Tender notice from Romania, published on 31 May 2019.
Exeutive Summary
The COMPANIA NA?IONAL? „ADMINISTRA?IA PORTURILOR MARITIME” S.A. CONSTAN?A has issued a Tender notice for the procurement of a Contract notice: Consultative engineering and construction services in the Romania. This Tender notice was published on 31 May 2019 and is scheduled to close on 09 Jul 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 33468052, while the tender notice number is 254077-2019 and Register on the platform.
Key facts
Summary
Contract notice: Consultative engineering and construction services
Object of the contract Consultative engineering and construction services Description: Contract notice: Consultative engineering and construction services Authority Type: Utilities entity Contact Nature: Services Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 71310000, 71310000 CPV Description: Consultancy engineering and construction services. Consultancy and supervision services for the project "Modernization of the port infrastructure by ensuring the increase of the depths of the canals and basins [...] details on www.e-licitatie.ro Reference Number: 11062831/2019 / B50 The consultant will provide services for the supervision of the design and execution of the works, the designing period and the execution period of the works, as well as the duration of the guarantee period of the works, in order to achieve the objective "Modernization of the port infrastructure by ensuring the increase of the depths of the valleys and basins and the safety of navigation in the Port of Constanta". The Consultant will perform the role of "Supervisor" according to ConditiilContract for design and execution of works no. 44631 / 7.11.2018 of the Project "Modernization of the port infrastructure by increasing the depths of the seals and basins and the safety of navigation in Constanta Port" concluded in accordance with the General and specific conditions for the contracts for design and execution of works approved by GD No I of January 2018 The supervisor willensure the supervision and verification of the executed works and the activities performed by the contractor in order to certify their qualitative and quantitative compliance with the contract, the execution documentation and the Romanian technical and legal regulations in force. supervision and controlthe supervisor will ensure the monitoring, evaluation and, as the case may be, the orientation of the entrepreneur's activity, in order to execute the appropriate quality works, within the deadlines set and within the framework of the works, in order to avoid the occurrence of irregularities / nonconformities under construction during the works. the budget allocated. Because the design contract and ethe supervision to be supervised is in progress, in order to accomplish its tasks and duties, the supervisor will have the obligation to check all the documents issued from the start date of the design and execution contract and to insure on the site, throughout the execution of the works, specialist, which will permanently monitor the entrepreneur's activity. Consultant will ensure the technical and financial management of the contract - assuming the role of the "Supervisor" in the Works Contract (execution design) concluded with the designated contractor. The supervisor will also act during the warranty period of the works by preparing reports d Requirement 1:, the associated bidders, third parties and subcontractors must demonstrate that they are not foundin the situations stipulated in art. 177, 178 and 180 of Law no. 99 / 2016. Mode of performance: The economic operators participating in the awarding procedure (bidders, associate tenderers, third parties, subcontractors) will complete the DUAE with the information related to their situation as the first proof of non-compliance with the exclusion and fulfillment requirements capacity. Answersto the DUAE of the economic operators participating in the procedure will be filled in SEAP directly after each participant's authentication. For the cases where the bidder is an association of economic operators or for the cases where the bidder has subcontractors or third parties, each economic operator will log in the system and will access the award procedureinterest in completing the DUAE in the quality that it has been included in the procedure (Associate, Subcontractor, Third Party Support). Please observe the instructions in the NAPAA Notification of the Use of DUAE in the procedures conducted exclusively by electronic means of 8.4.2019 (available at www.anap.gov.ro), DUAE Completion Guide developed by ANAP (available on siteSEAP at "DUAE Information" section) The supporting documents proving the fulfillment of the assumed by completing the DUAE are to be submitted, at the request of the contracting entity, only by the tenderer placed on the first place in the intermediate rankings completed at the evaluation of the tenders. be: 1) certificates of absence of overdue debts(2) the criminal record of the economic operator and of the members of the management, management or supervisory body of the respective body economic operator or those who have power of representation, decision-making or control In this, as r(3) as the case may be, documents demonstrating that the economic operator may benefit from the derogations provided in art. 179 par. (2), art. 180 par. (2), art. 184 of Law 99/2016 on Public Procurement; 4) other editing documents, as the case may be. Requirement 2: The persons holding decision-making positions within C.N. AdmiMaritime Ports Management S.A. Constanta: - Daniela Serban - General Manager, Administrator, - Bogdan Pascu - Deputy General Manager, - Maria Mergiu - Economic Director, - Pepi Tanase Iulian - Chief of Legal and Contentious Affairs, - Ifimov Otilia -, - Sangeorzan Mihaela - Head of Office European Projects, - Crina Adina Popescu - Bir. Projects Europe, - Gămălan NicoAdina Chief of Office Preventive Financial Control, - Stoicescu Cristian Marius - Department of Public Procurement, - Patrichi Teodor - Director of Exploitation Department, - Hanganu Ciprian - coordinating director, - Tomescu Ion - Director of Technical Department Christmas Madalin Alexandru - Director of Commercial Direction, - Kiss Laszlo Eduard - Chief of Energetics Branch Port Constanta, - Daniel Niculescu - Chief SuConstanta, Constanta - Banias Emil Sorin - Chief of the Technical Ship Constanta Port, - Moldoveanu Antoniela - engineer, - Bola Laura Valentina - engineer, - Tivilichi Nicolae Dan - administrator, - Murgeanu Gabriela - - Naftali Daniel-Adrian - administrator, - Petrascu Elena - administrator, - Burlacu Mircea - administrator, - Batrinca Ghiorghe - Administrator Modalitthe following: The bidders / associates / third parties / the subcontractors participating in the award procedure must not find themselves in the situations stipulated in art. 73 of Law 99/2016. In this respect, with the submission of the DUAE, the participants will present a statement on their own [...] details on www.e-licitatie.ro - how to access the DUAE for completion by the operainterested economic entities are described in the NAPAA Notice on the Use of DUAE in the Procedures Performed exclusively by Electronic means of 8.4.2019 (available at www.anap.gov.ro), - the requests for clarifications of the potential bidders regarding the published award documentation and the answers to these will be addressed through SEAP, - the contracting entity will transmit the requestclarification countries on bids submitted through SEAP. The economic operators will submit the answers to the clarifications and any requested documents during the evaluation of the offers through SEAP, in the form of one or more separate signed documents / files with electronic signature, - if 2 or more bids are ranked on the first place, with equal scores, get awaythe secret will be done taking into account the score obtained at the sub-factors for the evaluation of the technical component, in descending order of their weight. If the application of this system does not result in a ranking of the bids in distinct positions in the ranking, the contracting entity will determine the final ranking according to the decreasing order of the score obtained for the factoIf the situation in which the equality continues, the contracting entity has the right to request new financial proposals and the winning bid will be the one with the lowest financial proposal, - an economic operator can not participate as a bidder / third party / subcontractor both for this acquisition of Consultancy and Supervision Servicesas well as for the acquisition of the Design and Execution Works of this investment objective, subject to the exclusion from the procedure. Internet address (URL): www.portofconstantza.com
The bid deadline for Contract notice: Consultative engineering and construction services was 09 Jul 2019. Bidding is closed.
This tender has been issued by COMPANIA NA?IONAL? „ADMINISTRA?IA PORTURILOR MARITIME” S.A. CONSTAN?A in Romania.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 71310000 - Consultative engineering and construction services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 33468052. The purchaser document reference is 254077-2019.