Contract notice: Construction work for pipelines Tender - 24435140
Tender notice from Hungary, published on 25 Jun 2018.
Executive Summary
The E.ON DÉL-DUNÁNTÚLI ÁRAMHÁLÓZATI ZRT. has issued a Tender notice for the procurement of a Contract notice: Construction work for pipelines, communication and power lines in the Hungary. This Tender notice was published on 25 Jun 2018 and is scheduled to close on 26 Jul 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 24435140, while the tender notice number is 271601-2018 and Register on the platform.
Key facts
Summary
Contract notice: Construction work for pipelines, communication and power lines
Object of the contract Construction work for pipelines, communication and power lines Description: Contract notice: Construction work for pipelines, communication and power lines Authority Type: Utilities entity Contact Nature: Works Procedure: Negotiated procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45231000, 45231000, 71322000, 71334000, 45231000, 71322000, 71334000 CPV Description: Construction work for pipelines, communication and power lines. Engineering design services for the construction of civil engineering works. Mechanical and electrical engineering services. Epitesi beruhazas Reference Number : EKR000252472018 Foeldkabeles es legvezetekes segedoszlopos csatlakozok tervezese, valamint foeldkabeles, legvezetekes es legvezetekes segedoszlopos csatlakozok letesitese, gethe standard equipment of the columns and the standard coupling, and the connecting halos under the control of E.ON Del-dunantuli Aramhalozati Zrt., E.ON Eszak-dunantuli Aramhalozati Zrt., E.ON Tiszantuli Aramhalozati Zrt. Site: Kaposvar E.ON Del-dunantuli Aramhalozati Zrt. Uezem Kaposvar Sector in the service area Foeldkabeles and conduitsand the design of the columns and the foothold, top and bottom conductor posts, geodesic inserts, columns and standard flanges, and the coupling halos under the tension of the chassis of the frame box given in point II.2.6 (107 000 000 HUF). Foeldkabeles and most conductive spindle joints planThis is also possible with the use of foeldcapel, lead and top-mounted spindle terminals, geodetic inputs, columns and standard dowel equipment, and the coupling halos under long-term test conditions Short-circuit cable and open conductors (sloping) system design - Simplified design kit- - geodetic joint - forge- Interoperability planning and design approvals - Compliance and design approvals for low-voltage cables and open conductors (standard and single-pole) systems for the installation of electrical and electronic equipment - auxiliary columns -(cabling, cable laying column or sectional or foelding distribution system) - foelding workpiece (column and gauge design, cladding of cladding, cladding of the cladding, cladding of the cladding, cladding of the cladding, landscaping) - geodetic diecast - digital es(s), and may not be considered as a legitimate economic operator against whom the Kbt. Section 56 (1) - (2) excludes the grounds for exclusion. Section 74 (1) b) must be based on the justifications• Verification mod: In the rescheduled application of the reseller's application, EEKD must confirm in advance that it is not part of the Kbt. . Section 62 (1) - (2) for reasons of exclusion iBriefs on the Kbt. Section 69 (4) - (7) must be submitted to the base of his / her application for a referral. [321/2015 (X.30.) Korm. r. 1-8, 10 and 12-16.-]. A 321/2015 (X.30.) Korm. R. Section 15 (1) shall only apply to the EEKD to submit a copy of the application for a copy of the application to the competent authority of the subcontractor or the body submitting the application. (62) (1) to (2)the reasons for the dangers of the cause are in the affirmative. A 321/2015 (X.30.) Korm. r. Section 15 (2) of this Decree states that only those cases where the claimant who has not submitted a valid claim for reimbursement can only declare that the grounds for exclusion do not concern the Kbt. Section 67 (4) If the economic operator named in the rescheduled application is in-it is in progress, the reseller must be accompanied by a copy of the bill of lading filed with the co-rapporteur and the proof of his signature from the building, in a simple semi-verbal file [321/2015. (X. 30.) Gov. r. Section 13]. A 321/2015. (X. 30.) Gov. r. Section 6 (1) the economic operator must enter the appropriate format of the EEKD format-the grounds for exclusion can be justified by the availability of databases which are verified in the justification of exclusionary grounds by the provider of the provision of this Regulation. A 321/2015. (X. 30.) Gov. r. Section 6 (2) based on the EEKD format, it is also necessary to indicate which body is eligible for proof of validity.statements, declarations of credentials can not be more timely than the present invocation issue by daylight. SZ.1 .: Reszv. sign. the author. its complete run is unsuitable if it is not included in the 1997 LXVIII. in Section 39 of the Toervens Act, in the Register of Suppliers of Construction Industry, and in the case of a non-resident entertainer established in the country of establishmentogosultsagaval). SZ.2 .: Reszv. sign. the author. its full capacity is unsuitable if it is not listed in the commercial register of a relevant professional chamber in the name of