Expired Tender Poland ICB TOT Ref. 40993773

Contract notice: District heating Tender in Poland - 40993773

Tender notice from Poland, published on 26 Feb 2020.

Executive Summary

The PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ has issued a Tender notice for the procurement of a Contract notice: District heating in the Poland. This Tender notice was published on 26 Feb 2020 and is scheduled to close on 30 Mar 2020, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 40993773, while the tender notice number is 095562-2020 and Register on the platform.

Key facts

Summary
Contract notice: District heating
TOT Ref. No.
40993773
Document Ref. No.
095562-2020
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
26 Feb 2020
Bid deadline
30 Mar 2020
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
District heating
Description: Contract notice: District heating
Authority Type: Utilities entity
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 09323000, 45332400, 45321000, 45311000, 45331000, 09323000, 45332400, 45321000, 45311000, 45331000
CPV Description: District heating.
Sanitary fixture installation work.
Thermal insulation work.
Electrical wiring and fitting work.
Heating, ventilation and air-conditioning installation work.
Liquidation of group heating node "B-2", "B-1" and " T-1 "in Tychy. Liquidation of group heating substations in Łaziska Gorne. Modernization of the heating system of the city of Tychy in 2018 2023
Reference Number: 4 / PN / NZ / II / 2020
Part I. Construction of 28 heat distribution centers at the B-2 estate in Tychy.
Main Site: Tychy
The scope of works related to the delivery, assembly and commissioning of the hubs includes, among others:
a) Delivery, assembly and commissioning: 28 substations (single-functional) in buildings in accordance with the design documentation.
B) Connection of the substation under construction with a high-parameter network, installed from the valveon a pre-insulated connection.
c) Connection of the substation under construction with the central heating installation. in the building.
d) Part of the low-parameter heating network running inside the building should be adapted to work as an internal installation through appropriate shut-offs, blinds in accordance with the design documentation and after obtaining the consent of the Supervision Inspector.
Note: Connection of manifolds inbuilding at ul. Bocheńskiego 13 with receiving installation
In the building at ul. Bocheńskiego 11 is carried out by the heat recipient.
E) Disassembly works in accordance with the design documentation.
F) Bringing downpipe drains near the sewage grate of the node room,
g) electrical installation in the node`s rooms in accordance with the design documentation.
H) Electrical installation rangein accordance with the conditions issued by the Distribution System Operator, as requested by the Employer.
i) Performing as-built electrical measurements and providing them to the Employer
In paper and electronic version in editable format.
j) Installing a counter board in a public place when agreed
With the Recipient heat and installation site supervision inspector.
k) Wyconcluding the technological diagram of the substation and its connection to the receiving installations in the building and providing it to the Employer in paper and electronic version in PDF format and an additional copy of the technological diagram
and the operating instructions after protection against moisture and dirt should be placed
in the substation`s room. Meaning of graphic symbols and numberThe technological diagram must be clearly described.
l) Collecting by the Contractor the documentation required to obtain a decision authorizing the operation of a pressure device, expansion vessel of the diaphragm of a given heat node, pursuant to -3 and -5 of the Regulation of the Ministry of Economy, Labor and Polityczna Społecznej
of July 9, 2003 (Journal of Laws No. 135, item 1269) inon technical conditions for the operation of certain pressure equipment and forwarding this documentation to the Employer.
In particular, the Contractor shall provide the Employer with 2 copies in paper form 1 copy
In electronic form in pdf format for each node:
Technical description of the pressure device submitted,
Documents specified in the provisions regarding the CE marking,
Construction drawing of the pressure device.
Installation diagram indicating the location of the pressure device, pressure safety accessories and supply sources,
Pressure equipment location plan, including the arrangement of adjacent devices,
Description of the selection of safety accessories and its documentation,
Pressure equipment operation instructions.
m) youthe contractor will be obliged to provide:
• substation commissioning report containing, in particular:
pressure expansion vessel setting,
flow rate, static pressure, result of leak test,
• operating instructions for heat substations and its components (1 copy in paper form, 1 copy in electronic form for each node),
• technical and operational documentation for each device installed in the node.
N) Thermal nodes should allow free access to technological devices for maintenance and operation.
Other order description in accordance with Chapter III point 2.3.1. a), 2.4 and item 3 to 9 of the ToR.
The Employer does not set a condition in this respect. The Contractor will meet the conditionnek, if it proves that:
a) It has current civil liability insurance in respect of its activities related to the subject of the contract for an amount not less than:
• for part I
PLN 1, 500, 000.00 (in words: one million five hundred thousand zlotys zero groszy) ),
• for part II
PLN 650, 000.00 (say: six hundred and fifty thousand zlotys zero groszy),
• for part III
1, 100, 000.00 PLN (in words: one million one hundred thousand zlotys zero groszy).
B) Has financial resources or creditworthiness in an amount not less than:
• for part I
PLN 1, 500, 000.00 (in words: one million five hundred thousand zlotys zero) grosze) or the equivalent of this amount in another currency.
• for part II
PLN 650, 000.00 (say: six hundred fifty thousand zlotys zero groszy) or the equivalent of this amount inother currency.
• for part III
PLN 1, 100, 000.00 (in words: one million one hundred thousand zlotys zero groszy) or the equivalent of this amount in another currency. in the proceedings, he will be requested to submit the following statements and documents (current as at the date of their submission):
1) Bank informationor cooperative savings and credit union, confirming the amount of financial resources or creditworthiness of the Contractor, not earlier than 1 month before the deadline for submitting bids.
