Contract notice: Electric buses Tender in Romania - 30468311
Tender notice from Romania, published on 07 Feb 2019.
Executive Summary
The PRIM?RIA MUNICIPIULUI ZAL?U has issued a Tender notice for the procurement of a Contract notice: Electric buses in the Romania. This Tender notice was published on 07 Feb 2019 and is scheduled to close on 11 Mar 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 30468311, while the tender notice number is 059554-2019 and Register on the platform.
Object of the contract Electric buses Description: Contract notice: Electric buses Authority Type: Regional or local authority Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 34144910, 30123100, 31682540, 42961300, 45232221, 71322500, 34144910, 30123100, 31682540, 42961300, 45232221, 71322500 CPV Description: Electric buses. Ticket-validation machines. Substation equipment. Transformer substation. Engineering-design services for traffic installations. Supply contract - "Urban electric busses with fully lowered floor, -ticketing and related systems, power stations for electric buses " Reference Number: 4291786/2018 / C3 Supply contract - "City-buses with electric propulsion and fully lowered floor, e-ticketing system and related systems, electrical power stations for electric buses" Main Site: SC Transurbis SA, Fabricii Str. / A, Zalău. Supply - "Urban buses with electrically propelled and fully lowered floor, e-ticketing system and connected system, charging stations with enelectric buses of electric buses " The following equipment / products will be purchased: 1) Urban electric bus - 20 pieces, of which: 10 urban electric bus range 10 m, - 10 urban electric motor range 12 m, - service pre-production service, before delivery of the first bus through a delegation of a delegate, has acquired a form of 3 persons by the purchaser on a maximum of 6 days (5 nights);Monitor. of the fleet for 65 bus, with mounting and putting. in operation, which incl.: 65 calc. on ITS board, 45 lithrometric probes, - infrastr. IT for. Dispatcher. and place. exploitation, 2 access point for data loading; 3) Sist. e-Ticketing for 65 bus, with mounting and putting. in operation, which includes: - 195 double validators (60 pieces in 20 new cars and 135 units in 45 buses in the fleet), - 40, 000 card. thatoperator and operator, - 10 vending machines, - infrastr. IT; 4) Sist. to inform. traveling in 10 bus stations. and 20 bus, with mounting and putting. in function, which incl.:20 set. to inform. on the bus, - 10 sets. to inform. in bus stations; 5) Sist. monitor. passengers, with mounting and putting. in function, which incl.:20 set. Monitor. on the bus. (cam video), 20 sets. counting passengers, - 10 set. monitor. bus stops, - 1 dispatcher, 6) Sist. integrated gesture. diagnose. Elect. via CAN - 20 sets. 7) Progr. and licenses: 65 lic. - communication module, 1 lic. pt. system. e-ticketing, 1 lic. for manag. fleet and reporting, - lic. system. of oper., - sist. shapeless. integrated; 8) Loading stations for Dumping. electric, incl. project, construction, assembly and putting. in funct. which includes: 6 charging stations. fast, 20 charging stations. slow, 2 transform; 9) SDVs, team. and software. specif. pt. maintenance and repair of parts and mat. the first endowment. Val. east. - 58, 121, 885.00 RON without VAT. Cl. susp. applies. 8 months from stable. winner. Request no. 1. Declaration on non-compliance with the provisions of art. 164 of Law no. 98/2016 (leader, asocthe sole contractor / the associated tenderer / the subcontractor / the supporting third party must prove that they do not comply with the provisions of art. 164 of Law no. 98/2016. The way in which the fulfillment of the requirement can be demonstrated: it will be completed by the economic operators participating in the prior attribution procedure with the information related to the situationin accordance with the provisions of art. 193 par. (1) of the Law no. 98/2016. The requirement for non-compliance with the situations provided in art. 164 is also addressed to the associates / subcontractors and third party supporters according to art. 170/1 and art. 183/1 of the Law no. 98/2016, as amended and supplemented. The supporting documents proving the fulfillment of the assumed ones by completing the DUAEs are to be submitted, at the request of the contracting authority, only by the first ranked bidder in the intermediate rankings drawn up at the completion of the tender evaluation. Incorporation into one of the situations provided in art. 164 of Law no. 98/2016 entails the exclusion of the tenderer in the present proceedings. 2. Declaration on non-compliance with the provisions of art. 165 of Law no.98/2016 (Leader, Associate, Third Party, Subcontractor) Means of performance: The sole tenderer / associated bidder / subcontractor / third party must prove that they do not comply with the provisions of art. 165 of Law no. 98 / 2016. The manner by which the fulfillment of the requirement can be demonstrated: the DUAE will be filled in by the economic operators participating in the award procedurewith the information related to their situation, according to the provisions of art. 193 par. (1) of the Law no. 98/2016. The requirement for non-compliance with the situations provided in art. 165 is also addressed to the associates / subcontractors and third party supporters according to art. 170/1 and art. 183/1 of the Law no. 98/2016, with subsequent amendments and completions. The supporting documents that prove to be fulfilledthe initiation of those assumed by the completion of the DUAE shall be submitted, at the request of the contracting authority, only by the tenderer placed on the first place in the intermediate rankings drawn up at the completion of the evaluation of the tenders. the consolidated general budget at the time the document was presented. Incorporation into one of the situations provided in art. 165 or failure to comply with the provisions of art. 166 par. (2) of the Law no. 98/2016, with the subsequent modifications and completions, entails the exclusion of the tenderer from this procedure. 