Expired Tender Denmark ICB TOT Ref. 20368998

Contract notice: Construction work for water Tender - 20368998

Tender notice from Denmark, published on 06 Feb 2018.

Executive Summary

The A/S STOREBÆLT has issued a Tender notice for the procurement of a Contract notice: Construction work for water projects in the Denmark. This Tender notice was published on 06 Feb 2018 and is scheduled to close on 05 Mar 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 20368998, while the tender notice number is 046937-2018 and Register on the platform.

Key facts

Summary
Contract notice: Construction work for water projects
TOT Ref. No.
20368998
Document Ref. No.
046937-2018
Country
Denmark
Notice type
Tender
Competition
ICB
Publication date
06 Feb 2018
Bid deadline
05 Mar 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work for water projects
Description: Contract notice: Construction work for water projects
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Negotiated procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45240000, 45243300, 45243500, 45246400, 45240000, 45243300, 45243500, 45246400
CPV Description: Construction work for water projects.
Sea wall construction work.
Sea defenses construction work.
Flood-prevention works.
Climate protection on language0
The project aims to reinforce the coastal protection and graves around the tunnel portal on Language0 in order to protect against floods of the rail tunnel. The construction work is required by the ongoing sea rises.
Main Site: WorkThese are carried out on Language0.
The purpose of the project is to strengthen the coastal protection and grazing around the tunnel portal on Language0 in order to protect against floods. The construction work is required by the current sea increases.
The existing coastal protection must be reinforced in two areas, Zone A and Zone B.
In zone A, the crown of the dikes and the service road must be approx. 1 km stretch-hauls from kote 5, 0 m to 6, 5 m. The road must also be loaded with concrete to increase the strength of extreme overcrowding. The backside of the dike to land must be better protected against extreme boreholes with a stone seal where the stones must be laid out with the least possible seal.
The entrepreneur must extend an existing culvert so that the new stone seal does not compromise the water equalizationthe mirror between Dybs0 and Flads0 in connection with storm flooding and flooding. Erosion protection is re-established on both sides of the culverten.
The construction industry must lay rally along the width of Dybs0 to stabilize the junctions along unprotected parts of the zone where there has been less erosion over the years. In Zone B, protection is increased over a stretch of approx. 260 m, where the crown of steadyT is expected from kote 4.0 to 5.0 m. In addition, a terrestrial farmer is landed with a crown cotex up to 6.0 m.
Earthquake will best of the soil excavated in connection with plants of substitute nature in the form of expansion of Flads0 and facilities of two smaller areas.
In Zone B, the service is moving inland. There is a need here to build a worthy one. This way the road is hatched locally approx. 1.5m foIt is possible to protect against immersive water during stormwater. Existing dirt road must be hauled at the Fasanhoen as part of the earthquake.
It should be noted that work will be carried out from September 1 to April 11 (for wildlife reasons, etc.).
It should also be noted that the contractor must deliver the stones, and that these should resemble the existing ones.
NB: THIS IS A RECOGNITION OF SPROG0. IT IS EXPECTED AFHOLDT, 22 MARCH 2018. IT IS EXPECTED THAT ALL PRACTICAL QUALIFIED OFFICERS PARTICIPATE IN THE VISIT.
In the contract notice, item II.2.7), 7 are indicated. It should be noted that negotiation of the duration of the contract can be negotiated. Please refer to section 4.5.1 of the Terms of Service, the Offer Letter and SAB Section 2.4.
The contracting entity must exclude an applicant from participation in the procurement procedure if-Applicants are subject to the mandatory grounds for exclusion referred to in sections 135 and 136 of the Public Procurement Act. The contracting entity will not make use of the voluntary grounds for exclusion, cf. section 137 of the Public Procurement Act.
Information on grounds for exclusion is included in the Single European Public Procurement Document (ESPD), Part III grounds for exclusion Grounds relating to criminal convictions Basis for payment of taxes and charges or contributingg to social security schemes Grounds relating to insolvency, conflicts of interest or representation in connection with the exercise of the profession. . The field of conflict of interest arising from the bidder's participation in the tender procedure.
