Contract notice: Construction work for water Tender - 32115795
Tender notice from Poland, published on 08 Apr 2019.
Executive Summary
The SEWIK TATRZA?SKA KOMUNALNA GRUPA KAPITA?OWA SP. Z O.O. has issued a Tender notice for the procurement of a Contract notice: Construction work for water and sewage pipelines in the Poland. This Tender notice was published on 08 Apr 2019 and is scheduled to close on 24 Apr 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 32115795, while the tender notice number is 163454-2019 and Register on the platform.
Key facts
Summary
Contract notice: Construction work for water and sewage pipelines
Object of the contract Construction work for water and sewage pipelines Description: Contract notice: Construction work for water and sewage pipelines Authority Type: Utilities entity Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: Lowest price CPV code: 45231300, 45000000, 45111200, 45111240, 45112000, 45112210, 45200000, 45231100, 45231111, 45231112, 45231113, 45232000, 45231300, 42131160, 45231300, 45000000, 45111200, 45111240, 45112000, 45112210, 45200000, 45231100, 45231111, 45231112, 45231113, 45232000, 42131160 CPV Description: Construction work for water and sewage pipelines. Construction work. Site preparation and clearance work. Ground-drainage work. Excavating and earthmoving work. Topsoil-stripping work. Works for complete or part construction and civil engineering work. General construction work for pipelines. Pipeline lifting and relaying. Installation of pipe system. Pipeline relaying works. Ancillary works for pipelines and cables. Hydrants. Reconstruction of the water supply network along with connections to buildings at ul. Pocztowcow and Żeromskiego in Zakopane Reference Number: 2S / Pocztowcow - waterworks / 2019 1. The subject of the order is the reconstruction of the water supply network along with the connections at ul. Pocztowcow and Żeromskiego in Zakopane. Main Site: Wojewodztwo Małopolskie, Powiat Tatrzański, Gmina Miasto ZAkopane, Pocztowcow Street and Żeromskiego Street. 1. The subject of the order is the reconstruction of the water supply network along with the connections at ul. Pocztowcow and Żeromskiego in Zakopane. 2. The scope of the order includes the reconstruction of the water supply network of the following lengths: - 0 90 mm PE 191.14 mb, - 0 63 mm PE 1.45 m, - 0 32 mm PE 120.13 mb. The Ordering Party informs that the above longerguests of the water supply network result from the project documentation, determine the estimated needs of the Employer during the contract period, not constituting a commitment for the Employer to its full implementation, or the basis for seeking compensation by the Contractor due to failure to complete the order. Final settlement of the Contractor's remuneration for execution ofthe contract will be based on the actual length of the water supply network, determined on the basis of an as-built geodetic survey carried out by an authorized surveyor, confirmed by the project supervisor and lump prices of 1 m of the aqueduct as their quotient. 3. The scope and description of the order includes: - Construction project for reconstruction of water networksiągowej Annex I to SIWZ, - Technical Specification of Construction Work and Acceptance (hereinafter: "STWiORB") Annex II to the ToR. Documentation mentioned in point 3.4 of the ToR, hereinafter referred to as "project documentation" or "technical documentation" constitutes an integral part of the SIWZ and the contract template. Significant provisions related to the implementation of the order: a) The contractor guarantees the implementationthe subject of the order in accordance with the conditions set out in this ToR and the project documentation referred to in point 3.4 SIWZ above. B) The offer submitted by the Contractor must include all investment costs, including fees related to obtaining current permits as well as the costs of restoring the area to the original condition. C) The order should be made of materials purchased and deliveredh) at its own expense by the Contractor. d) Construction materials are to comply with the SEWIK connection conditions, design documentation and the Technical Specification for Construction Work and Acceptance. e) Purchased materials must have appropriate certificates and approvals for use in the construction of an external network water supply. f) The Contractor will get the risk and responsibility at his own riskall information that may be necessary to prepare the offer. g) Contractors should read due diligence with the content of the tender documentation and obtain reliable information about the conditions and obligations that in any way may affect the value, nature of the offer or order fulfillment. In the situation when the Contractor wins the tender, complaints about changesy the value of the offer in the light of the obligations of the Contractor specified above will not be considered. h) The Contractor bears all costs related to the preparation and submission of his offer and all related documents. i) For the construction works provided for in the subject Ordering Party has notification of remodeling networks not requiring building permit. j) Provision of geotechnical serviceThe contractor is obliged to grant a guarantee: - for material and construction works for a period of 3 years l) After the works performed, the Contractor will be required to obtain written declarations from all owners of plots of land, that they do not raise any objections regarding the order left andto the original condition. The detailed scope and description of the subject of the order are included in the SIWZ and project documentation referred to in point. 