2) Document confirming that the Contractor is insured against civil liability in the scope of conducted activity related to the subject orders for the sum of the bustlespecified by the Employer.
Grounds for exclusion:
1. The Purchaser will exclude the Contractor from the proceedings in the cases referred to in art. 24 paragraph 1 points 12-23 of the Public Procurement Law (grounds for mandatory exclusion), subject to the cases specified in art. 133 section 4 of the Public Procurement Law
2. The Employer will exclude the Contractor from the proceedings in the following cases provided for in art. 24 paragraph 5 point 1-2, Public Procurement Law (grounds for optional exclusion):
a) in relation to which liquidation was opened, the arrangement approved by the court in the restructuring proceedings provides for satisfaction of creditors by the liquidation of its assets or the court ordered the liquidation of its assets pursuant to art. 332 paragraph 1 of the Act of 15 May 2015. restructuring law (i.e. Journal of Laws 2019.243, as amended) orwhose bankruptcy was announced, with the exception of the Contractor, who after the declaration of bankruptcy concluded an arrangement approved by a final court decision, if the arrangement does not provide for satisfaction of creditors by the liquidation of the assets of the bankrupt, unless the court ordered the liquidation of his assets pursuant to art. 366 section 1 of the Act of February 28, 2003 on the bankruptcy law (i.e. Journal of Laws of 2019, 498, as amended), a culpable offense has seriously violated his professional duties, which undermines his integrity, in particular when the Contractor, as a result of the intended action or gross negligence, failed to perform or improperly performed the contract, which the Employer is able to demonstrate by means of appropriate evidence.
3. Contractor`s exclusion in the situation described in point 2. b) occurs if 3 years have not elapsed from the day afterthe existence of an event being the basis for exclusion.
1. In order to demonstrate the lack of grounds for exclusion, compliance with the conditions for participation in the procedure and the fulfillment of the Purchaser`s requirements by the offered supplies, the offer should be accompanied by the following current documents as at the date of submitting the offers:
1.1. EAT.
1.2 Obligation of another of the entity, in accordance with the template constituting Annex 3 to the ToR.
1.3 Proof will be broughtthe bid bond (for non-monetary forms).
2. To confirm the lack of grounds for exclusion referred to in art. 24 paragraph 1 point 23 of the Public Procurement Law, all Contractors who have submitted bids, submit, pursuant to art. 24 paragraph 11 of the Act (within 3 days from the date of placing by the Employer on the website information from the opening of offers), a declaration of belonging or not belongingto the same capital group as referred to in Article 24 para. 1 point 23 of the Public Procurement Law
3. The Contractor whose offer will be assessed as the most advantageous, in order to demonstrate the lack of grounds for exclusion from the procedure, will be invited to submit the following statements and documents (current as at the date of their submission):
3.1 Copy from the relevant register or from the Central Register and Information onEconomic Activity, if separate provisions require an entry in the register or the register, in order to confirm the absence of grounds for exclusion pursuant to art. 24 paragraph 5 point 1 of the Public Procurement Law
3.2. Information from the National Criminal Register in the scope specified in art. 24 paragraph 1 item 13, 14 and 21 of the Act, issued not earlier than 6 months before the deadline for submitting bids.
3.3. Contractor`s statements about bto issue a final court judgment against him or a final administrative decision on arrears in payment of taxes, fees or social security or health insurance contributions, or in the case of issuing such a judgment or a decision confirming the payment of such receivables together with any interest or fines or concluding a binding agreement in matter of repaymentt of these receivables.
3.4. Contractor`s declarations of no decision against him as a precautionary measure forbidding public procurement.
4. The Contractor whose offer will be assessed as the most advantageous, in order to demonstrate compliance with the conditions for participation in the proceedings and requirements will be invited to submit the following statements and documents (current as at the date of their submission):
4.1List of deliveries made, and in the case of periodic or continuous services also performed, within the last 3 years before the expiry of the time limit for submission of tenders, accompanied by proofs whether these deliveries have been made or are being carried out properly
4.2. Information of the bank or Cooperative Savings and Credit Union,
4.3.Document confirming that the Contractor is insured againstcivil liability in the scope of conducted activity,
4.4. The Employer does not require the submission of documents confirming that the offered deliveries meet the requirements specified by the Employer. The Contractor submitting the offer should indicate in Annex 4 to the ToR indicate producers of the heat substations offered and Annex 1 to the ToR to declare their compliance with the solutions described in the dockproject mentation and SETC.
5. In the procurement procedure, communication between the Employer and Contractors, in particular the submission of statements, requests, notifications, inquiries and transmission of information takes place electronically via the Purchaser`s Purchasing Platform and the "Send message" form available on the Platform`s website regarding the given procedure.
6. Dialthe best bid, the Employer will be guided by the criteria:
a) Price 99%.
b) Warranty period for the substation with all built-in devices 1%.
Internet address (URL): www.pec.tychy.pl

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: District heating was 30 Mar 2020. Bidding is closed.

This tender has been issued by PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 09323000 - District heating, 45332400 - Sanitary fixture installation work, 45321000 - Thermal insulation work, 45311000 - Electrical wiring and fitting work, 45331000 - Heating, ventilation and air-conditioning installation work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 40993773. The purchaser document reference is 095562-2020.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Power and Energy, Construction and Real Estate in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.