Expired Tender Poland ICB TOT Ref. 42444806

Contract notice: Construction work for waterways Tender - 42444806

Tender notice from Poland, published on 24 Apr 2020.

Executive Summary

The DYREKTOR URZĘDU MORSKIEGO W GDYNI has issued a Tender notice for the procurement of a Contract notice: Construction work for waterways in the Poland. This Tender notice was published on 24 Apr 2020 and is scheduled to close on 22 Jun 2020, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 42444806, while the tender notice number is 190004-2020 and Register on the platform.

Key facts

Summary
Contract notice: Construction work for waterways
TOT Ref. No.
42444806
Document Ref. No.
190004-2020
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
24 Apr 2020
Bid deadline
22 Jun 2020
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work for waterways
Description: Contract notice: Construction work for waterways
Authority Type: Ministry or any other national or federal authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45247100, 45100000, 45200000, 45221100, 45233120, 45500000, 45240000, 90523100, 45247100, 45100000, 45200000, 45221100, 45233120, 45500000, 45240000, 90523100
CPV Description: Construction work for waterways.
Site preparation work.
Works for complete or part construction and civil engineering work.
Construction work for bridges.
Road construction works.
Hire of construction and civil engineering machinery and equipment with operator.
Construction work for water projects.
Weapons and ammunition disposal services.
Wykonanie robot budowlanych w ramach projektu pn. „Budowaof the waterway connecting the Vistula Lagoon with the Gulf of Gdańsk part II "
Reference Number: ZP.371.13.2020.ASc
1. The subject of the contract is the execution of construction works under the project" Construction of the waterway connecting the Vistula Lagoon with the Gulf of Gdańsk part II ".
Main Site: Water track on the Elbląg River, POLAND.
I. The subject of this contract, which is part II of the project, includes the implementation of:
-construction of the existing fairway on the Elbląg River over a section of about 10.4 km and track width measured at the bottom on the river 60 m and 40 m in the Nowak-w region in the area of the banks of the banks,
- a swing bridge over the Elbląg River, in Nowakowo, at a distance about 650 m south of the existing pontoon bridge. Technical parameters of the swing bridge for the designed road systemit and the fairway on the Elbląg River include: 104.3 m length, span width 2 x 51.5 m, total width approx. 17.2 m and construction height 1.9 m to 4 m,
- a new section of the poviat road along the west bank of the Elbląg River (road class Z) with a pedestrian-bicycle path, pavement and side road, as well as access roads to service real estate (road class O) with roadsideland em. The total length of planned roads will be about 1.55 km.
II. The said order is implemented using the provisions of the Act of 24 February 2017 on investments in the construction of a waterway connecting the Vistula Lagoon with the Gulf of Gdańsk (i.e. Journal of Laws 2019, item 1073).
III. The contractor is obliged to carry out the contract on the terms and conditions described in the model contract pannexing Annex 5 to the ToR.
IV. If the design documentation or technical specification of the execution and acceptance of the robot describes materials or devices by providing their manufacturer`s name, patents or origin, then in relation to these materials or devices, the contracting authority allows the inclusion in the offer and then the use of other equivalent materials or devices underthe condition that they have parameters not worse than the materials or devices they replace. In such a situation, the contracting authority requires the submission of relevant documents confirming these materials or devices. If in the design documentation, technical specifications of the execution and acceptance of the robot or bill of quantities of the robot there are possibly indications of trademarks, patents, walking, a source or a specific process that characterizes a product supplied by a specific contractor, they define the minimum quality standard for the materials or devices used for the valuation. The contracting authority allows the contractor to offer equivalent materials and devices with parameters not worse than required. The materials and devices offered must be equivalent asas specified in the Specification of Essential Terms of Order (SIWZ). The burden of proving the equivalence of the offered item lies with the contractor (pursuant to Article 30 (5) of the PPL). In the event of any doubts regarding the equivalence of the products offered, the contracting authority shall request the contractor to submit explanations regarding the content of the offer within the specified time.
V. In accordance with art. 30 paragraph 5 of the Act, the contracting authority allows contractors to apply solutions that are equivalent to those described in this ToR. The Contractor, who in the offer refers to the use of equivalent solutions, is obliged to demonstrate in the offer that the solutions offered by him meet the requirements specified by the contracting authority.
VI. The awarding entity envisages the possibility of awarding the contracts referred to inand in art. 67 section 1 point 6 involving the implementation of the same type of robot as covered by the scope of the contract. The value of possible orders in the above scope may be awarded up to 10% of the Gross Bid Price.
VII. The contracting authority requires the contractor or subcontractor to employ persons referred to in Clause 6.1.1 of the SWK of the model contract based on the employment contract as Annex nr 5 to SIWZ.
1. The contractor may not be excluded from the procedure pursuant to art. 24 paragraph 1 of the Public Procurement Law and art. 24 paragraph 5 points 1), 2), 3), 4 and 8) of the Public Procurement Law
2. Each contractor must attach to the offer a valid statement as at the date of submission of the form in the form of the Single European Order Document, hereinafter referred to as the Single Document (hereinafter: "EAT", "Single Document") drawn up in accordance withwith a template of the standard form specified in the European Commission implementing regulation issued on the basis of art. 59 clause 2 of Directive 2014/24 / EU. The information contained in the single document constitutes preliminary confirmation that the contractor is not subject to exclusion and meets the conditions for participation in the procedure. Proper (evidentiary) verification of compliance with the conditions specified by the contracting authoritythe procedure will be based on the relevant documents submitted by the contractor, whose tender will be assessed the highest, at the request of the contracting authority (Article 26 (1) of the Public Procurement Law).
The uniform document pre-prepared by the contracting authority for the said procedure is available on the platform at : https://umgdy.ezamawiacy.pl (Annex 2 to the ToR).
