The KOPALNIA SOLI „WIELICZKA” SPÓ?KA AKCYJNA has issued a Tender notice for the procurement of a Contract notice: Electrical machinery, apparatus, equipment and consumables; lighting in the Poland. This Tender notice was published on 20 Apr 2018 and is scheduled to close on 30 May 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 22630003, while the tender notice number is 171307-2018 and Register on the platform.

Key facts

Summary
Contract notice: Electrical machinery, apparatus, equipment and consumables; lighting
TOT Ref. No.
22630003
Document Ref. No.
171307-2018
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
20 Apr 2018
Bid deadline
30 May 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Electrical machinery, apparatus, equipment and consumables; lighting
Description: Contract notice: Electrical machinery, apparatus, equipment and consumables; lighting
Authority Type: Other
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 31000000, 31213100, 51100000, 51112000, 31000000, 31213100, 51100000, 51112000
CPV Description: Electrical machinery, apparatus, equipment and consumables; lighting.
Distribution boxes.
Installation services of electricity distribution and control equipment.
"Modernization of the 3kV SN switchgear" Kościuszko ""
Reference Number: KSW / 2018 / TEM / 57
1. The subject of the order is the performance of works involving the modernization of the 3 kV SN switchgear"Kościuszko"
Main Site: Wieliczka.
1 The contractor is obliged to carry out all the work necessary for the commissioning of the newly built 3 kV "Kosciuszko" MV switchgear.
2. As part of the ordering process, the Contractor is obliged in particular to:
1) Deliveries of 3 kV switching station and other devices, materials and cables,
2) Replacing the existing 3kV "Kościuszko" switching station, 3) Installation of collective signaling cabinets for SZA alarms,
4) Exchange of existing switching station for own needs on new switchgears with a guaranteed section, coupled with UPS industrial power supply and batteries,
5) Exchange in building switching station for electrical lighting, basic and emergency lighting, sockets and electrical installation of heating with radiators,
6)in the 3 kV switching station room,
7) Installation of a cable (fiber optic) line for the transmission of signals from the communication cabinet in the 3 kV "Kosciuszko" switching room through the junction box in the Kościuszko headquarters building to the 3 kV "Kinga" junction box,
8) Ground network installation,
9) Integration of the newly built 3 kV "Kościuszko" switching station and switchingie existing loads supplied from the 3 kV "Kościuszko" switchgear
10) Integration of the newly built 3 kV switchgear "Kościuszko to the MUZnet supervision system operating in the Głowna Stacja Transformatorowo Rozdzielcza
15/3 / 0.4 kV, update and commissioning,
11) control and measurement,
12) Development of as-built documentation and addition to the documentation
3. The 3 kV switchgear should be at least:
1)-For poles with 12 kV voltage switch,
2) Surge suppressor voltage 75 kV,
3) Test voltage 1 min. 50 Hz 28 kV,
4) Rated continuous current of busbars 630 A,
5) Rated continuous pol current with switch 630 A
6) Rated peak current 63 kA
7) Rated current 1-sec. 25 kA,
8) Resistance to internal arcing 25 kA / 1s.
4. The switchgear should additionally meet nthe following requirements:
1) have a compartment structure, in a metal enclosure with air insulation,
2) Two-part distributive panels consisting of a fixed unit and a withdrawable unit,
3) Distribution boxes having separated compartments: rail, connection, apparatus and auxiliary circuits,
4) Have a single bus bar system,
5) Be resistant to the effects of the electric arc formed ininside the enclosure,
6) Be equipped with decompression channels limiting the pressure increase in the case of arcing faults in spaces,
7) To be equipped with a vacuum switching apparatus,
8) To be equipped with digital power protections,
9) To be made as an interior, freestanding, IP 54,
10) Distribution boxes with sheet metal construction,
11). To be corrosion-resistantę, the switchgear structure is made of galvanized steel sheet coated with a layer of aluminum with zinc,
12) Door and side and rear covers protected against the influence of external factors with powder lacquer.
