Expired Tender Hungary ICB TOT Ref. 15253583

Contract notice: Construction work for pipelines Tender - 15253583

Tender notice from Hungary, published on 28 Jul 2017.

Executive Summary

The NIF ZRT. has issued a Tender notice for the procurement of a Contract notice: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork in the Hungary. This Tender notice was published on 28 Jul 2017 and is scheduled to close on 26 Sep 2017, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 15253583, while the tender notice number is 293605-2017 and Register on the platform.

Key facts

Summary
Contract notice: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
TOT Ref. No.
15253583
Document Ref. No.
293605-2017
Country
Hungary
Notice type
Tender
Competition
ICB
Publication date
28 Jul 2017
Bid deadline
26 Sep 2017
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
Description: Contract notice: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
Authority Type: Body governed by public law
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45230000, 48140000, 72212140, 45230000, 48140000, 72212140
CPV Description: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork.
Railway traffic control software package.
Railway traffic control software development services.
V040.04 Vallalkozasi szerződes Szazhalombatta (bez.) Pusztaszabolcs (bez.) vonalszakasz biztositoberendezesi, tavkoezlesi es ETCS 2 kiegeszitő tervezesi, valamint kivitelezesi munkai
Reference Number: V040.04
Author's designation: Conventional design
Main Site: Szazhalombatta Pusztaszabolcs railway line section
A
26.28 km length Szazhalombatta On the Pusztaszabolcs line section of the safety equipment and ETCS 2 expanding design and execution work the following Main tasks to be carried out:
- ETCS 2 level train entry system installation SzaAnd - the new electronic electromagnetic shielding systems provide the basic software, the test system of the system, - the new electronically controlled shielding equipment, which is connected to the accentuated objects (counties, loosely connected) with the following:
- Szazhalombatta Allomas: 29 pieces,
- Ercsi -Elagazas: 9 pieces,
- IvancsAllom: 4 pieces,
- Pusztaszabolcs allomas: 45 pieces, with 87 pieces,
- gearing, lifted speeds on the open lines Szazhalombatta and Pusztaszabolcs allomas, 26, 28 km, - - electronic accessory equipment 7 pcs:
- allomass: 3,
- openings: 4 full-scale reconstructions of allotomy epitopes, Ercsi-Elagazas new inspectors, - The installation of the new block-calibrators, - The installation of potters' equipment, and the installation of the Pusztaszabolcs allomas, - The installation of a new iron supply system, - The installation of a new mono-modular 96-strands technological fiber optic strings,
- a new system,
- fire and fireThe installation of a burglar alarm system, - the establishment of interface interfaces for individual equipment for ETCS and FOR systems, and for the ETCS and allomass security equipment, - the installation and programming of ETCS 2 equipment, - the ETCS adapter For the GSM-R system,
75 Hz signal encryption system for the whole length,
- insert the HETA objects into the primary and secondary (content) FET cores in the frame of the palyaepites tender,
- insert the allomas and the objects of the phases into the FET system, - carry out the safety-related procedures of the installation systems of the installation according to EN 50126, EN 50128 esEN50129 according to the standard (including the appropriate tanusiTast is),
- obtaining certificates and declarations corresponding to the official languages of the NFM Decree 2008/57 / EC and 30/2010 (XII.23.), - issuing of a special technical plan for the presentation / insertion of the project, (Not just railroads), designer's wondrous requirements, design and validation plan, and
The quantity of felt is tapered and can be modified in design-permit.
Project related: This project, which is related to this co-op contract, is a project designed for the GSM-R 2 System, which will be used for the co-operation of the co-op-It is not permissible with regard to the following: Kelenfoeld Pusztaszabolcs line section security equipment and ETCS 2 expansion plan, construction, and other work (complex, high performance, FET, etc.) work and complex task that many A professional and professional workmanship co-ordinator and diverge on the river-corner. In the epithetic activity, it is tempting to have a better profession at the same time to work continuously on the terranea. In this case, the task force, which is already in the process of qualification, is responsible for determining the limits and the requirements of the responsible parties, the guarantee of each individual guarantee, and the determination of the high level of co-operation and full-time work. The main fSells the ETCS-2 system, which creates a complex system, and a one-handed assignment of the work significantly affects the coordinate and pen- sian long-term risks.
