Contract notice: Construction work for water Tender - 34714697
Tender notice from Poland, published on 16 Jul 2019.
Exeutive Summary
The SKARB PA?STWA, PA?STWOWE GOSPODARSTWO LE?NE LASY PA?STWOWE, NADLE?NICTWO ORNETA has issued a Tender notice for the procurement of a Contract notice: Construction work for water projects in the Poland. This Tender notice was published on 16 Jul 2019 and is scheduled to close on 26 Aug 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 34714697, while the tender notice number is 330886-2019 and Register on the platform.
Key facts
Summary
Contract notice: Construction work for water projects
Object of the contract Construction work for water projects Description: Contract notice: Construction work for water projects Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45240000, 45246200, 45248000, 45100000, 45110000, 45111000, 45112100, 45112700, 45240000, 45246200, 45248000, 45100000, 45110000, 45111000, 45112100, 45112700 CPV Description: Construction work for water projects. Riverbank protection works. Construction work for hydro-mechanical structures. Site preparation work. Building demolition and wrecking work and earthmoving work. Demolition, site preparation and clearance work. Trench-digging work. Landscaping work. „Modernizacja zbiornika retencyjnego Migny" Reference Number : SA.270.3.2019 Przedmiotem zamowienia są roboty buDowlane consisting in the reconstruction of the existing reservoir by forming a canopy, giving a uniform slope of the bottom, making a gentle slope of the reservoir from the east, rebuilding the existing reservoir dam, building a stilling and bleeding structure in the form of a concrete monk with a footbridge and a deck chair, strengthening the ditch that discharges water from the reservoir stone in Mingajnyon the plot: 3232/4, Mingajny area, in accordance with the conditions of the building permit included in the decision Starosta Lidzbarskiego nr Or / 30/2019 of 1.2.2019 r. sign spr. BiA.6740.349.2018 on the approval of a construction project and granting a building permit. Main Site: Administrative area of the Orneta Forest District - Forestry Migny, plot: 3232/4, Mingajny village, Mingajna area, commune Orneta, communeat lidzbarski, wojewodztwo warmińsko-mazurskie. The subject of the order is construction works consisting in the reconstruction of the existing reservoir by forming a canopy, giving a uniform slope of the bottom, making a gentle slope of the reservoir from the east, rebuilding the existing reservoir barrier, building a still-edged structure in the form of a monk concrete with footbridge and deck chair, strengtheningditch discharging water from the reservoir with stone throw in the village of Mingajny on plot: 3232/4, Mingajny area, in accordance with the building permit conditions contained in the decision Starosta Lidzbarskiego nr Or / 30/2019 of 1.2.2019 r. BiA.6740.349.2018 on the approval of the construction design and the granting of the building permit. - The reconstruction of the facility must guarantee water retention in the quantity13, 000 m. - The contractor, before submitting the subject of the contract for final acceptance, is obliged to carry out the as-built surveying inventory at his own expense, perform technical inspections, necessary tests and measurements by authorized bodies. In addition, the contractor undertakes to submit approvals, technical approvals, declarations of conformity for embedded materials, equipment and officezenia in accordance with the as-built inventory. - The Contractor undertakes to prepare documents for final acceptance together with the assembly survey, including, among others: a set of approvals, approvals, certificates and compliance declarations for embedded materials, all test and check protocols signed by the robot manager and inspector of investor's supervisionthe design documentation, technical specification of performance and acceptance of construction works and the robot's excess (Annex No. 10 to the ToR). The subject of the orders should be carried out in accordance with the permits, project documentation, technical specification of performance and acceptance of the robot (Annex 10 to the ToR) and in accordance z SIWZ, with the offer submitted and in accordance with the contract. The subject of the order should be made fromrefer to the principles of technical and building knowledge, applicable laws and standards, and in accordance with the "Project implementation guide Guidelines for tasks and facilities for small retention and counteracting water erosion" (Annex 9 to the ToR). Note: In the case of updating a manual about which referred to above, the Ordering Party undertakes to inform the Contractor about the changes madeand the Contractor undertakes to take into account and comply with the provisions of the new version of the manual. The Employer does not set specific requirements for the description of compliance with the condition of participation in the proceedings regarding competences or entitlements to conduct a specific professional activity. List of declarations or documents 1/4 In order to confirmation of the lack of grounds for exclusion from the proceedings for whichreferred to in item 6.1 and in order to confirm compliance with the conditions for participation in the proceedings, referred to in item 6.2. The Contractor will be obliged to provide the Employer with the following statements and documents: - a) a Contractor's statement valid as of the day of submitting bids constituting preliminary confirmation of compliance with the conditions for participation in the procedure set out in this ToR and no grounds for exclusionia, submitted on the form of a single European order document (hereinafter referred to as "EAT"), model provided for in the Commission