a commercial or merchant service related to the epithets of a busi- ness, or in the case of non-resident operators established in the country of resi- dence, or in a resident countryyou do not have a member or an organizational or chamber member. SZ.1 .: A resident of Mo. in the case of the actors, in the name of the registrar of the epitheting industry, AK is inspected. Host settled in non-Mo. in the case of actors in the state of the country of origin or in the country of resident, authorizations, legal entities or organizationsI, the member of the Chamber of Authors, is attached to this document. SZ.2 .: A resident of Mo. in the case of the actors, AK is checked in the name of the company. Host settled in non-Mo. in the case of actors in the state of the resident country, or in the country of residency in the country of residence, legal status or organizational, please call +39 (0). Section 69 (11) - A - Preamble - P.1 to P.2. The Bidder shall notify the competent body of the application for inclusion in the ESPD declaration (Section IV of the Alfa section). 69. - (4) - (7) of the Law on Appointmentsi will condemn the koezb. documents collected for rogues). P.1. The Applicant shall enclose a certificate issued by each of the custodians of the custody of the custodian in the 321/2015. Government Decree 19 - (1) point (a). Responders will attach a statement to the koezb. with content specified in documents. P.2. Attached to the exam at the end of the examin accordance with the statutes of 321/2015. Government Decree 19 - (1) point (b). If the right of the resident of the resident of the country of origin does not provide for the disclosure of the report, then he / she shall return a statement. (XII.19.) K.r. Article 15 (2) on the basis of the respectable application, the deadline for expiration is allowed2) The resigned applicant must be based on the Kbt.66.-. The reseller may not be able to make an offer in the rescheduling stage. The repository is available for downloading the reseller's request. The bill was documented by a wealthy businessman interestedweek. The supplementary documents may be filed electronically on the internet address specified in point 3 of the advertisement section I.1. 3) In case of a complaint, the applicant must state the following: - Section 65 (7) (including in case of negatives), - the Kbt. Section 66 (6) (a) and (b) (with negative content) Responses to the Respondentplease enclose the following: - the ESPD (packaged), - - the Kbt. Section 66 (5) - in the name of the resident, or in the name of the subdivision or the eligible body of the organization, in the rescheduled application, the sub-prime (authorized to register) the sub-prime or subordinate sub-surgeon sample or the equivalent dokumentum, - in the case of a proxy of his authorized representative, he also contains a prominent proxy holder, a prominent proxy holder, - responsible for the koezb. 4) CA has not been admitted to the public. Section 35 (8) (5) The CA does not apply the Kb. Section 75 (2) e). 6) If you have any questions, please contact usYou will find a full list of the results from the search engine, with the leading indicator (Kbt. Section 35 (6)], the task division shall be conditional upon the declaration that the members are jointly and severally liable for the contractual performance litigation. The mandate should include the fact that the applicant is entitled to submit a copy to the EDF electronically-(7) The CA shall inform the claimants that they have been subject to the most stringent clauses in the list of candidates for a qualified resignation: III.1.1) - III.1.3) 8) In the event of a declaration of invalidity, The AF is not regulated by the koezb. as well as the Kbt, and according to the relevant circulars of the relevant Hungarian legislation. The times defined in the orab will be based on the exact time in Hungary. 9) The main information regarding the aspects of the subject: - adhato point: 0-100; In the case of each case, the score is rounded to the decimal point, - alk. Mods: Artistic aspect of art, qualitative point score. 10) M.2.5.KIF FAM Attestation Certificate: - In the case of: 31st December 2011: FAM Installation Engineer - 01 January 2012 - 31st December 2013 - Engineer: FAM installer with low-speed connection and driver / coins / - on January 01, 2014: Low-voltage connection and koezvi(11) Responsible accreditation in the field of dog breeding: dr. Tasnadi Gabor (00149). 12) The basic justification for this issue is 307/2015. (X.27.) Government Order no. (2) (2) of this Act shall apply the breed variety to AK. Resignation deadline: 2018/07/26 12: 00 Internet address (URL): http://www.eon.hu Directive: Classical Directive (2014/25/EU)
The bid deadline for Contract notice: Construction work for pipelines, communication and power lines was 26 Jul 2018. Bidding is closed.
This tender has been issued by E.ON DÉL-DUNÁNTÚLI ÁRAMHÁLÓZATI ZRT. in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45231000 - Construction work for pipelines, communication and power lines, 71322000 - Engineering design services for the construction of civil engineering works, 71334000 - Mechanical and electrical engineering services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 24435140. The purchaser document reference is 271601-2018.