3.4 of the SIWZ. Proceedings for granting a public order are carried out in the form of an unlimited tender based on the provisions of the SEWiK Sector Contracts Regulations. The public contract may be applied by the Contractor whothey have the following conditions: - Having the right to perform a specific activity or activity, if the law imposes an obligation to have such rights: The ordering party waives the requirement for this condition to be satisfied. The assessment of compliance with this condition will be made on the basis of a submitted declaration on meeting the conditions of participation in the proceedings in accordance with art. 15 of the Regulations. 1. The proceeding to which this document applies is marked with the following sign: 2S / Pocztowcow-wodociąg / 2019. Contractors should refer to the above-mentioned indication in all contacts with the Purchaser. 2. Proceedings for granting a public order are conducted in the form of an unlimited tender with an estimated value not exceeding the amounts specified in the regulations issued on the basis ofnot art. 11 para. 8 of the PZP Act based on the provisions of SEWiK Sectoral Contracts Orders. 3. Before submitting the offer, the Contractor should read the Sectoral Contracts Regulations applicable to SEWiK. 4. The content of the Regulations is available on the Employer's website: http://www.sewik.com.pl/images/pdf/regulamin_zamowien_2014_04.pdf 5. In unregulated mattersThe SIWZ is governed by the relevant provisions set out in the SEWiK Sector Inquiry Regulations and the provisions of the Act of 23.4.1964. Civil Code. 6. The Contracting Authority informs that the length of the water supply network results from the project documentation, determine the estimated needs of the Employer during the term of the contract, not constituting an obligation for the Employer to fully implement itji, nor the grounds for pursuing claims by the Contractor for non-performance of the entire subject of the order. The final settlement of the Contractor's remuneration for the performance of the subject of the contract will be based on the actual length of the water supply network, determined on the basis of an as-built geodetic survey carried out by an authorized surveyor, confirmed byan investor's supervision supervisor and lump-sum prices for the execution of 1 m of the water supply system as their quotient 7. The Ordering Party informs that whenever the subject of the order specified in the SIWZ, design documentation and STWiORB is described by the indication of the trademark, patent or origin, the Employer allows for equivalent solutions, i.e. having features, technical and operational parameters, application, e worse than described in the SIWZ, project documentation and STWiORB. Demonstration of the equivalence of the offered object rests with the Contractor. In the situation when the Contractor intends to use equivalent materials or equipment, he is obliged to include in the offer a list of the counterparts offered along with the characteristics and documents confirming the same or better quality, eg quality specificationsin, quality control certificates, certificates, etc., which will confirm in a manner that has no doubts the equivalence of the proposed materials or devices. The Employer requires employment throughout the duration of the contract by the Contractor or Subcontractor based on a contract of employment within the meaning of the provisions of the Act of 26.6.1974. The Labor Code of persons performing the activities of operators of heavy equipmentor construction equipment and people performing installation work and related to the construction of the water supply network. 9. The Contractor will be bound by the offer for a period of 45 days. The period of being bound by the offer starts as soon as the deadline for submission of tenders expires. (Rule 48 of the Rules of Procedure) Internet address (URL): http://www.sewik.com.pl
The bid deadline for Contract notice: Construction work for water and sewage pipelines was 24 Apr 2019. Bidding is closed.
This tender has been issued by SEWIK TATRZA?SKA KOMUNALNA GRUPA KAPITA?OWA SP. Z O.O. in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45231300 - Construction work for water and sewage pipelines, 45000000 - Construction work, 45111200 - Site preparation and clearance work, 45111240 - Ground-drainage work, 45112000 - Excavating and earthmoving work, 45112210 - Topsoil-stripping work, 45200000 - Works for complete or part construction and civil engineering work, 45231100 - General construction work for pipelines, 45231111 - Pipeline lifting and relaying, 45231112 - Installation of pipe system, 45231113 - Pipeline relaying works, 45232000 - Ancillary works for pipelines and cables, 42131160 - Hydrants.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 32115795. The purchaser document reference is 163454-2019.
This tender falls under Construction and Real Estate, Technology and Equipment in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.