Expired Tender Poland ICB TOT Ref. 16188579

Contract notice: Construction works for power Tender - 16188579

Tender notice from Poland, published on 04 Sep 2017.

Executive Summary

The GMINA DASZYNA has issued a Tender notice for the procurement of a Contract notice: Construction works for power plants and heating plants in the Poland. This Tender notice was published on 04 Sep 2017 and is scheduled to close on 06 Oct 2017, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 16188579, while the tender notice number is 345978-2017 and Register on the platform.

Key facts

Summary
Contract notice: Construction works for power plants and heating plants
TOT Ref. No.
16188579
Document Ref. No.
345978-2017
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
04 Sep 2017
Bid deadline
06 Oct 2017
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction works for power plants and heating plants
Description: Contract notice: Construction works for power plants and heating plants
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45251000, 71320000, 45251000, 45210000, 45330000, 45331000, 45331110, 45310000, 45231400, 09323000, 45231100, 45251000, 71320000, 45210000, 45330000, 45331000, 45331110, 45310000, 45231400, 09323000, 45231100
CPV Description: Construction works for power plants and heating plants.
Engineering design services.
Building construction work.
Plumbing and sanitary works.
Heating, ventilation and air-conditioning installation work.
Boiler installation work.
Electrical installation work.
Construction work for electricity power lines.
District heating.
General construction work for pipelines.
Wykonanie w formule „zaprojektuj ibuild: design documentation and construction work on: "Dasin-fired thermal power station" Reference No.: PPI.271.5.2017
The subject of the order is execution of design and construction documentation: "The thermoelectric power station fired with straw Daszyn "performance of technical documentation and construction robot based on constructiona triple-generation complex with accompanying infrastructure;
Main Site: Daszyn.
The subject of the order is execution in the formula "design and build": design documentation and construction work on " CHP CHP plantexecution of technical documentation and construction work consisting in the construction of the triple-energy system together with the accompanying infrastructure, in accordance with the Utility Programs, hereinafter referred to as the PFU and the project documentation in part by the Ordering Party constituting an attachment to the SIWZ, including: a) CHP
Electric power of steam turbine min.-1.1 MW.
B) Passive biomass laboratory building
Building area 544.8 m
Usable floor area 767 m including light
Cubic capacity 2346.8 m
including: architectural and construction works, installation with measuring the building ; land development and development; building equipment. c) heating system of nets and nodesee
d) piping heating medium
1. Contractors may apply for the award of the contract, who:
1. They are not excluded from the public procurement procedure
2. Meet the conditions for participation in the proceedings. Description of how to assess the fulfillment of conditions for participation in the proceedings.
1) Possessing competence or authority to conduct a specific occupational activity, if-This is due to separate regulations.
The ordering party did not specify the requirements. List of statements submitted by the contractor for the purpose of preliminary confirmation that he is not subject to exclusion and meets the conditions for participation in the procedure:
Each bidder must enclose a current statement in the scope confirming fulfillment of the conditions for participation in the proceedings specified in Chapter 10 of the SETC, The contractor also submits the above statements in the form of a Single Document drawn up in accordance with the standard form set out in the European Commission Implementing Regulation issued pursuant to Art. 59 sec. 2 of Directive 2014/24 / EU and Art. 80 sec. 3 of Directive 2014/25 / EU, ie the Single European DockThe Order (JEDZ) constituting an attachment to the SIWZ
The contractor, who relies on the resources of other entities, in order to demonstrate the absence of grounds for exclusion and fulfillment, to the extent it refers to their resources, the conditions of participation in the proceedings shall also be submitted by the JEDZ concerning these entities. It also deals with the original offer of the obligations of these entities to give it to-The requisite resources for the execution of the order.
The contractor who intends to subcontract the subcontractors to indicate the absence of a basis for the exclusion from participation in the proceedings, Subcontractors.
In case of joint application by contractors for the order. Single European Procurement Document, -These documents confirm the fulfillment of the conditions for participation in the procedure and lack of grounds for exclusion from the proceedings in the scope in which each of the contractors demonstrates the fulfillment of conditions for participation in the procedure and lack of grounds for exclusion from the proceedings. The fulfillment of the condition is required to be demonstratedie: having at least 20, 000, 000 PLN (in words: twenty million Polish zloty) of financial means or creditworthiness; annual turnover of not less than 20, 000, 000 PLN in each of the last 3 financial years; reduced for this period