3. In the case ofof contractors applying for the contract, the declaration referred to in item 1 is submitted by each of the contractors jointly applying for the contract. This statement is intended to confirm that the conditions for participation in the procedure have been met to the extent that each of the contractors demonstrates that they have met the conditions for participation in the procedure and that there are no grounds for exclusion.
4. Contractor who intends to entrust execution with partthese subcontracts are required to complete Part II Section "D" EAT and indicate the parts of the contract which they intend to entrust to subcontractors and, if known, to provide subcontractors` companies.
5. Contractor who refers to the resources of other entities in order to demonstrating that there are no grounds for exclusion or fulfillment in so far as he refers to themthe resources of the conditions for participation in the procedure are also submitted by the declaration referred to in item 1 regarding these entities in the form of a Single European Order Document, signed by an electronic signature qualified by persons authorized to represent the entity.
6. The contractor may limit himself to completing the alpha section of Part IV of the EAT form. Thus, the contractor does not have tocomply with any of the other sections of Part IV of the form regarding eligibility criteria, and the proper (evidentiary) verification of compliance with specific conditions specified by the contracting authority for participation in the procedure, the contracting authority will, as a rule, at the end of the procedure, based on the relevant documents submitted by the contractor whose offer was rated highest on call(Article 26 (1) of the Public Procurement Law).
The contractor must show that:
1) he is insured against civil liability in the scope of his business activity related to the subject of the contract, for a guarantee sum of not less than PLN 50, 000, 000 (in words : fifty million);
2) has financial resources or creditworthiness of not less than PLN 50, 000, 000 (in words: fiftymillion));
In the case of contractors jointly applying for the award of the contract, the above condition will be deemed met if the contractors demonstrate their fulfillment jointly or separately. 1. Documents and statements confirming the absence of grounds for exclusion pursuant to Article 24 (1).1 and para. 5 of the Public Procurement Law:
1) information from the National Criminal Record in the scope specified in art. 24 paragraph 1 item 13, 14 and 21 of the Public Procurement Law, issued not earlier than 6 months before the deadline for submission of bids;
2) an excerpt from the relevant register or from the Central Register and Information on Economic Activity, if separate provisions require an entry in the register or a record in to confirm bcancellation grounds for exclusion under art. 24 paragraph 5 point 1 of the Pzp Act;
3) a certificate from the competent head of the tax office (Article 24 (5) point 8 of the Pzp Act) confirming that the contractor is not in arrears with tax payments, issued not earlier than 3 months before the deadline for submitting bids or applications for admission to the proceedings or other supporting documentthat the contractor has entered into an agreement with the competent tax authority on the repayment of these receivables together with any interest or fines, in particular, he obtained the exemption, deferment or installment of overdue payments in installments or withholding in full the execution of the decision of the competent authority;
4) the appropriate field certificate organizational unit of Zakład Ubezpieczeń Sppensions or Kasa Rolniczego Ubezpieczenia Społecznego (Agricultural Social Insurance Fund) or another document confirming (Article 24 (5) (8) of the Public Procurement Law) that the contractor is not in arrears with payment of social security or health insurance contributions, issued not earlier than 3 months before the deadline for submitting offers or applications for admission to the proceedings or other document confirming thatthe lawyer entered into an agreement with the competent authority regarding the repayment of these claims together with any interest or fines, in particular, he obtained the exemption, deferral or installment of overdue payments as provided for by law, or withheld in full the execution of the decision of the competent authority;
5) the contractor`s declaration of no issue to a final court judgment or final decision adMinister on arrears with the payment of taxes, fees or social security or health insurance contributions or in the event of the issuance of such a judgment or a decision of documents confirming the payment of these claims together with any interest or fines or the conclusion of a binding agreement on the repayment of these claims;
6) statement of the contractor of no judgment against himas a precautionary measure the prohibition of applying for public procurement;
7) declaration of the contractor about not being in default of paying local taxes and fees, referred to in the Act of 12 January 1991 on local taxes and fees (Journal of Laws of 2016 item 716);
2. In chapter VI point 9 12 of the Terms of Reference indicated information on documents of foreign contractors.
3. In the case of joint contractorse applicants for the award of the contract, the conditions referred to in points V1.2 and V.1.3 of the ToR will be met if the contractors demonstrate their fulfillment jointly or separately.
4. The Employer requests the submission of a price form (Annex 1a to the ToR) and cost estimates prepared on the basis of the design documentation, OPZ and bills of quantities constituting attachments to the ToR.
5. order theprovides for the procedure described in art. 24aa of the Public Procurement Law
6. The contractor whose offer is selected will be required to provide a security on due performance of the contract at the latest on the day of its conclusion, in the amount of 5% of the total gross price specified in the offer.
Internet address (URL): www.umgdy.gov.pl

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work for waterways was 22 Jun 2020. Bidding is closed.

This tender has been issued by DYREKTOR URZĘDU MORSKIEGO W GDYNI in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45247100 - Construction work for waterways, 45100000 - Site preparation work, 45200000 - Works for complete or part construction and civil engineering work, 45221100 - Construction work for bridges, 45233120 - Road construction works, 45500000 - Hire of construction and civil engineering machinery and equipment with operator, 45240000 - Construction work for water projects, 90523100 - Weapons and ammunition disposal services.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 42444806. The purchaser document reference is 190004-2020.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.