Exeutive Summary

The ОБЩИНА ВЕЛИКО ТЪРНОВО has issued a Tender notice for the procurement of a Contract notice: Electrical installation work in the Bulgaria. This Tender notice was published on 28 Apr 2020 and is scheduled to close on 01 Jun 2020, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 42513374, while the tender notice number is 194966-2020 and Register on the platform.

Key facts

Summary
Contract notice: Electrical installation work
TOT Ref. No.
42513374
Document Ref. No.
194966-2020
Country
Bulgaria
Notice type
Tender
Competition
ICB
Publication date
28 Apr 2020
Bid deadline
01 Jun 2020
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Electrical installation work
Description: Contract notice: Electrical installation work
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Mixed
CPV code: 45310000, 45311000, 45310000, 45311000
CPV Description:
Electrical wiring and fitting work
Performing electrical installation work, making new electrical installations connections and power supply to the transmission network and other activities for the needs of Veliko Turnovo Municipality, by lot
Lot 1: Displacement of two cables located within the territory of the Old Military School;
Main Site: Old Military School- Veliko Tarnovo, 582, Building I, Square Center PI with ID: 10447.513.273.
It is necessary to move two cables. The implementation of this position consists of the following activities:
1 Excavation 1 / 0.8 / 0.6
2 Pavement pavement - concrete
3 Pavement pavement - with pavement tiles
4 Pavement pavement
5 Pavement asphalt pavement
6 Asphalt cuttingthis pavement
7 Restoration of pavement - concrete
8 Restoration of pavement with tiles new
9 Restoration of pavement with tiles - old
10 Restoration of asphalt pavement on the road
11 Digging III category 0.8x0.4
12 Digging III category 0, 8 / 0, 4 cable / cable
13 Direct excavation III category 1, 1x0, 4
14 Construction excavation III category 1, 1x0, 4 cable / 15 Delivery and installation of PVC pipes ф110in concrete jacket
16 Delivery and laying of PVC pipes ф110 mm excavation
17 Make a sand substrate and cover with PVC signal strip - for one cable
18 Backfilling with sand collector
19 Delivery and installation of cable brands
20 Connecting cable to existing dashboard / facility
21 Loading and removal of construction waste
22 Making a hole in concrete
23 Preparing to attach a new line
24 Downloading nand cable СНН in pipes of 120 mm inclusive - one core
25 Cable coupling СРН - for one core
26 Delivery of cable type NA2XS (F) 2Y 185 mm
27 Delivery cable head 20 КV "ZM" indoor installation
28 Delivery of cable sleeve Av. H
29 Straightening manhole for collector 1, 7 / 1, 2 / 1, 2
30 Installation of PVC pipes ф140 in concrete jacket
31 Laying of PVC pipes ф140 mm in excavation
32 head Wed, kit for threesludge
33 Tracing a 20 kV or 1 kV cable
34 Preparation of a design for a 1 kV cable (Electro, Surveying, PB, PBZ, VOD) and carrying out of the author`s supervision.
The quantities of necessary works specified in the technical specification are estimated. and should be specified in the technical design. The contract price offered cannot be increased, despite the change in the quantities ofsome of the types of work.
The contracting authority places a requirement on the participants for suitability (capacity) for pursuing a professional activity, as follows:
The participants must be registered in the Central Professional Register of Builders (CPRS) with the Bulgarian Construction Chamber, in accordance with Art. . 3, para. 2 of the Law on the House of Builders (ZKS), and participants - foreignpersons - in a similar professional or commercial register, according to the legislation of the Member State in which they are established, for the execution of works, as follows:
- for lots No 1, 2 and 3 - first group of works, third category,
- for Lot 4 - Fifth group of works.
Proof of the stated requirement:
When submitting the offer, the fulfillment of the requirement is verified by itselfo Indication of the entry in Part IV, Section A of the EDES, submitted by each of the participants, members of the associations, subcontractors. Indicate whether the relevant documents are available in electronic format, as well as the web address, authority or service issuing the registration document and the exact reference of the document.about Art. 112, para. 1, item 2 of the PPA, or upon request in the course of the procedure in the cases of Art. 67, para. 5 of the Public Procurement Act, namely, a copy of the document for registration with the Chamber of Builders in the Republic of Bulgaria according to Art. 3, para. 2 of the Law on the Construction Chamber (ZKS) for the execution of construction works of the required group and category; for foreign persons - equivalent document prepared in accordance with national law ofthe participant, issued by a competent authority of the country in which he is established, proving such registration in a similar register, in accordance with the law of the state in which they are established. a participant in the association who will perform the construction according to the distribution of the participation of the persons in theimplementation of the activities provided for in the document establishing the merger. Tenderers shall indicate in the offer the subcontractors and the contractual portion that they will be awarded if they intend to use them. removal from procedureYes.