The field of advisers' advice or other involvement in the preparation of the tender procedure. giving a rough mistakeinformation, retention of information and the possibility of submitting additional documentation. Applicants must use the single European tender document as proof that the applicant fulfills the minimum eligibility requirements below and how the applicant fulfills the objective and non-discriminatory selection criteria. Prior to the decision of the principal to award kthe tenderer to which the contracting entity intends to award the contract must provide evidence of the information provided in the single European tender document pursuant to Section 151 of the Public Procurement Act. Reference is made to the guidelines of the Competition and Consumer Agency regarding this.
The single European tender document (ESPD) should contain information about the application.
1) equity inthe most recent available accounts;
2) turnover in the last two available accounts.
This is stated in the single European Public Procurement Document (ESPD), Part IV B 4.
Applicants base their financial capacity on others:
Safeguard applications are based on other entities the equity is calculated as the total equity of the company and these other entities in the most recent available financial statements. Woed a group of companies (eg consortium), equity is calculated as the total shareholders' equity of the most recent available accounts.
Safely answering is based on the form of other entities, the turnover is calculated as the total turnover of the company and those of other entities in each of the most recent two available accounts. By an association of companies (eg consortium) the turnover is calculated as the total turnover of the participants in the last 2 available financial statements.
Answers can be based on other entities' economic capacity (eg, parent or sister company or subcontractor) regardless of the legal nature of the relationships between applicants and those others. If the applicant is based on the economic form of other entities, this must be entered in the ESPD, Del II, section C. In addition, the other party (s) concerned shall provide independent versions of the Single European Procurement Document (ESPD). If not, the contracting entity is unable to take into account the economic capacity of other entities.
If the applicant is based on the economic characteristics of other entities, see ESPD Part II, C, the company which the applicant is based on andwrite a letter of support, see attached attachment. If the statement of support concerns the economic and financial form, the undersigned is the undersigned.
Solidarity with the contracting entity on the signing of the contract under the terms and conditions specified in the tender documents. See template for support statement.
Documentation:
For award of contracts, documentation must be submitted.one for the information provided in the single European Procurement Document (ESPD) is presented in accordance with sections 151 and 152 of the Procurement Act. The applicant can confirm the fulfillment of the minimum requirement by submitting his balance or extract thereof in the last 2 available accounts, safremt publication of the balance is statutory in the country where the supplier is established or other documentation for egethe size of the capital. In the case of an association of companies (eg a consortium), the information must be submitted for each of the participating undertakings in the association. In relation to point II.2.6), the amount is stated above the expected contractual amount. Any questions and Responses in connection with the tender will be published at: www.sundogbaelt.dk/udbud/.
Interested invitationstravel to l0bende to stay informed on the website. The tender document specifies how and for what time the question may be asked.
The contracting entity reserves the right to use the procedure in Article 76 (1) of the UCITS Directive. 4, whose applications or offers do not meet the formal requirements of the tender.
Application for pre-qualification can not be submitted on Mayl.
Internet address (URL): http://www.sundogbaelt.dk
Directive: Classical Directive (2014/25/EU)

Documents

Tender Notice
Login to view

Similar tenders

Tender Country TOT Ref. No. Bid deadline
Pcr Thermal Cyclers for Research Laboratory Use Denmark 152604357 25 Nov 2026
Pcr Thermal Cyclers for Research Laboratory Use Denmark 152604330 25 Nov 2026
Pcr Thermal Cyclers for Research Laboratory Use Denmark 152604327 31 Dec 2026
Pcr Thermal Cyclers for Research Laboratory Use Denmark 152604276 31 Dec 2026
Pcr Thermal Cyclers for Research Laboratory Use Denmark 152604273 25 Nov 2026

Denmark Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work for water projects was 05 Mar 2018. Bidding is closed.

This tender has been issued by A/S STOREBÆLT in Denmark.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45240000 - Construction work for water projects, 45243300 - Sea wall construction work, 45243500 - Sea defences construction work, 45246400 - Flood-prevention works.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 20368998. The purchaser document reference is 046937-2018.

See the Similar Tenders section on this page or browse other tenders from Denmark.

This tender falls under Construction and Real Estate in Denmark. Suppliers in these sectors can track similar Denmark tenders using CPV-based alerts.