Contract notice: Construction work for water Tender - 25437409
Tender notice from Bulgaria, published on 31 Jul 2018.
Executive Summary
The ?????? ?????????? has issued a Tender notice for the procurement of a Contract notice: Construction work for water and sewage pipelines in the Bulgaria. This Tender notice was published on 31 Jul 2018 and is scheduled to close on 31 Aug 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 25437409, while the tender notice number is 330945-2018 and Register on the platform.
Key facts
Summary
Contract notice: Construction work for water and sewage pipelines
Object of the contract Construction work for water and sewage pipelines Description: Contract notice: Construction work for water and sewage pipelines Authority Type: Regional or local authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45231300, 45231300, 45231300 CPV Description: Construction works for water and sewerage pipelines. "" Selection of a contractor of the construction works under the project: "Development of streets in the districts 103, 116, 117, 118, 119, 120, 121, 122, 123, Momchilgrad" the contract "Selection of a contractor of the construction and assembly works under the project:" Development of streets in the districts 103, 116, 117, 118, 119, 120, 121, 122, 123, Momchilgrad "the conduction and sewerage network of the town of Momchilgrad. The following main activities are included: Main Site: Republic of Bulgaria, Kardzhali district, Momchilgrad municipality, Momchilgrad, districts 103, 116, 117, 118, 119, 120, 121, 122, 123 І. Sewerage / Sewerage - domestic and rain 1 Excavation with fire. width 0, 6 to 1, 2 m - manually in soil soils unfixed H = or m 756; width up to 1.2 m - manually-reinforced in soil soils with H = or m 285; width of up to 1.2 m - hand-fortified in earth poles with H = 2 to 4 m m 712; 4 narrow trench (C = 0.6 to 1.2 m H = or m 1 070; (B = 0.6 to 1.2 m H = 2 to 4 m) in rock soils at sites and facilities м 355; 6 Earth excavator at 1 uton of transport m 3 920; 7 Load excavated terrain with excavator m 1 626;earth moving masses of 5 km 1 626; 9 Dismantling by bulldozer or burial excavation with a run of 41 to 100 m at norm. ≈ 5 472, 00; 10 Loading rocking mass of transport by excavator m 5 472, 00; 11 Transport of earth and rock masses up to 3 km 3 5 472, 00; 12 Pads from land and sand m 1 386; 13 Base of ballast m 240; 14 Ballast transport m 240; 15 Non-rigid forging and erection of trenches B = or м-3 600; 16 Non-seismic reinforcement and removal of trenches B = or m 3 100; 17 Non-seismic reinforcement and removal of trenches B = or m 2 090; 18 Non-seismic erection and erection of trenches B = or ; 19 Street walkers for round grooves with a hole of 60 cm from prefabricated elements. with depth. 4M pcs. 49; 20 Installation pipes PP-SN 8kN / m2 DN / OD 250 m 1 575; 21 Supply pipes PP- SN 8 kN / m2 DN / OD 250 m 1 575;-PP-SN 8 kN / m2 DN / OD 250 pcs. 263; 23 Delivery pipe rings PP- SN 8 kN / m2 DN / OD 250 pcs. 26 Supply pipes PP-SN 8 kN / m2 DN / OD 315 м 280; 26 Supply pipes PP-SN 8 kN / m2 DN / OD 315 м 280; DN / OD 315 pcs. 47; 27 Delivery pipe rings PP-SN 8N / m2 DN / OD 315 pcs. 47; 28 Mounting pipes PP- SN 8kN / m2 DN / OD 400 m 125; 29 Supply pipes PP- SN 8 kN /m2 DN / OD 400 m 125; 30 Supply of pipe joints PP- SN 8 kN / m2 DN / OD 400 pcs. 21; 31 Delivery app. pipe rings PP- SN 8 kN / m2 DN / OD 400 pcs. 21; Sewerage - domestic and rainfall. Sewerage / Building sewerage system - domestic rainfall - 155 pcs. (105 50): 1 Excavation with fire. width 0, 6 to 1, 2 M - manually in soil soils not fixed H = or m 514; 2 Excavation up to 1, 2M - hand-fortified in terrestrialsoils with H = or m 223; 3 Excavation up to 1.2M - hand-fortified in earth poles with H = 2to4M m 335; 4 Excavation with earth excavator. soils at 1 u. transport vehicles m 1 160; 5 Dismantling with a bulldozer or burying a trench with a sample. up to 40 M at 499.8 Celsius. soils up to 3m horizon. or 2 m ver. distance - manually m 335; 7 Sealing soil soils manually with manual ramming of layers of 10cm m 1 732, 2; 8 Transport of land masses 5 km with dumper m 499, 8; 9 Dismantling by bulldozer or burial excavation with a run of 41 to 100 m at norm. m 1, 732.2; 10 Load excavated earth ground by haulage m 1, 732.2; 11 Load unfolding rock mass of transport by excavator m 10; 12 Transportation of rock masses up to 3 km m 3 484, 4; 13 Bulldozer rock excavation or splashing 41-up to 100 m at norm. -ви - and Trench Relief B = or m 2 790; 18 Non-seismic attachment of the trenches B = or m 930; 19 Supply pipes PP-SN 8 kN / m2 DN / OD 160 m 930. in CS to document The participant should have a registration in the Central Professional Register of the Constructor under the Construction Chamber Act for the execution of construction works of the fourth group, the third category, allowing him to carry out the works subject to the present contract and for a participant foreign person - equivalent document or declaration by the competent authorities under-his national law on the entry of the person in the relevant professional register of the State in which he is established, permitting, under the legislation of the State in which the participant is established and carrying out his activity, the performance of the works covered by this contract in a notarized copy, with translation into Bulgarian Proof of professional fitness: In order to demonstrate compliance with the selection criterion, the participant provides the relevant information