the Contractor's paid insurance against civil liability in the field of conducted businessThe award of the above mentioned conditions will be based on the information contained in the documents and statements detailed in Chapter 11 of the SETCPP. The contents of the enclosed documents must clearly show that the above conditions of the Contractor fulfilled. If you do not submit allRequired documents in the SIWZ, the Contractor will be called to supplement them, unless, despite their completion, the Contractor's bid would be rejected or the procedure would have to be canceled. In proceedings, you should submit:
1information from the National Criminal Register within the scope defined in art. 24 sec. 1 pt. ac 14 (this does not apply to the person referred to in this provision if convicted for the offense listed in Article 24 (1) (13) (d) of the Public Procurement Law) and 21 of the Act and, as regards the conviction for a misdemeanor penalty of detention, to the extent specified by the contracting authority pursuant to art. 24 ust. 5, 5 and 6 of the Act, issued not earlier than 6 months prior to the deadline for submitting bids or requests to participate in the proceedings; 2) the certificate of the competent head of the tax office confirming that the contractor is not in arrears with the tax paid, earlier than 3 months prior to the deadline for submitting bids or applications for admissionin proceedings, or other document confirming that the contractor has entered into an agreement with the competent tax authority on the repayment of these receivables with possible interest or fines, in particular obtained the exemption provided for by law, postponing or spreading over installment payments or stopping the execution of the decision of the competent authority in its entirety ; 3) certificate of proper terea new organizational unit of the Social Insurance Institution or the Agricultural Social Insurance Fund or other document confirming that the contractor is not in arrears with the payment of social insurance or health insurance contributions issued not earlier than 3 months before the deadline for the submission of tenders or requests to participate in the proceedings; another document will confirmassuming that the contractor has entered into an agreement with the competent authority on the repayment of these duties together with possible interest or fines, in particular obtained the legal exemption, postponement or spreading into installments of overdue payments or stopping the execution of the decision of the competent authority in its entirety; registry or from the central records and activity informationeconomic, if separate regulations require entry in the register or records, in order to confirm lack of grounds for exclusion under Art. 24 sec. 5) declaration of the contractor about not paying taxes and local charges, referred to in the Act of 12 January 1991 on local taxes and charges (Journal of Laws of 2016, item 716)
6) declaration of contractor's affiliationor lack of belonging to the same capital group; In the case of belonging to the same capital group, the contractor may provide evidence that links to another contractor do not lead to distortion of competition. According to art. 24 sec. 11 of the Public Works Act, the contractor shall provide the contracting authority with a declaration of belonging or not belonging to the same group of thethe one referred to in paragraph 1 pt. 23 of the Public Prosecutor's Act within 3 days of the date of the information referred to in art. 51 sec. 1a, art. 57 sec. 1 or art. 60 d sec. 1 or from posting on the website of the information referred to in art. 86 sec. 5.
7) the statement of the contractor's failure to pass a final sentence of conviction for the offense of limitation of liberty or fines forthe limit specified by the contracting authority pursuant to art. 24 sec.
8) the contractor's declaration of lack of judgment against him as a precautionary measure against the prohibition of applying for a public contract; 9) statement of the contractor not to issue a final administrative decision against him regarding the violation of the obligations resulting from the labor law, environmental protection or psocial security treaties to the extent specified by the contracting authority pursuant to art. 24 sec. Evaluation of the fulfillment of the aforementioned conditions will be based on the information contained in the documents and statements detailed in Chapter 11 of the SETCPP.
Internet address (URL): http://daszyna.bip.cc
Directive: Classical Directive (2014/25/EU)

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction works for power plants and heating plants was 06 Oct 2017. Bidding is closed.

This tender has been issued by GMINA DASZYNA in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45251000 - Construction works for power plants and heating plants, 71320000 - Engineering design services, 45210000 - Building construction work, 45330000 - Plumbing and sanitary works, 45331000 - Heating, ventilation and air-conditioning installation work, 45331110 - Boiler installation work, 45310000 - Electrical installation work, 45231400 - Construction work for electricity power lines, 09323000 - District heating, 45231100 - General construction work for pipelines.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 16188579. The purchaser document reference is 345978-2017.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate, Power and Energy in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.