5. The 3 kV switchgear should meet the requirements of the following standards and regulations or equivalent:
• PN-EN 62271-200: 2012 High-voltage switchgear and control equipment Part 200:alternating current districts in metal shields for voltages above 1 kV up to 52 kV total,
• PN-EN 62271-1: 2018-02 High voltage switchgear and controlgear Part 1: Common provisions for AC switchgear and controlgear,
• Confirmation certificate the rated data issued by the relevant unit.
6. Equipment and materials used for the construction of the psettle CE declaration of conformity. • Detailed information on the subject of the order and the rules for its implementation are included in the ToR, which is available on the Employer's website www.kopalniawieliczka.eu. Part VI of the Terms of Reference - Pursuant to art. 22 ust. 1 of the Act on the award of the contract may apply to Contractors who meet the conditions regarding:
1) the competence or authority to conduct specifiedprofessional activity - entry into one of the professional or trade registers held - in a Member State of the European Union in which the Contractor is established, defined in Annex XI to Directive 2014/24 / U or meet other requirements specified in this Annex or entry in the Central Register and Information on Economic Activity,
2) economic or financial situation of the posiagiving the Contractor insurance against civil liability in the scope of business activity related to the subject of the order in the amount of at least PLN 500, 000 (policy and in the absence of any other document confirming that the Contractor is insured), - 3) technical or professional capacity in accordance with section III point 1.3) of this announcement.
2. Evaluation of fulfillmentby Contractors of the above the conditions for participation in the proceedings will be made on the basis of the submitted documents set out in Part VIII of the specification. The Contractor may, in order to confirm the fulfillment of the conditions for participation in the proceedings, rely on the technical or professional capacity or financial or economic situation of other entities, regardless of the legal nature of the connections that it has with him / her.in legal. In such a case, the Contractor must prove that when performing the order, he will have the necessary resources of these entities, in particular presenting with the offer the undertaking of these entities - to provide him with the necessary resources for the needs of the order. The Awarding Entity shall request the submission of relevant documents, in accordance with - 9 of the Ordinance of the Minister ofof 26.7.2016 on the types of documents that the contracting authority may request from the contractor in the procedure for awarding the contract and the documents indicated in Part VIII of the specification, relating to entities on the capacities of which the Contractor will rely. If the technical or professional capacity or economic or financial situation, the entity referred to above do not confirmthe Contractor satisfies the conditions of participation in the proceedings or the grounds for exclusion are applicable to these entities, the Employer requests that the Contractor, on the date specified by the Employer:
1) replaced this entity with another entity or entities or - 2) undertook to personally perform the relevant part of the order, if it shows the required technical or professional capacity or the financial situationanswering or economic.
4. In the event of a change or resignation from the subcontractor referred to in point 3, the Contractor shall be obliged to demonstrate to the Ordering Party that the proposed other subcontractor or Contractor independently fulfills the conditions for participation in the proceedings to the extent not less than the subcontractor for which the Contractor referred during the proceedings for ordering.
Part VII of the ToR -The basis for exclusion.
1. The Awarding Entity will exclude from the proceedings for the award of public contractors for whom the circumstances referred to in art. Paragraph 24
. 1 of the Act, subject to the provisions of art. 24 sec. 7 11 of the Act
2. The Employer will exclude from the proceedings for awarding public contractors, referred to in art. 24 sec. 5 point 1 8 of the Act, subject to the provisions ofArticles 24 sec. 8 9 of the Act
3. The ordering party shall call the Contractor whose tender will be the highest rated, to submit within the prescribed period, not shorter than 10 days, below mentioned declarations or documents (valid as at the date of submission) confirming fulfillment of the conditions of participation in the proceedings and no grounds for exclusion, subject to points 9 and 10 in partci VIII SIWZ.
