Object of the contractData-acquisition system
Description: Contract notice: Data-acquisition system
Authority Type: Body governed by public law
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 48614000, 38126000, 48614000, 38126000
CPV Description:
Surface observing apparatus.
Surface observing apparatus.
Surface observation apparatus for the aramlase and atalakulas processes.
Surveying of the Earth's surface material and energy source of the aramlase and atalakulas processes. Main Site: 2462 Martonvasar, Brunszvik u . 2.
6 columned sulylizimeter allomers, intravenous deposition and betanatel:
6 installs of TERENO compatible lithimeter columns and instrumentation at MTA ATK in Martonvasar site. 6 pcs, 2 m high, 1 m 2 unbound ground pillar, placed on a large herbaceous borehole, a better quenching boiler with soil moisture, soil heat and moisture potential sensors, a data collector (capable of treating the immersion enhancer), standard soil(eg collecting data collectors because of collecting data), and most commonly occurring errors and they can be used to show off the attendees as well as to showcase the system user's attention to maintenance.
Readily in the documentation.
If the cloud or the documentary-in all its points, the unequal and uncompromising boundaries of the coercive taxpayer have made it possible to distinguish a certain type of work, origin, type of thing, workmanship, act, person, or patent or vice versa, in any case it should be said that it is named only in the wise definition, and it should be done that-the term "or equivalent" is also included in it.
Kizaro Reasons:
There is no time-consuming, undervalued, and can not be claimed in a manner that is validly borne by an economic operator against whom the Section 62 (1) - (2) for the excluded reasons listed above.
Verification Mod:
The organization and / or persons responsible for the time-consuming and according to Section 65 (7) of the Kbt.when the time comes for the 321/2015. (X.30.) Government Decree II. In accordance with this Chapter, the Declaration in the One-Piece European Dealership Document (hereinafter referred to as EEKD) must state in advance that it does not belong to the Kb. Section 62 para. (1) and (2) are the domain of power. The EEKD shall be considered to be a certified member of the organization /-(Paragraph 3 (2) of the Government Decree) The time-limiter shall declare a probation that he will not claim to be a contender for the exclusionary reasons under - 62 (1) and (2) of the 62. - Koezoes In case of a timely event, the co-workers are required to submit an EEKD.
The non-Hungarian resident must provide a statement on the arroIn the legal system of the country in which he is resident, (1) and (2) of Article 62, which certificates correspond to and which bureaucrats or divisions are issued or exempted if, for a reason, in the legal system of the country in which they reside, a bribe or a sixth part does not extract an extract or proof of validity-Yes. (4) to (8) of Section 69 of the Act on the grounds of exclusion and suitability for the suitability of evidence for the purpose of the application of the provisions of Law 321/2015. (X.30.) Government Decree III. It must demonstrate that it does not fall within the scope of the justifications provided for in the justifications. (X.30.) Government Decree 1.-(3) to (5) of the Constitution. • In the case of a current lawsuit in progress, the submitter shall, for the time being, be accompanied by a letter of intent filed to the debtor and the proof of the debtor's receipt of the debt. In the absence of any alterna- tive entry in the case of the time-holder, a negative declaration(s) must be made for the present trial procedure, and the date (s) of the statement (s) must not be more than the date of the expiration of the summons of the summons.
The Provider refers explicitly to exclusionary grounds a 321/2015. (X.30.) Government Decree 1-16. --on.
1st Time-limiting (hereinafter referred to as "CA") does not endorse the Kb.-Section 75 (2) (e) shall apply. In the case of the application of the submitted time-consuming method, Article 76 (2) (c). Points range: 0-100 points. The Provider uses the Golden Speech Modes in each case of a brace.
3. The application must be accompanied by the Kbt. Section 66 (5) (AT) original arrowconcerning paragraph (2).
4. AT must state the information in the Tender Notice. Section 66 (4) and (6) and in the case of eligible economic operators, including the Kbt. Section 65 (7).
5. It shall be annexed to the AT and to the CIM / CIs or to the Heads ofthe times that gave you the time. If all the documents in question are not filed by the registrar, the undersigned must be accompanied by a duly authorized person. The mandate must also include the authorized subdivision.
6. In section III.1.2 and III.1.3 of the user's notes, the explanatory notes of the fitness instruc- tions and their verbatim statements are the most rigorous in the list of qualified ATs. AK is the winner-ATs (neither the Tesco nor the Non-Tested ATs) does not allow for a project balance sheet.
8. Koezoes quoted in the case of Kbt. Section 35 is iranyado. The consortium has to be attached to the application, which contains the full-time copy of the joint responsibility of the co-operative, the haters and the name of the time-keeper who is a member of the co-he or she can and will give you a powerful legal statement. Hianypotlas, please contact us. According to Section 71. AK does not assign a new hianypotlast if AT adds an economic actor who has not previously entered the time schedule, and the Hianypotlas order would be sluggish in view of the rules and the hianypotlas involved. All i(36 1 4010806) or by e-mail at
[email protected]). Please see the Kbt. Article 56 of the Constitution provides for iranians. All documents must be in Hungarian at all times. Foreign-language documents must also be included in the Hungarian translation. The CA accepts non-Hungarian documents AT ATit is responsible for the translation.
12. The timeframe must be accompanied by a technical and professional report on the basis of the document entitled "Technical Brochure", from which it is possible to read the corresponding texts in the given text / paper. the documentaries are quoted on a lower AT basisor the sub-algorithm named in the schedule must electronically fall off to the deadline of the time-limit. The document may be downloaded from www.apex-mm.hu by any of the affiliated companies. The following are the information given below:
Cegnev, Iranyitoszam, Varos (place), Street (ut, ter, koez etc.) and home, Adoszam, Switchphone, e-mail.
14. The offer was made in 1 original paper and in 1 piece of electronic media, for example. CD or DVD with a password, but not in a modosithato pdf file as explained in the documentation.
15. The date must be accompanied by a statement by AT that the electronic form has been submitted (you can read it in a password, but not modosithato in pdf format) is the same as the original (original) paper. In the case of a trip, the timing is based on the original print run.
Continue with VI.4.3. point
.
Internet address (URL): http://www.agrar.mta.hu
Directive: Classical Directive (2014/24/EU)