Tender notice from Switzerland, published on 22 Aug 2019.
Exeutive Summary
The OFFICE FÉDÉRAL DES ROUTES — INFRASTRUCTURE ROUTIÈRE OUEST FILIALE ESTAVAYER-LE-LAC has issued a Tender notice for the procurement of a Contract notice: Electrical engineering installation works in the Switzerland. This Tender notice was published on 22 Aug 2019 and is scheduled to close on 11 Oct 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 35698734, while the tender notice number is 397471-2019 and Register on the platform.
Key facts
Summary
Contract notice: Electrical engineering installation works
Object of the contract Electrical engineering installation works Description: Contract notice: Electrical engineering installation works Authority Type: Ministry or any other national or federal authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: Agreement between the European Union and the Swiss Confederation Award criteria: The most economic tender CPV code: 45315100, 45315100 CPV Description: Electrical engineering installation works. N05.60 080173 - Upn.Yverdon - Concise - Power, signaling and wiring connections - lot 201 (ID 6209) This call for tenders concerns the BSA works of the UPlaNS of the Highway N05 between Yverdon Junction and Concise. BSA works are mainly aimed at cleaning up the electromechanical equipment in coherence with theCivil engineering measures to be carried out. Main Site: N05 Yverdon-Concise National Road, Cirnor and Onest Premises, and OFROU's F1 Branch at Estavayer-le-Lac (meetings). This tender relates to: the BSA works of the UPlaNS of the N05 motorway between Yverdon and Concise junction. BSA's work is mainly aimed at cleaning up electromechanical equipment in a coherent manner.with the civil engineering measures that will be carried out. The works concern the following elements: - renewal or modification of the power supply boxes, - LV cable pull (about 5.5 km), - fiber optic cable pull ( about 27 km), - supply of field equipment (CoT, oil separator, weather station and recovery of existing), - creation of fiber optic sleeves, - groundingnew installations, slides under HV lines, - CFF circuit breaker cables under viaduct, - depose. The following attestations / confirmations must be filed at the same time as the tender file unless otherwise specified. ; if not, the offer will not be examined. Bidders are urged to use the tender document provided with the tender documents into order the evidence. Q1 technical capacity. Q1.1 reference of the bidder A reference work of comparable complexity, already done, in the same specialized field. In addition to the description, it will indicate the dates, the amount of work and the name of the client. For work done in consortium, the company indicates the nature of the tasks carried out by its ownns and the percentage share of its services, on all the works. The company indicates the work in reference carried out by subcontracting. This information must be included in the tender document. Q1.2 subcontracting 70% maximum of the service may be provided by subcontracting. Q2 economic and financial capacity. Q2.1 turnover The annual turnover ofthe bidder is greater than twice the annual amount of the contract. Q2.2 documents to be submitted Documents to be submitted with the tenderer's tender: - voluntary declaration by the tenderer (signed), - extract (s) from the commercial register or, for foreign-based companies, similar certificate (s) (less than three months from the time of submission of the offer), Q2.3 Certifications to be submitted after the award of the tender Certifications to be submitted after the tenderer has been submitted the tender at the request of the contracting authority within a period of 7 days: - certificate from the Office of Bankruptcy stating that the company is not in liquidation, - extract from the register of prosecutions (more recent than three months compared to the time of deposit of the offer), - justificaof current payments for AVS / AI / APG / AC as well as SUVA and AFC, - justifications of current payments for the LPP, - professional liability insurance certificate (s) for damage and hedge amounts as accurate in the draft contract. Q3 key persons. Q3.1 reference of the key person A reference book of the key person (*) relating to a projectof comparable complexity, already realized, indicating the period, the overall investment of the project, the executed works and the interlocutor (prime contractor) authorized to provide information. (*) As key person is considered the person who will carry out the function of project manager. Q3.2 availability Proof that the availability of the key person is greater than the availability requiredarea for the duration of the project. Detailed listing and description of the load over time within the company and other projects Partial offers are not allowed. Conditions for countries not having adhered to WTO agreements: none. General conditions: according to the draft contract provided. Negotiations: remain reserved. Conditions governing the procedure: the power adjpublic contracts awarded for services in Switzerland only to contractors who guarantee compliance with the provisions on the protection of workers, working conditions and equal pay for men and women. Other information: 1) criteria for 'tender. Bidders are urged to use the tender document provided with the call-in documents.offers to order the evidence. C1 Price [50%] proofs for this criterion: - price list, specifications. Elements of judgment: the price considered for the evaluation is the amount of the offer with discount, without discount and without VAT, after control by the representative of the MO and correction of arithmetical errors. The price evaluation is carried out according to the following method: the maximum score(5) is allocated to the revised offer at the lowest price. Bids, which are priced 50% or more higher than the lowest offer, score 0. Between 2, the valuation is linear and takes hundredths. C2 Quality of the equipment and the execution [40%] proofs for this criterion: - technical memory, - technical sheets of the builders, - program of works, -references for a market of similar complexity. Elements of judgment: - adequation and quality of the technical solutions and equipment proposed for the execution of the market, - developed methodology, - identification of interfaces, - respect of deadlines and optimization of planning, - relevance and adequation references. C3 Means to ensure the quality of the work [10%] Evidence forthis criterion: - Organigram, - risk analysis, - CV and diploma of the project manager and site manager. Elements of judgment, organization chart: - relevance and adequacy of the organization. Risk analysis: - relevance of the specific risks to the realization of the project, - adequacy of the proposed measures to eliminate or reduce the risks and definition of the responsible persons. People:project leader and site manager in the tenderer's organizational chart: - basic and continuing training in relation to the areas concerned by the project, - experience: number of years of experience in the areas concerned by the project, adequacy of reference projects in relation to the market, functions performed in reference projects. Mastery of the French languageis. For all the proofs: - quality and clarity of the documents. Evaluation of the award criteria other than the price criterion: the evaluation is always indicated by means of the grades 0 to 5, 0 = evaluation impossible / - / no information, 1 = criterion very poorly filled / - / insufficient information and incomplete, 2 = poorly fulfilled criterion / - / information not sufficiently related to the project, 3 = criterion remsufficient fold / - / sufficient quality corresponding to the requirements of the tender offer, 4 = well-filled criterion / - / good quality, 5 = very good criterion / - / excellent quality, very important contribution to the achievement of the goal. Calculation of points: sum of all the notes multiplied by their weighting (maximum points possible: score 5x100 = 500 points). Decimals mustbe taken into account in the context of the multiplication by the weighting of the criterion concerned. 2) Site visit: no site visit is planned. (3) Payment of tenders, return of documents: the drawing-up of tenders is not remunerated. The offer files are not returned. (4) Adjudication of services: the successful tenderer has no right to a full award ofs tenders put out to tender. 5) Obtaining the parts of the file: the parts can be consulted ... Internet address (URL): https://www.simap.ch
The bid deadline for Contract notice: Electrical engineering installation works was 11 Oct 2019. Bidding is closed.
This tender has been issued by OFFICE FÉDÉRAL DES ROUTES — INFRASTRUCTURE ROUTIÈRE OUEST FILIALE ESTAVAYER-LE-LAC in Switzerland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45315100 - Electrical engineering installation works.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 35698734. The purchaser document reference is 397471-2019.
This tender falls under Construction and Real Estate in Switzerland. Suppliers in these sectors can track similar Switzerland tenders using CPV-based alerts.