Implementing Regulation (EU) 2016/7 of 5.1.2016 laying down a standard form for a single European order document (OJ EU series L 2016 r. 3, p. 16). EAT should be submitted together with the offer. EAT The Contractor prepares, under pain of nullity, in the form of(b) a list of persons referred by the contractor for the performance of the public contract, in particular those responsible for the provision of services, including information on their professional qualifications, qualifications (if required), education (in relation to supervisors) necessary to perform the public order, and alsoe of the scope of activities performed by them and information about the basis for disposal (model list of persons referred by the contractor for the implementation of the order is attached as Annex 6 to the ToR); c) excerpt from the relevant register or from central records and business information, if separate regulations require an entry in the register or records, in order to confirm the absence of exclusion groundsbased on art. 24 sec. 5 point 1 Pzp; d) certificate of the competent head of the tax office confirming that the contractor is not in arrears with taxes, issued no earlier than 3 months before the deadline for submission of tenders or other document confirming that the contractor has concluded an agreement with the competent tax authority regarding repayments these receivables along with any interestand / or fines, in particular obtaining legally required exemption, postponement or payment of overdue payments or stopping in full the decision of the competent authority; e) a certificate from the relevant organizational unit of the Social Insurance Institution or the Agricultural Social Insurance Fund or other document confirming that the contractor he is not in arrearsm social or health insurance premiums, issued no earlier than 3 months before the deadline for submission of tenders or other document confirming that the contractor has concluded an agreement with the competent authority regarding repayment of such receivables with possible interest or fines, in particular obtained the legally required exemption, postponing or spreading overdue payments into installmentsor (f) information from the National Criminal Record in the scope specified in art. 24 sec. 1 items 13, 14 and 21 PPL and, regarding a conviction for a prison sentence, to the extent specified by the awarding entity pursuant to art. 24 sec. 5 points 5 and 6 of the PPL, issued not earlier than 6 months before the deadline for submission of tenders, The terms of participation in the proceedings will be made in accordance with the formula "meets" / "does not meet", based on information contained in documents and statements submitted by Contractors referred to in Chapter 7 of the ToR. List of statements or documents 2/4 g ) the contractor's statement that he has not been the subject of a final judgment of the court or a final administrative decision on defaulttaxes or fees or social security or health insurance premiums, or in the event of such a verdict or decision, documents confirming payment of such claims together with any interest or fines or a binding agreement on repayment of these debts (with reference to the exclusion referred to in art. 24 paragraph 1 item 15 of the PPL) (according to the formula providesAnnex No. 5 to the Terms of Reference); h) the contractor's statement about the lack of a ruling against him as a preventive measure to prohibit applying for public orders (regarding the exclusion referred to in Article 24 paragraph 1 item 22 of the PPL) (according to the model attached No. 5 to SIWZ); i) the contractor's statement about the lack of a final conviction of a conviction court for offensefreedom or a fine to the extent specified by the awarding entity under art. 24 sec. 5 points 5 and 6 Pzp (according to the template constituting Annexe No. 5 to the Terms of Reference); j) the contractor's statement on the lack of a final administrative decision on violating the obligations under labor law, environmental law or social security regulations in the scope specifiedby the ordering party on the basis of art. 24 sec. 5 point 7 of the PPL (according to the template constituting Annex No. 5 to the Terms of Reference); k) the contractor's statement on not paying taxes and local fees, referred to in the Act of 12.1.1991 on local taxes and charges (consolidated text. Journal of Laws of 2019, item 1170, as amended) (according to the template constituting Annexe No. 5 to the Terms of Reference). In order to confirm the lack of groundsto exclude from the procurement procedure in the circumstances referred to in art. 24 sec. 1 point 23 of the PPL, the Contractor will be required to submit a declaration on belonging to or not belonging to the same capital group (according to the template constituting Annex 4 to the ToR). If the Contractor, showing compliance with the conditions referred to in Article. 