Kizaro's Reasons:
- This policy can not be time-consuming, subtractive and can not take Which may be validly verified by an economic operator against whom the Kbt. Article 62 para. (1) to (2)All rights reserved.
Authentication Mod:
- An eligible, eligible economic operator is a 321/2015. (Hereinafter: "EEKD"), in accordance with Section 4 (1) of the Hungarian Government Decree (X. 30.) Korm. - 62.
- In the EEKD, the economic operator-(The provider, if appropriate, the capacity allocation organization (s)) declares that the exclusionary reasons do not apply to him, and he / she will provide the garden information in the foregoing. The declaration must contain the indication that the Pursuant to Article 69 (4) of this Act, which is the right to issue a certificate, According to Section 69 para. (11)For the purpose of the application and for the purpose of making a statement. Section 67 (4) of the Statute shall be declared by the Provider.
- The exclusionary reasons have not been filed in the pleadings of the Verdicts [Kbt. Section 69 (4)] shall be governed by Article 8 para. - 10, - 12 - 14 and - 16.
- If you are in contact with the extractIs in progress, it must be accompanied by a copy of the registration note submitted to the consortium and the proof of the co-ordination of the building. The timeline must include the date of the declarant's statement that he is in the process of filing a separate record with him (also enclosing a negative statement).Please consult the Kbt. - 64, -- 74 (1), and further to AD 1-8, 10, 12-16. - The submitting declarations / credentials must be dated to the deadline for submitting the application.
Verification mods for the professional activity:
SZT1)
In the case of a registered economic operator established in Hungary, the name of the representative of the epitheting industry inspectorIn the case of non-Hungarian registered economic operators, in accordance with the provisions of European Parliament and Council Directive 2014/24 / EU XI. Annex Certificate (extract) or other proof or declaration of records listed in igazolaskent be submitted, taking into account BC Section 1 (2) - paragraph (5) It ST2
)
Bidder (Bidder koezoes) 322/2015 of..-(X.30.) Korm. Decree No. 8 (1) and the Kbt. (1) (2) and (5) of the Criminal Code of the Republic of Croatia and of the Republic of Croatia,, The Kbt. Paragraph (11) of Section 69. • The applicable minimum requirement (s) of the professional activity is:
SZT1)
Provider (coEszoes) is unsuitable if no Etv. According to the names of the building industry executives; If not registered in Hungary, if it is not registered in the European Parliament and Council Directive 2014/24 / EU XI. And does not fulfill any of the other test methods included in the aforementioned breast cancer.
SZT2)
The taxpayer is not eligible if it is not listed in the commercial register of the relevant professional chamber in the relevant Chamber of Commerce or Merck service related to the epithet, or the non-Hungarian economic operator is not registered in the country of the resident or has no resident He has given permissionOr by organizational, chamber members.
Approved by the Kbt. Section 65 (6) to (7); (9); (11) of the Kbt. Section 69 (11) of the Code of Civil Procedure.
In accordance with the relevant provisions of the EEKD, (1) to (3) of Article 67 (1) shall be subject to a time-limit; Provider of the form IV. RYou will not be able to enter any information you may need.
Appointment of the attorneys who have been summoned to prove the verdicts must be verified according to the following suitability criteria. Subject to Section 69 (4) and (6):
P1)
