Expired Tender Belgium ICB TOT Ref. 14455676

Contract notice: Construction work for water Tender - 14455676

Tender notice from Belgium, published on 29 Jun 2017.

Executive Summary

The AFDELING BOVENSCHELDE has issued a Tender notice for the procurement of a Contract notice: Construction work for water projects in the Belgium. This Tender notice was published on 29 Jun 2017 and is scheduled to close on 18 Sep 2017, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 14455676, while the tender notice number is 247783-2017 and Register on the platform.

Key facts

Summary
Contract notice: Construction work for water projects
TOT Ref. No.
14455676
Document Ref. No.
247783-2017
Country
Belgium
Notice type
Tender
Competition
ICB
Publication date
29 Jun 2017
Bid deadline
18 Sep 2017
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work for water projects
Description: Contract notice: Construction work for water projects
Authority Type: Body governed by public law
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 45240000, 45240000
CPV Description: Seine-Schelde. Building a Vb lock on the Leie at Sint-Baafs-Vijve.
Construction work for water projects.
The project is part of the European inland waterway project Seine-Schelde. This project aims at the realization, within a European context, of a large gabarite inland shipping (Pushbuttons and Couplings CEMT Class Vb with width 11.4 m, Length 185 m and 3.5 m Draft) between theSeinebekken on the one hand and the Scheldt bay and the North Sea ports on the other.
The mission is situated between the N357 highway and the mouth of the Mandel and includes the following works:
- Realization of a new VB lock with associated infrastructure (except for the ports).
- Breakdown of existing lock with associated infrastructure.
- Floor of the Lease within the project area tOt a minimum water depth of 4.5 m in relation to the nominal level.
- Adaptation of existing quay walls and banks on the channeled Lead within the project area (between the N357 highway and the Mandel estuary) according to the changed ground level.
Building the forecourt For the Vb lock, building the quay wall at the company Leiefvoeders, building the quay wall upwardsThe existing lock, building the shore defense on the tip of the island of D'Hooie and building a local operating building does not belong to the current assignment.
For information purposes only, the scope and plans of building the forecourt for the Vb lock, building the quay wall at the company Leiefvoeders, building the quay wall up the existing lock and the bOwls of the riverside defense on the tip of the D'Hooie island attached.
The continued operation of the existing Va lock must be guaranteed as long as the new Vb lock has not been put into service.
According to the CPV classification These works relate to:
31720000-9: Electromechanical Equipment
44212383-7: Door Locks
45000000-7: Construction Works
45200000-9: VoLumber or partial construction and civil engineering activities
45240000-1: Water works
45243600-8: Building of walls
45248100-8: Construction of ducts
45252124-3: Dredging and pumping works
The works include (not necessary in this Ordering):
- Setting up the site (eg closing the yard area by means of a temporary fence, the construction, -Maintenance and lighting of signaling both for road and shipping traffic, drafting of the set of directives and attitudes, construction of a site, ...); - removing all plant growth in the yard area (bushes and their root frame, Grassy seeds, trees and their root, ...), shrugging the shore, building the necessary areas;
- breaking outOne of the existing bankruptcy and quay walls (partly underwater) and attitudes. A portion of the shore defense has already been broken up for the works at the forecourt and for the work on the quay wall and shore defense on the right bank up the current lock. Breaking the remains of the shore defense in these zones also belongs to the current assignmentT -
Breaking the remaining hunting path into the area of work;
- Breaking out the remaining part of the existing siphon;
- Breaking the existing lock (only after commissioning of the new lock and after building Of the property divestment) and attitudes, including service building and portico;
- Removal of all degradation material outside the domain of the contracting authority- To carry out the necessary groundwork, excavations and, in addition, to carry out, with due observance of all applicable laws and regulations, of all surplus specimens outside the building site;
- To provide studies and plans by the contractor ;
- Performing probes;
- Monitoring of settlements, displacements, vibrations and water levels;
- Building a new sLuis (including door locks and electromechanical equipment) and attitudes (eg locking plate, crane plateau, cable boiler, ...); - building steel steering works;
building security guards (steel pipe piles); - building new quay walls and river defense (Type of "single-row pile wall pile walls" and cheese cavities of the type "Danish quay wall") -
Building- To build a temporary quay wall of the type of "single-row pile of pile walls" next to the existing sluice;
- To modify the existing quay wall at the company Depla, just down the shore on the right bank;
- Placing of dams;
- Performing of concrete works (eg splints, floors, ...);
- Placing of ground anchors;
- Placing of treks- To carry out the necessary suitability and acceptance tests on the ground anchors;
- The provision of equipment and attitudes such as ballers, ladders, shrimps, etc. -
Connecting the new to the existing condition;
- The construction of A new hike path;
- dredging of the water bottom and decrease of the species;
- laying of a soil protection consisting of penet