3. Declaration on non-compliance with the provisions of art. 167 of the Law no. 98/2016 (leader, associate, third party, subcontractor). Way of accomplishment: the sole tenderer / the associated offeror / the subcontractor / third party must prove that they do not comply with the provisions of art. 167 of the Law no. 98 / 2016. The manner by which the fulfillment of the requirement can be demonstrated: it will be completed by the economic operators participating in the award procedure, with the information related to their situation, according to the provisions of art. 193 alinto the. (1) of the Law no. 98/2016. The requirement for non-compliance with the situations provided in art. 167 is also addressed to the associates / subcontractors and third party supporters according to art. 170/1 and art. 183/1 of the Law no. 98 / 2016. Incorporation into one of the situations provided in art. 167 of Law no.98 / 2016 entails the exclusion of the tenderer from the present procedure. The supporting documents proving the fulfillmentthe initiation of those assumed by the completion of the DUAE shall be submitted, at the request of the contracting authority, only by the tenderer placed on the first place in the intermediate rankings drawn up during the evaluation of the tenders. .] details on www.e-licitatie.ro Requirement no. 1. Financial Statement: Turnover afor the year 2017 to be at least RON 75, 000, 000 or equivalent. The annual average RON / foreign exchange rate communicated by the NBR will be applied. 1) If there are 2 or more bidders who have obtained identical scores and ranked 1st in a list of admissible bids, the final ranking will be based on financial offers. If financial offers are in their turnthe contracting authority will require the tenderers concerned to re-submit the offline financial proposal, following the conclusion of the contract with the tenderer whose new financial proposal has the lowest price; 2) The contracting authority will not respond to requests for clarifications made by exceeding the deadline set in Section I of these Instructions to tenderers. authoritycontracting authority will post reply. accompanied by questions in SEAP, according to art. 160 par. (3) of the Law no. 98/2016. In accordance with Art. 160 par. (1) of Law 98/2016, with subsequent amendments and completions, the deadline by which any economic operator interested in participating in the public procurement procedure has the right to request clarification or additional informationis related to the awarding documentation is 20 days before the deadline for submitting bids. In accordance with prev. art. 160 par. (2) of Law 98/2016 with Modif. and compl. the Contracting Authority shall set the deadline in which it will respond to all requests for clarification / information. supplement. 11 days before the deadline for submitting bids; 3) Oferta and doc. which accompany it are filed on-line signed with the extended electronic signature, under the sanction of rejection of the offer as unacceptable on the basis of art. 137 par. (2) lit. j) of the Decision no. 395/2016; 4) The modification of the procurement contract may be made on the basis of the provisions of art. 221 of the Public Procurement Law 98/2016, with modif. and completely. 5) The contract proposal will beafter determining the winning bid, with the data / information. which are further included in the offer, including the data of potential associates, subcontractors or third party supporters who will become a signatory to the contract with the ec operator. declared bidder, rightly winner. and bound. what do they get under the contract the assignment is initiated under c(which provides for the possibility of awarding a contr., according to the awarding document), reason for the award of the contract. who aut. contract. reserves the right to accept or reject any offer and / or to cancel the entire procedure. of attribute, in accordance with prev. Of Law no. 11/2018. Cl. suspension - Procedure. of attribute. is initiated under the scope of this clause. suspensive, meaning that the conclusion contract. publ. is a condition. by signing the contract. fine. with MDRAP (European Funds) or Identity. other sources of funding. Devic. Of Law no. 11/2018, authority. contract. accuracy. that I will end the contract with the offer. decl. the winner only in the measure. where the funds do not. purchase will be assig. by signing the contract. fine. with MDRAP. Where, indifferent. by reasone, contr. fine. with MDRAP will not sign, aut. contract. reserves Dr. to apply prev. Of Law no. 11/2018, upon receiving the notification from MDRAP regarding. to fine-tuning, being impossible. contract conclusion. pub purchase. Bidders in this procedure understand as auto. contract. and / or MDRAP can not be considered. liable for any damages in case of cancellation of the proceedings. ofattribute, indif. by its nature and indifferent. if aut. contract. and / or MDRAP have been notified of the existence. such damage. Bidders in this procedure accept use. condit. Special Suspension / Suspension Clause, Assuming Its Full Speak. in relation to the possible damage they may suffer in the site. described. If you proceed. are canceled, your biddersbe notified by aut. contracting. The suspension clause applies for a period of 8 months after the winner is established Internet address (URL): www.zalausj.ro
The bid deadline for Contract notice: Electric buses was 11 Mar 2019. Bidding is closed.
This tender has been issued by PRIM?RIA MUNICIPIULUI ZAL?U in Romania.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 34144910 - Electric buses, 30123100 - Ticket-validation machines, 31682540 - Substation equipment, 42961300 - Vehicle location system, 45232221 - Transformer substation, 71322500 - Engineering-design services for traffic installations.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 30468311. The purchaser document reference is 059554-2019.
This tender falls under Materials and Products, Computer Hardware and Software Services, Defence and Security, Technology and Equipment, Construction and Real Estate in Romania. Suppliers in these sectors can track similar Romania tenders using CPV-based alerts.