22 par. 1b PPL (point 6.2 of the Terms of Reference), relies onasobach of other entities under the rules defined in art. 22a para. 1 of the PPL, it is obliged to submit together with the offer: -1) the third party's statement of compliance with the conditions for participation in the procedure (as regards the condition in relation to which its potential is available) and no grounds for exclusion on the EED form. EAT of a third party should be submitted under pain of nullity, in the form of electprovided by a qualified electronic signature; - 2) an undertaking by a third party or another document serving to demonstrate the disclosure of the potential to the contractor by a third party in accordance with point 7.3. SIWZ. Contractor who demonstrating compliance with the conditions referred to in art. 22 par. 1b of the PPL (point 6.2 of the Terms of Reference), relies on the resources of other entities under the terms of art. 22a para. 1 Pzp fromwill be obliged to present the documents mentioned in point 7.1 to these entities. point c k SIWZ. Proceedings are conducted in an unlimited tender on the basis of art. 10 para. 1 and art. 39 46 of the Act of 29.1.2004. Public Procurement Law (consolidated text: Journal of Laws of 2018, item 1986, later on PPL) and executive regulations to the PPL - Proceedings are conducted in accordanceNot with the rules provided for the so-called "Reverse procedure" referred to in Article 24aa (1) and (2) of the Public Procurement Law. According to the aforementioned provisions, the Awarding Entity will first evaluate the offers and then examine whether the Economic Operator whose tender has been rated as the most advantageous is not subject to exclusion and fulfills the conditions of participation in the proceedings. The Purchaser requires a bid bond in the amount of: 20, 000.00PLN (say: twenty thousand and 00/100 PLN) Bid bond should be submitted before the deadline for submitting bids. The bid bond can be paid in one or several of the following forms: 1) money, 2) bank guarantees or social savings fund surety- credit, but the surety is always a cash guarantee, 3) bank guarantees, 4) insurance guarantees, 5)sureties granted by entities referred to in art. 6b par. 5 points 2 of the Act of 9.11.2000 on the establishment of the Polish Agency for Enterprise Development (consolidated text: Journal of Laws of 2018, item 110, as amended). The deposit paid in cash must be paid by bank transfer to the Employer's bank account - in the bank of BNP Paribas Bank Polska SA - account number: 28 1600 1462 1016 7924 8000 0002 with the note:"Wadium MRN Migny building" Payment of the bid bond in cash will be effective if it is credited to the Contracting Party's bank account within the given period. From the contents of the bid bond in the form of: bank guarantee, social and credit union surety, bank guarantee, insurance guarantee or surety granted by entities referred to in Article 6b (5) point2 of the Act of 9.11.2000 on the establishment of the Polish Agency for Enterprise Development should result unconditionally, at the first written request submitted by the Employer at the time of binding the offer, the guarantor's obligation to pay the Ordering Party the full amount of the bid bond in circumstances specified in Art. 46 ust. 4a Pzp and art. 46 ust. 5 Pzp. The bid security brought in a form other than money should be fromput together with the Offer in the original in electronic form, ie with a qualified electronic signature authorized to issue it. The bid bond must secure the offer throughout the period of being bound by the offer. The offer of the Contractor, who will not pay the bid bond or will not secure the offer with an acceptable form of the bid bond within the prescribed period, will be rejected from the proceedings under Art. 89 paragraph 1point 7b Pzp. The contents of the tender bond must contain the following elements: 1) name of the principal (Contractor), beneficiary of the guarantee / surety (ordering party), guarantor (bank or insurance institution providing guarantees / sureties) and indication of their registered office, 2) specification of the claim which is to be secured by a guarantee / surety specifying the subject of the order 3) amountguarantee / surety, 4) obligation of the guarantor / guarantor to pay unconditionally and irrevocably the amount of the guarantee / surety at the first written request of the Ordering Party in the circumstances specified in art. 46 ust. 4a Pzp and art. 46 ust. 5 Pzp. The ordering party returns the bid bond to all contractors immediately after the selection of the most advantageous tender or annulment of the proceedings, with the exception of the contractorwhose offer has been selected as the most advantageous, subject to point 9.12. SIWZ. Contractor whose offer has been selected as the most advantageous, the contracting party returns the deposit immediately after the conclusion of the public procurement contract and the lodging of a security for due performance of the contract, if its request was made. Internet address (URL): http://bip.lasy.gov.pl/pl/bip/dg/rdlp_olsztyn/nadl_orneta/zamowienia_publiczne
The bid deadline for Contract notice: Construction work for water projects was 26 Aug 2019. Bidding is closed.
This tender has been issued by SKARB PA?STWA, PA?STWOWE GOSPODARSTWO LE?NE LASY PA?STWOWE, NADLE?NICTWO ORNETA in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45240000 ~ Construction work for water projects ~ https://www.tendersontime.com/poland-tenders/construction-work-for-water-projects-tenders/, 45246200 ~ Riverbank protection works ~ https://www.tendersontime.com/poland-tenders/riverbank-protection-works-tenders/, 45248000 ~ Construction work for hydro-mechanical structures ~ https://www.tendersontime.com/poland-tenders/construction-work-for-hydro-mechanical-structures-tenders/, 45100000 ~ Site preparation work ~ https://www.tendersontime.com/poland-tenders/site-preparation-work-tenders/, 45110000 ~ Building demolition and wrecking work and earthmoving work ~ https://www.tendersontime.com/poland-tenders/building-demolition-and-wrecking-work-and-earthmoving-work-tenders/, 45111000 ~ Demolition, site preparation and clearance work ~ https://www.tendersontime.com/poland-tenders/demolition-site-preparation-and-clearance-work-tenders/, 45112100 ~ Trench-digging work ~ https://www.tendersontime.com/poland-tenders/trench-digging-work-tenders/, 45112700 ~ Landscaping work ~ https://www.tendersontime.com/poland-tenders/landscaping-work-tenders/.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 34714697. The purchaser document reference is 330886-2019.