Possession by the Contractor of civil liability insurance in the scope of economic activity related to the subject of the order in the amount of at least PLN 500, 000.00 (policy and in the absence thereof, another document confirming that the Contractor is insured),
Ordering prior to the order being awarded, will call the Contractor whose offer will be the highestenion, to submit within the prescribed period, not shorter than 10 days, below mentioned declarations or documents confirming the fulfillment of conditions of participation in the proceedings and no grounds for exclusion:
In relation to the lack of grounds for exclusion:
a) information from the National Criminal Register in the scope specified in art. 24 sec. 1 point 13, 14 and 21 of the Act and regarding conviction for offense against penaltiesarrest, to the extent specified in art. 24 sec. 5 point 5 or 6 of the Act, issued not earlier than 6 months before the deadline for submitting offers;
b) certificate of the competent head of the tax office confirming that the Contractor is not in arrears with the payment of taxes, issued no earlier than 3 months before the deadline for submission of tenders, or another document confirming that the Contractor has concluded-agreement with the competent tax authority regarding the repayment of such receivables together with any interest or fines, in particular obtained legally permissible, postponement or payment of overdue payments or suspension of the full implementation of the decision of the competent authority; c) certificate of the relevant organizational unit of the Insurance Institution Social or Ro Cash RegisterSocial Security or other document confirming that the Contractor is not in arrears with paying social security or health insurance contributions, issued not earlier than 3 months before the deadline for submission of tenders, or other document confirming that the Contractor has made an agreement with the competent authority regarding repayment of these receivables with any interest or fineami, in particular, obtained legally required exemption, postponement or spreading into installments of overdue payments or suspension in full of the decision of the competent authority; d) excerpt from the relevant register or from the Central Register and Information on Business, if separate provisions require entry in the register or records in order to confirm the absence of grounds for foreclosure on the basis ofknows art 24 sec. 5 point 1 of the Act;
e) declaration of the Contractor about the lack of a ruling against him as a preventive measure to prohibit applying for public orders. F) Declaration of the Contractor about the lack of a final conviction judgment for a restriction of liberty or a fine to the extent specified in Article . 24 sec. 5 point 5 or 6 of the Act.
G) Contractor's statement about lack of issuanceand to him a final administrative decision on violation of obligations under the provisions of labor law, environmental law or social security regulations to the extent specified in art. 24 sec. 5 point 7 of the Act.
H) Contractor's declaration on not paying taxes and local fees, referred to in the Act of 12.1.1991 on taxes and local fees (Journal of Laws. from 2016, item 716). I) the contractor's statement that he has not been the subject of a final court judgment or final administrative decision on late payment of taxes, fees or social security or health insurance premiums or in the event of such a verdict or decision confirming the payment of these claims together with possible interest or a fineand / or the conclusion of a binding agreement regarding the repayment of these receivables. - j) the Contractor's declaration on whether or not to belong to the same capital group; in the case of being part of the same capital group, the Contractor may submit together with the statement documents or information confirming that connections with another contractor do not lead to - To distort competition in the proceedings.
A detailed list of statements or documents to be provided by the contractor in order to confirm the fulfillment of the conditions for participation in the procedure, fulfillment of the requirements specified by the ordering party and the lack of grounds for exclusion is described in Part VIII of the ToR.
Internet address (URL): www.kopalniawieliczka.eu
Directive: Classical Directive (2014/24/EU)

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Electrical machinery, apparatus, equipment and consumables; lighting was 30 May 2018. Bidding is closed.

This tender has been issued by KOPALNIA SOLI „WIELICZKA” SPÓ?KA AKCYJNA in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 31000000 - Electrical machinery, apparatus, equipment and consumables; lighting, 31213100 - Distribution boxes, 51100000 - Installation services of electrical and mechanical equipment, 51112000 - Installation services of electricity distribution and control equipment.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 22630003. The purchaser document reference is 171307-2018.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Defence and Security, Materials and Products in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.