- Temporary constructions, excavations and additions necessary for the realization of the above-mentioned constructions, including the necessary paintings and drainages;
- Clearance of the yard;
- Sowing of grass bushes;
- Planting trees;
- Maintenance of the works during the warranty period
Maintenance of the control of the installations after the guarantee periodThe
...
All performance and deliveries that are required for the proper execution of the assignment, but not explicitly stated in the summary survey, are supposed to be contained in the mentioned sections or are obligatory, as a result of the Adoption, to be carried out.
They can not be a pretext for price reward or for compensation.
For the faithBale phasing of the works is referred to the plans ...
This assignment concerns an assignment in the following fixed and conditional parts:
- Part of the course: Preparatory work, construction of the new lock with associated infrastructure and environmental installation. Maintenance of the section of construction (including steel construction) from the commissioning of the new lock to the provisional deliveryof the work constitutes a part of this sub-assignment.
The maintenance during the warranty period of the building construction section is also part of this sub-assignment. This service will commence on the date of provisional acceptance and ending on the date of final acceptance
- Conditional Part. 1: Stabilization of the existing VA-lock and move downstream aanmeerpalen
- VComparable part 2: Supply and installation of the electromechanical equipment of the sluice complex. Maintenance from the commissioning of the new lock to the provisional completion of the work within this conditional part forms part of this subcontract.
Maintenance during the warranty period of the Electromechanical Equipment section is part of diT conditional share. This maintenance takes place on the date of the final delivery and ends on the date of final delivery.
- Conditional part 3: Construction and installation of the lock doors
- Conditional part 4: Floor of the Ley and land protection on the left bank
- Conditional Part 5: Construction of the guiding works and fuik upwards
- Conditionally part 6: Construction of kaaimHourly Lead Feeds and Shore Defense Downward Lead Feeds
- Conditional Part 7: Adjustment of Quay Depla Depla Va-sluis
- Conditional Part 8: Construction of watering and quay wall at existing slope and demolition existing lock with associated infrastructure
- Conditional part 9: Construction of The guiding works and fuik downwards
- Conditional part 10: Floor of the Leie and onLay soil protection on right bank
- Conditional part 11: Remote control station
- Conditionally part 12: Maintenance after the warranty period. This part relies on the date of the final delivery of conditional part 2. After the warranty period, maintenance only relates to the control of the installations, ie hardware and software (including application softwareAre) of the central and local control and monitoring units and operating stations and all associated communications and networking equipment. The duration of this conditional part is 5 years. The contractor has no exclusive rights during the term of the contract. The contracting authority has the right to appoint a third contractor for performance during the term of the contract-Contained in this assignment.
Maintenance during the guarantee period is an integral part of the adoption (fixed part and conditional part 2).
The split in fixed and conditional parts is motivated for budgetary reasons.
In assessing The subscription price is always considered as the full offer (all fixed and conditional parts)
The terms of application apply to all parts.
See specifications. - See tender.
By subscribing to this contract, the tenderer declares himself not to be in a state of exclusion as referred to in Art. 61.
The following documents must be added to the tender:
- for all tenderers: an extract from the criminal record or an equivalent documentIssued by a judicial authority or public authority of the country of origin or provenance and showing that the person concerned has not been convicted of an offense referred to in Article 61, -1 and -2 KB Placement; - for the Belgian tenderer who employs staff Subject to the social security legislation of another Member State of the European Union: a certificate that-Issued by the competent authority confirming that, on the expiry of the closing date for receipt of the tender, he has fulfilled the rules on payment of social security contributions in accordance with the statutory Provisions of the country in which he is established; - and in addition to foreignersWriters:
- An original certificate issued by the competent public authority of the country in which he is established and shows that he has complied with the social security contributions pursuant to Article 62, -2 KB Placement; - A certificate of not Bankruptcy issued by the competent public authority of the country concerned; - a certificate issuedKt by the competent government agency which shows that the person concerned is in charge of paying his taxes (direct tax and VAT).
The certificates are not older than three months from the date of opening of tenders.
Internet address (URL): www.wenz.be
Directive: Classical Directive (2004/18/EC)

Documents

Tender Notice
Login to view

Similar tenders

Belgium Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work for water projects was 18 Sep 2017. Bidding is closed.

This tender has been issued by AFDELING BOVENSCHELDE in Belgium.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45240000 - Construction work for water projects.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 14455676. The purchaser document reference is 247783-2017.