ODENSE KOMMUNE has floated a tender for Contract notice: Electrical installation work. The project location is Denmark and the tender is closing on 18 Mar 2019. The tender notice number is 077970-2019, while the TOT Ref Number is 30822190. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Denmark

Summary : Contract notice: Electrical installation work

Deadline : 18 Mar 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 30822190

Document Ref. No. : 077970-2019

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : ODENSE KOMMUNE
Office Name: Odense Kommune
Address: Flakhaven 2
Town: Odense
Postal Code: 5000
Contact Point: Charlotte Trillingsgaard



Denmark
Email :cbtri@odense.dk
URL :http://www.odense.dk/

Tender Details

Object of the contract
Electrical installation work

Description: Contract notice: Electrical installation work

Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Competitive procedure with negotiation
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45310000, 45311000, 45311100, 45311200, 45312100, 45312200, 45313100, 45241600, 45316100, 45316110, 45310000, 45311000, 45311100, 45311200, 45312100, 45312200, 45313100, 45241600, 45316100, 45316110
CPV Description: Electrical installation work.

Electrical wiring and fitting work.

Electrical wiring work.

Electrical fitting work.

Fire-alarm system installation work.

Burglar-alarm system installation work.

Lift installation work.

Installation of port lighting equipment.

Installation of outdoor illumination equipment.

Installation of road lighting equipment.

E06 El-entreprise inkl. elevatorer til museum "Det nyH.C. Andersen's House "

When Odense Municipality closed Thomas B. Thriges Gade in 2014, it became the start of a transformation of the area. At the same time, the opportunity arose to gather the dissemination of HC Andersen's imagination, life and adventure in a new, large museum. : Odense.

Entreprise E06 consists of a main supply up to the low-voltage switchboard via a transformer placed on the cadre delivered and installby the utility company. In addition to the new transformer, the project requires a redundant supply via Bang Boder's existing transformer. Traction runs are performed to establish connections. The main board supplies distribution boards located strategically in a building. Separate distribution board is established for the kitchen and cafe, as this is to be rented and thereby settled through its own painter with the utility company.

A network of main roads links the main board with the distribution boards. In the lower level, a network of main roads is installed for the exhibition under EDB floor and in the engineering. The routes are divided in order to ensure the correct separation between the systems.the ceiling and selected columns to supply the exhibition with AV, light and electricity. The exhibition itself with objects, fittings etc. and the electronic control thereof is performed by the exhibition contractor / AV installer as "plug and play" solution. This "plug and play" solution is established by the El installer via electrical installations for the entire exhibition up to and including the wall, ceiling or under yellow

Lighting installations are established for the entire museum and especially for the exhibition, where contact rails must be shared with the exhibition contractor / AV installer. Contact rails are included in the supply for the electricity contractor. The contact rails are supplied with DALI.

Lighting luminaires for basic lighting and for the exhibition cleaning are supplied by the electricity contractor. Luminaires for the exhibition itself are includedthe exhibition contractor / AV installer according to the drawing material. Lighting is created for the garden in the terrains, as well as the super bike path and at Bang's stalls.

Power installations are carried out by the electricity contractor for the entire museum and in the garden. selected drawingspoints for outlets where the inserted reinforcement is connected to create a total coherent equalization network.

Transport facilities, personal and freight elevator are established 4 places in the building

IT infrastructure is established for the museum. A main intersection and underpass fields are established for the kitchen and administration, the children's universe, the workshop and the Foyer. The network is connected to fiber optic cables. All PDS installations are terminated in patch panels and are named according to Odense Municipality's Cabling Standard. The active equipment for all cross fields is not included in the electricity contract.

A complete ABA and automatic warning system are installed. Three languages are notified throughout the building. For engineering rooms only warning in the form of tone and gaze is used. Microphone for alerting the plant is located at ABA central

Security lighting must be established for the entire museum according to the fire strategy and plans for escape routes.

In connection with existing buildings, renovations and supplies must be renovated. Inspection of existing buildings before bidding should be carried out. Routing routes must be established for access access control and AIA system for plug-in parts.r must enclose a completed ESPD section IV.B completed as described below.

Applicants must state in the ESPD section IV.B the following financial figures for the last 3 completed financial years, cf. in each of the last 3 available, completed and audited financial statements, - equity in each of the last 3 available, completed and audited rainfallsIt should be noted that applicants may apply for a pre-qualification as a consortium or by relying on the economic and financial capacity of other economic agents, cf. In this context, the aggregate companies' total figures would have to meet the minimum requirements. Therefore, each participant in an association should state their own annual turnover and equity for each of themlatest 3 completed and revised financial statements.

If you wish to apply to participate in this bidding process, you must complete the published ESPD call espd-requestdanskI am a financial operator import ESPD,

- Upload the ESPD file that you have saved on your computer,

- Choose Denmark as a country (if you are a Danish applicant),

- Complete the ESPD with the information stated in the tender documentthe application, including parts II.A, II.B, II.C, III.A, III.B, III.C, IV.B and IV.C,

- note that the applicant must submit several ESPDs, if the applicant constitutes an association of companies or is based on the capacity of other financial actors, - when the ESPD is completed, it can be 1) printed as PDF and 2) exported and saved. The ESPD must be submitted electronically in pdf and xml. Note that more of textbooktenders can be expanded after printing is printed.

Applicant in the ESPD must state the name, CVR number, address, contact person, whether the applicant is a micro company, small or medium-sized company and whether the applicant participates in the tender procedure with others (ESPD II.A). Applicants must provide the information requested in Part III of the contract notice.

The applicant must confirm that the application is not ocovered by the mandatory exclusion grounds in section 135 of the Public Procurement Act. 1 - 3 and 136 (ESPD Part III, paragraphs A, B and C). Applicants must also confirm that the applicant is not covered by the voluntary exclusion grounds in section 137 (1) of the Public Procurement Act. 1, paragraphs 1, 2, 4 and 5 (ESPD Part III, Section C).

The information requested forms the basis of the contracting entity's assessment of the applicant's ability toLift up the job offered and which candidates are invited to tender. - If the applicant participates in the tendering procedure with others, especially as part of a group, consortium, joint venture or the like, all affected participants must submit a separate ESPD . All required information under Part III must be provided for each participant in the consortium. It will in connection with suitability vHowever, the assessment is the overall suitability of the consortium to be assessed. If the required information is not provided by all consortium participants, the offer is not necessarily fitness-like, but it may have an impact on the suitability assessment. Furthermore, each participant in the individual ESPD shall indicate the role of the economic operator in the group, the other economic actors participating in the procedure.if applicable, the name of the participating group (ESPD Part II.A).

If the applicant cannot meet the requirements of financial and economic and / or technical and professional capacity, then the applicant may rely on the financial and economic and / or other or technical and professional capacity. In that case, any subcontractor of the applicant must also attach a separate ESPD with completed Part II ofsections A and B and Part III, which are duly completed by the entities concerned (ESDP Part II, Section C). In connection with the assessment of suitability, it will be the total suitability that is assessed, including when aggregating figures.

It is noted in accordance with point IV.2.4) that documentation not available in Danish can be submitted in English an application for pre-qualification.As soon as the same legal entity is part of or otherwise participates in several applications, eg. If you submit your own application, but at the same time submit as a participant in a consortium that applies, the applicants must ensure that the participation of the same legal entity does not allow the recipient to mutually influence the content of the various tenderers' offers.f. Section I.3 of the contract notice. ESPD should be enclosed in both xml file and pdf.


Internet address (URL): http://www.odense.dk/

Documents

 Tender Notice