Not placed.
The construction of the construction works is carried out in accordance with. with Part Three "Construction" of the Spatial Planning Act and begins after the entry into force of the RS and after the signing of a prot-l for opening a page site and determining a page line and level of construction (for items 1-3). The contractor will exercise auto-supervision during the construction, in accordance with the approved design documents and the applicable regulatory framework according to the design expertsthe other parts of the project or the persons completed by them, provided that it is complete. Persons possess a qualification corresponding to the minimum required by the expert expert in the procedure laid down in the procedure and have been approved in advance by the unit (for items 1-3). A participant shall be removed from participation in the procedure when any of the listed grounds in Art. 54, para. 1, items 1-7 of the PPL. It may not be removed from the uchek procedure, for whom the above-mentioned bases are present if he / she submits the ones provided in Art. 56, para. 1 of the PPA proves the measures taken to prove its reliability and they are sufficient to guarantee its reliability. All Bulgarians can submit bids in the procedure. or foreign. Phys. or YuL, incl. their associations, as well as any other. entity entitled to carry out the activities covered by the lease, in accordance withthe law of the country in which it is established. order, if he can submit tenders and conclude contracts in accordance with himself. the law of the country in which it is established. The node removes from the procedure:
1. a unit that does not meet the selection criteria or does not meet the other criteria. the condition specified in the announcement-that is common. order or in the documents;
2. a tenderer who has submitted an offer which does not meet:
a) the pre-announced conditions for fulfilling the order;
b) rules and requirements related to environmental protection. environment, social and labor law, applicable collective disputes and / or provisions of international environmental law, social and labor law, which are listed in App. No. 10 of the Public Procurement Act;
3. student who did not submit toterm the justification under art. 72, para. 1 of the PPA or whose offer was not accepted in accordance with Art. Art. 72, para. 3-5 of the Public Procurement Act;
4. affiliates;
5. Units that have submitted an application or offer that do not qualify for submission, including form, manner, time limit and validity;
6. a person who has violated the prohibition under Art. 101, para. 9 or 10 of the Public Procurement Act;
7. participants in which there is a circumstance under Art. 3, item 8 of ZIFODRUPDRTLTDS, in other cases specified in the participation documents. He is not eligible to participate or represent a natural person. or JU in the procedure, a person for whom the circumstances under Art. 69 of the CITES.
2. Pursuant to Art. 47, para. 4 of the Public Procurement Law, I state that information: - on tax and benefit obligations can be found by the NRA:
- on environmental protection. environment of can be findMoEW,
- on employment protection and working conditions can be found by MLSP.
3. When submitting the offer for participation, the student declares the lack of grounds for removal and complies with the selection criteria by submitting an EDES (in accordance with the requirement of Article 67, paragraph 1 of the Public Procurement Law). In the event that the student has indicated that he will use subcontractors to demonstrate compliance with the selection criteria, for eachThese persons shall be presented with a separate EDES containing the information under Art. 67, para. 1 of the Public Procurement Act; in the case of non-legal lunches, the selection criterion is proved by the merged student, not by any person, including him, with the exception of . registration, certification, etc. the condition necessary for the execution of the order, in accordance with demanded the norm. or administrative act and according to the distribution ofthe participation of persons in carrying out the activities provided for in the agreement establishing the association. The learner designated site selects the form of the performance vehicle according to. of the art. 111, para. 5 of the PPL. The nodule determines that the GI is at the rate of 4% of the dr-st`s without VAT in the respective volume. position. Fulfillment submits Ms securing the advance in its entirety in one of the forms specified in the law. PThe house is released within three days after the advance has been utilized. Bids may be submitted for either one, two, three or all volumes. positions.
Internet address (URL): www.veliko-tarnovo.bg

Documents

Tender Notice
Login to view

Similar tenders

Bulgaria Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Electrical installation work was 01 Jun 2020. Bidding is closed.

This tender has been issued by ОБЩИНА ВЕЛИКО ТЪРНОВО in Bulgaria.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45310000 - Electrical installation work, 45311000 - Electrical wiring and fitting work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 42513374. The purchaser document reference is 194966-2020.

See the Similar Tenders section on this page or browse other tenders from Bulgaria.

This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.