Object of the contractConstruction work for school buildings
Description: Contract notice: Construction work for school buildings
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45214200, 45214200, 45214200, 45212222
CPV Description: Construction Work for School Buildings
Gymnasium Construction Work
Construction Workout and Gym Building
Reference Number: EKR000947512019
Existing construction works include interior refurbishment, refurbishment work, and high roof construction work. On the northeast side of the property there is a new gymnasium in Keszuel. The existing epuelette and the new hall, a koezoes serving block coetiese in the jooe. I demolish some of the non-playable elements of the existing high-level epuelet epuelet.
Main Site: 5720 Sarkad, Kossuth u. 17: 3076/2
All existing epuelettes have new epuelet electric systems in the process, and I refurbish the water blocks completely, and the heat discharges are replaced. Next to the main entrance there are four halls with oesszenyitas with aula letesuel. Some rooms epueluel beluel at groupization keruel. The washbasins of the existing epuelet are being completely modernized. New casing in the public areas and in the classrooms. The existing gym is given a new function. On the eastern side, there is a hallway corridor letesuel buefevel, and the remaining space is provided with a mixed educational function (chamber room).made of waterproof and juicy celebrity. I'll demolish my existing basement vault. The cellar is up. On the uppermost, reinforced concrete foamed cesuel is inserted into the bearing walls. The local reinforcements should be carried out after the disassembly and dismantling by a designer. The roof structure has a new roof foil and lecezes lecezes. Roofing c
The renovated epuelet, the same white, plastic, kuelter arrowheads as keruel for installation
The existing facets of the reconstructed epuelet will be rendered and painted the same level as the original. The remainder of the grid is functional in the joiner. A methe top level rabbits on the north side of the gym will be demolished (host, ceremony) level, and the features will be installed in the new server epaulet. may be suggestive, reciprocal, sub-contractor, and not eligiblecertification is an economic entity with whom the Kbt. - 62 (1) and (2) are any exclusive grounds. (X.30.) Korm. R. Section 21 para. (1) of the Kbt. Section 65 para. Construction contractors in accordance within the case of co-operatives listed in the register, or, in the case of non-Hungarian economic operators, if the contract performance is required, in the country of registration of the country of establishment or in the country of establishment looketeben):
For the offerer, the Kbt. (1) of Section 67 and Section 321/2015. (X.30.) Government Decrees 1-4. Of the Kbt. In the case of a call in accordance with Article 69 (4), the tenderer (s) and sub-contractor (s) established in Hungary and, where appropriate, the economic andwith regard to the actor (s) (X.30.) On. 8 of Decree 321/2015. (X.30.) On. of the Government Decree, with regard to Articles 4, 6 and 12-16 of the Government Decree. The grounds for exclusion shall also be justified in accordance with the provisions of Sectionsupstairs. The Kbt. In view of the provisions of Article 67 para. 4 para. - 62. Subcontracting for exclusion reasons
Continued from point III.2.2):
Upon reaching the 100% performance requirement, there is a possibility to submit a chemical invoice on the basis of a technical inspection certificate.to. Bidding force, the support burden provided on the basis of EFOP-4.1.2-17-2017-00063 wants to account for the adversaries. The grant intensity is 100% of the eligible project costs. The financial turf is utofinirirose. Proof of performance is provided by Kbt. Section 135 (1) - (2) of the Act provides for the provisions on the employer. A. Tenderer for proof of contract (non-defect-free) performance certificateis entitled to submit a chemical invoice (Section 322/2015. (X. 30.) 31.) - 135 and Decree 322/2015. (X.30.) Korm. R. 30. - es 32 / A-32 / B.
The Contractor shall, if the Contractor uses a subcontractor for the performance, be governed by the Civil Code. 6: 130th (1) - (2) of the Kbt. Article 135 (3) fon the basis of Resolution 322/2015. (X.30.) Government Decree 32 / A. i 32 / B. The cost of the contract is not subject to licensing, General AFA rules are superfluous. Form 2 permission is subject to costly investment, such as the so-called reverse AFA paid rule.Currency: HUF (Forint)
The winner of the offer is charged by your Commissioners. This is 5% of the contracted general sales tax. Your commissioners are the Kbt. - 134 (6) a) Any modality may be fulfilled.eat it. The maximum rate of interest for net interest is 10%, ie 20 days per service.
draft contract first You will be tempted to check out the referrals from the procedure.The number of time-consuming insurance companies is 3 000 000 HUF Number of payments for the periodic service: Hungarian Allamkincstar: 10026005-00336523-30005204
The way of payment of the periodic insurance companies is as follows:
toerteno atutalasaval (deposit), penzuegyiinsurance or a collateral underwriter or collateral or a collateral underwritten by an underwriter. The Kbt. 41 / A. (2) of the EC Treaty, it is intended that a statement which serves as the basis for any coexistent organy Warranties Statement), comply with the requirements of a fully-fledged private writ of civil records under the Civil Code. When making a deposit or cashout, you must indicate on the Co-Operator's Statement that you are "EFOP-4.1.2 Your Corner Bidder."ertennie. In the event of a cash withdrawal, the time limit for submitting the bid must be reached on the business day preceding the closing of the quotation. In the case of a deposit, a proof of payment must be attached to the offer. In case of cash withdrawal, proof of bank transfer certificate must be attached to the offer. K initiates the procedure on condition that the action is taken. The Kbt. Section 53 (6) timeliness of the basethe supportive parent has submitted a positive affirmation and considers the acceptance of the request for support or the acceptance of the requester to a lesser extent as a test of success, which may render the procedure ineffective. The Kbt. Pursuant to Article 135 (12), this condition is also a condition that is to be exhorted to be imposed on the contracting authority. Time included in point IV.2.6)artam a Kbt. Section 81 (11) is based on 60 days. The evaluation of the content of the offers according to the sales aspects can be given a score of 0-10 points, which is the same in all the aspects. In the case of a one-shot net offer price criterion, KoezpeRzesi Notice (hereafter: Utmutato), Issue 106, June 2016, June 2016 Reverse line for gold reverse translation according to point 1 (aa). The duration of the promotion and the professional experience of the specialist are described in Appendix 1 of the Guide. Attachment A line for a straight line as described in point 1 (b). The minimum is 36 months. The Kbt. - 77 (1) on the basis of afor the maximum indicated by the bureaucracy and for the more favorable prices, the maximum score is given to the reviewers and to the maximum replacement of the keruel, even if a more favorable offer comes. Commitment by name: Robert Beleznai FAKSZ 5700 Gyula, Klapka u. 23., Phone: 36 205034063, e-mail:
[email protected] Case Study 00501
Dr. Szathmary PeterFAKSZ 5600 Bekescsaba, Kinizsi u. 13. Tel / fax: 36 66444568 Email:
[email protected] Registration number: 00432
6. The Kbt. Pursuant to Article 73 (5), the time authority coincides with the name of the organizations from which the offeror may be informed of the co-requisites referred to in paragraph (4) which must be complied with.
Continued due to character limit in point III.1.2)
Internet address (URL): https://kk.gov.hu/gyula