in the Single European Procurement Document (EEDOP, Part IV, Section A: "Fitness", p. 1) Prior to concluding a contract the participant selected for the contractor shall submit a copy certified by the participant of a valid document certifying the participant's entrygroups and categories of works in the CPSC and for a non-resident participant an equivalent document or a declaration by the competent authorities under its national law on the entry of the person in the relevant professional register of the State in which he is established under the law of the country in which the participant is established and carries out its activity performing the construction worksand subject of this contract, in a notarized copy, accompanied by a translation into Bulgarian. The participant in the procedure must meet the minimum economic and financial standing requirements, namely: the total for the last three financial years ended (2015, 2016 and 2017), depending on the date on which the participant is established or commenced, has realizedtotal turnover not less than BGN 1 700 000.00 (one million and seven hundred thousand) excluding VAT and turnover including turnover in the scope of the contract (construction) - not less than 1 000 000, 00 (one For proof of compliance with the selection criterion, the participant provides (declares) the Single European Procurement Document (EEDO)Part B, Section B: "Economic and financial standing", items 1a and 2a) the relevant information on the total annual turnover and the annual turnover in the business area covered by the contract for the last 3 completed financial years. The participant must hold a contract valid as of the date specified in the contract notice as the deadline for receipt of tenders, professional liability of the participants in the construction according to Art. 171 (1) of the TDA or equivalent document covering the minimum insurance amount for the type of construction corresponding to the subject of the present contract. In order to prove compliance with the selection criterion chosen by the contracting authority, the participant provides (declares) in the Single European Document for public procurement (E.Eligible documents: Before entering into a public procurement contract the participant selected as a contractor shall submit a copy of the " Professional Responsibility. "This procedure is without secure financing. Upon adjustment of the value of the project after axesfinancing will be made also to the concluded contract up to the amount approved by the financing authority and according to the provisions of the Public Procurement Act and the RDP! This contract is expected to be funded by the Ministry of Environment and Waters through a project for the management of environmental protection activities under the project: "Selection of a contractor of the project for the project" Strengthening streets in theVratsa 103, 116, 117, 118, 119, 120, 121, 122, 123, Momchilgrad. "At the date of the opening of the present procedure, an agreement with the EMEPA for providing financial resources has not yet been concluded. on the grounds of Article 114 of the Public Procurement Act, the performance of the public procurement contract, including its action, is postponed and depends on the fulfillment of the following condition:of an agreement signed between Momchilgrad Municipality and EMEPA for providing financial resources for the realization of an investment project for the project "Development of streets in the 103, 116, 117, 118, 119, 120, 121, 122, 123, Momchilgrad districts. In the event that no agreement is concluded between Momchilgrad Municipality and EMEPA for provision of financial resources, as a result of which it can not be securedthe contract with the selected contractor shall be terminated without notice and such termination may be requested by either party upon expiration of a three-month period from its conclusion according to Art. 114, vol. last of the PPL. The costs for the execution of all parts of the work / technical project are at the expense of the contractor. Conshigher bid value will be removed from participation as not complying with the requirements of the contracting authority. The time limit for performance of the subject of the contract is determined according to the contractor's proposal. Each participant must comply with the requirements set by the assignor to be: - Not less than 110 (one hundred and ten) calendar days, - Not more than 300 (three hundred) calendardays from the date of opening of the construction site. The participant should bid for a calendar execution period that complies with the minimum and maximum duration specified here to match the types of work and volume of activities included in the subject of the contract and the proposal to complete the order. A participant who has proposed an implementation deadline that does not comply with the sthe minimum and maximum limits set by the assignor at this point will be removed from participation in the procedure Internet address (URL): www.momchilgrad.bg
The bid deadline for Contract notice: Construction work for water and sewage pipelines was 31 Aug 2018. Bidding is closed.
This tender has been issued by ?????? ?????????? in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45231300 - Construction work for water and sewage pipelines.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 25437409. The purchaser document reference is 330945-2018.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.