Contract notice: EBRD - Construction of Rail Tender - 25509488
Tender notice from Macedonia, published on 02 Aug 2018.
Executive Summary
The PUBLIC ENTERPRISE FOR RAILWAY INFRASTRUCTURE MACEDONIAN RAILWAYS - SKOPJE has issued a Tender notice for the procurement of a Contract notice: EBRD - Construction of Rail Corridor VIII, Second Section, Beljakovce Kriva Palanka and completion of remaining Works in the Macedonia. This Tender notice was published on 02 Aug 2018 and is scheduled to close on 26 Sep 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 25509488, while the tender notice number is 335598-2018 and Register on the platform.
Key facts
Summary
Contract notice: EBRD - Construction of Rail Corridor VIII, Second Section, Beljakovce Kriva Palanka and completion of remaining Works
Object of the contract EBRD - Construction of Rail Corridor VIII, Second Section, Beljakovce - Kriva Palanka and completion of remaining Works Description: Contract notice: EBRD - Construction of Rail Corridor VIII, Second Section, Beljakovce Kriva Palanka and completion of remaining Works Authority Type: Utilities entity Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Investment Bank, European Investment Fund, European Bank for Reconstruction and Development Award criteria: Not specified CPV code: 45234100, 50220000, CPV Description: Railway construction works. Repair, maintenance and associated services related to railways and other equipment. Procurement reference: 9191-PRE -44175. Project name: Rail Corridor VIII - Second Phase. Country: FYR Macedonia. Business sector: Transport. Project ID: OP - 44175. Funding source: EBRD. Type of contract: Works. Type of notice: Invitation for prequalification. Issue date: 27.7.2018. Closing date: 26.9.2018, 12:00 h local time. This invitation for prequalification follows the general procurement notice for this project which was published on the EBRD website, project procurement notices on 1.4.2016.. PE Macedonian Railways Infrastructure Skopje (PEMRI), hereinafter referred to as "the Client", intends using part of the proceeds of a loan from the European Bank for Reconstruction and Development, hereinafter referred to as "the Bank", towards the cost of Rail Corridor VIII, Second Section, Beljakovce Kriva Palanka.. The client intends prequalifying firms and consortia to tender for the following contract, hereinafter referred to as "the Contract", to be funded from part of the proceeds of the loan:. — Construction of new and the completion of remaining (pre-existing) works for a single track railway line between Beljakovce and Kriva Palanka, from km 30 + 957 to km 64 + 942, 01, which correspondence to an overall length of approximately 34 km, . — The works contract refers to:. Works on permanent way including railway superstructure and substructure, railway stations and halts, station and service buildings, earthworks, excavation of cuts and the formation of embankments, local road network, construction of railway bridges and tunnels, road overpasses and underpasses, culverts, retaining walls and other works, according to the design which is prepared by the employer.. — this project is noted as Phase 2 and is section of the Railway Corridor VIII, eastern part, connecting the Republic of Macedonia with the Republic of Bulgaria.. Prequalification and tendering for contracts to be financed with the proceeds of a loan from the bank is open to firms and joint ventures of firms from any country.. Prequalification documents may be obtained from the office at the address below upon payment of a non-refundable fee of EUR 100 or equivalent in a convertible currency.. Payments shall be made by bank transfer to the following accounts:. Payments in Foreign currency:. PE MR Infrastructure Skopje. NLB Tutunska Banka AD Skopje. Acc. No. 0070100047967. IBAN MK 07210701000479670. Swift address TUTN MK 22. Payments in Macedonian Denars:. JP MZ Infrastruktura Skopje. Acc. No. 210062528180135. Tax No 4030007643269. NLB Tutunska Banka AD Skopje. Upon receipt of appropriate evidence of payment of the non-refundable fee, the documents will promptly be dispatched by courier; however, no liability can be accepted for their loss or late delivery.. If requested, the documents can be dispatched electronically in PDF format.. The prequalification documents must be duly completed and delivered to the address below, on or before 26.9.2018, 12:00 h local time. Documents which are received late may be rejected and returned unopened.. Interested firms may obtain further information from, and inspect and acquire the prequalification documents at the following office:. . Internet address (URL):
The bid deadline for Contract notice: EBRD - Construction of Rail Corridor VIII, Second Section, Beljakovce Kriva Palanka and completion of remaining Works was 26 Sep 2018. Bidding is closed.
This tender has been issued by PUBLIC ENTERPRISE FOR RAILWAY INFRASTRUCTURE MACEDONIAN RAILWAYS - SKOPJE in Macedonia.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45234100 - Railway construction works, 50220000 - Repair, maintenance and associated services related to railways and other equipment.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 25509488. The purchaser document reference is 335598-2018.
This tender falls under Construction and Real Estate, Defence and Security in Macedonia. Suppliers in these sectors can track similar Macedonia tenders using CPV-based alerts.