The sender (the co-worker) must enclose the declarations under Rule 19 (1) (c)(Whether it is related to work equipment and / or ETCS systems, but also to any related work related to these works), in a timely manner, with the help of an expert on the time when it was sent to paper and when it started to work, If these data are availableAll-in-one P1) in the case of an appropriate test case, using Section 19 para. (3); (6) to (7) and (10) of the Kbt. Article 65 (6) - (8) and (11) of the Constitution also apply. Further information can be obtained at: As in above-mentioned contact point (s). Article 39 (1), Regis- tered data can be found on a discovery, unlimited, full-time, free of charge and free of charge electronically by the present user I.3). The KD should be downgraded to the lowest rate by the time the subscriber or the subcontractor named at the time, electronically and the fully encrypted regis- tered data sheet must be verified by the cashier at the time of the due date. The sum of the time insurance agents: 10 000 000 HUF, which can be fulfilled by the Kbt. Article 54 (2) bAccording to them. In the event that a time-consuming agent is required to pay the time-surety with a depositor, it shall be paid in the same way with the time-consuming MKB Bank 10300002-20609931-49020322; Verifiable mod: simple burden of bank accountant (atutalans certificate, banquet extract). More information can be found in KD.
3. The timing should include the cloudN and all documents specified in the KD.
4. The author argues that the specialists referred to in subpoena III.1.3) M2 of this User must have the right to be present in the relevant chamber records, which must be insured during the entire duration of the contract;
A) and B): MV- VV; C) Specialist: MV-TV; D) iKember: KE-VV
Fentieken tul the author descriptive statement of the winner of the confessional have the following specialists.
In conjunction with the point of view, the statement of the criteria of the preamble is presented in the statement of the statement / oeneletraj. The offer must be made in an original paper base and in an electronic masseur stand. Attorneys call attention to the Kb. Paragraph (2) of Article 47.
7. Bidder excludes the Bid. Section 35 (8) of the basic draft of the draft.
8. AjaThe number of eligible persons and their verifiers was lowered to the official list of qualified time-takers. Tender for the Kbt. Section 71 provides the basis for the Hierypotlas opportunity.
10. Tender for the Kbt. Section 75 (2) (E).
11. The winner is a probationer at the time of the contract (1) the epitaxis commissioner (1 000 000 000/ 500 000 000); (2) projecting indemnity (200, 000, 000 / 100, 000, 000) in accordance koetni KD reszletezettek.
12th The present trial is indisputably [voe. Yes. Article 53 (6) of the Constitution. Contracting a claim for non-recognition or smaller than requested oesszegben toertenő adoption as a koeruelmenynek the support that because of the proceedings resultYou can unsubscribe, which is a test of the Kbt. Section 135 (12) According to the authorship, the authorship of the term is a qualifying subject. The timer reminds me that the tarithic epithets qualify as indivisible services. The time limit specified in Section II.2.7 shall not be longer than 31.12.2020. In the case of point IV.2.6), a period of 60 days is required for a period of two monthsIs
16. Accreditation accredited by: dr. Sandor Szterenyi, registered in: 00159.
17. In the present and in the non-standardized brochures in the co-procurement documents, the CXLIII. Television and its regulations, and the provisions of Hungarian law are the iranians. The adverts are based on the language of the co-buyers 2014/25 / EUkoezzetetelre.
18th Concerning VI.3), the enclosed documents contain additional information in the context of the advertising rules of the advertising system (character constraint).
Internet address (URL): http://www.nif.hu
Directive: Classical Directive (2014/24/EU)

Documents

Tender Notice
Login to view

Similar tenders

Tender Country TOT Ref. No. Bid deadline
Jira License Support and Consulting Hungary 152592429 27 Nov 2026
Bp. Iv. Baross U. 39-43 Building B Transformation Planning Hungary 152592235 25 Nov 2026
Building a Solar System in 2 Parts Hungary 152592234 14 Dec 2026
Internal Road Improvements and Renovations Hungary 152592135 23 Nov 2026
Construction of axle load and total weight measuring station and bicycle path ** Hungary 152592034 24 Nov 2026

Hungary Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork was 26 Sep 2017. Bidding is closed.

This tender has been issued by NIF ZRT. in Hungary.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, 48140000 - Railway traffic control software package, 72212140 - Railway traffic control software development services.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 15253583. The purchaser document reference is 293605-2017.

See the Similar Tenders section on this page or browse other tenders from Hungary.

This tender falls under Construction and Real Estate, Computer Hardware and Software Services, Defence and Security in Hungary. Suppliers in these sectors can track similar Hungary tenders using CPV-based alerts.