/or grid connection substation in Pembroke, Wales, UK (optional for Ireland and/or UK at the sole discretion of Greenlink Interconnector Limited);
(d) Spares (both strategic and operational spares) and
(e) Provision of maintenance services for a mandatory initial period after take over to align with the warranty period under the EPC contract (see II2.7 for current anticipated take over date) and supply and delivery of replenishment spares under a separate maintenance services agreement including options to extend at the sole discretion of Greenlink Interconnector Limited.
Further details of the scope of lot 1 are provided in the Pre-Qualification Questionnaire (PQQ) and Invitation to Negotiate (ITN) documents.
See Section VI.3 of this Contract Notice for more details about the procurement process.
Details will be described in the Pre-Qualification Questionnaire (PQQ).
Greenlink Interconnector Limited reserve the right to alter or amend the conditions described in the Pre-Qualification Questionnaire (PQQ).
Applicants wishing to participate should submit their company name, main contact name and main contact email address to Greenlink Procurement Manager at email address
[email protected]Applicants will then receive a "Non-Disclosure" Agreement ("NDA") and an "Expression of Interest" ("EOI") form for signature. The NDA and EOI should be submitted to the Greenlink Procurement Manager at email address
[email protected]The PQQ and subsequent ITN processes will be run using the ACONEX procurement software.
After the NDA and EOI forms have been submitted, the PQQ document will then be issued to each applicant including submission instructions and which will be available from 31.8.2018.
Following the evaluation of the PQQ submissions in accordance with the PQQ instructions up to five (5) candidates will be shortlisted for each lot in accordance with the selection criteria specified in PQQ document to proceed to the invitation to negotiate ("ITN") phase.
The ITN phase will be conducted in two (2) stages. At the end of Stage 1 ITN two (2) candidates will be shortlisted to proceed to Stage 2 ITN in accordance with the award criteria specified in the Stage 1 ITN document and Greenlink Interconnector Limited will confirm whether it will include the lot 3 option in the Stage 2 ITN process. At the end of Stage 2 ITN one (1) candidate will be appointed as the Preferred Bidder for lot 2 in accordance with the Stage 2 award criteria specified in the Stage 1 ITN. The award criteria specified in the Stage 1 ITN and Stage 2 ITN will be set on the basis of the most economically advantageous tender.
Greenlink Interconnector Limited reserve the right to alter or amend the conditions described in the Pre- Qualification Questionnaire (PQQ) and/or the Invitation to Negotiate (ITN) documents.
In the event that two separate contracts are awarded for lot 1 and lot 2 the Candidates to whom the contracts will be awarded may be required to enter into an Interface Agreement.
Greenlink Interconnector Limited will apply a non-mandatory "standstill" period of a minimum of 10 days from the day following the date of notification to participating tenderers of the award of contract or contracts.
Internet address (URL): www.greenlinkinterconnector.eu