Expired Tender Poland ICB TOT Ref. 36765118

Contract notice: Construction work for gas Tender - 36765118

Tender notice from Poland, published on 30 Sep 2019.

Exeutive Summary

The POLSKA SPÓ?KA GAZOWNICTWA SP. Z O.O. has issued a Tender notice for the procurement of a Contract notice: Construction work for gas pipelines in the Poland. This Tender notice was published on 30 Sep 2019 and is scheduled to close on 31 Oct 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 36765118, while the tender notice number is 458205-2019 and Register on the platform.

Key facts

Summary
Contract notice: Construction work for gas pipelines
TOT Ref. No.
36765118
Document Ref. No.
458205-2019
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
30 Sep 2019
Bid deadline
31 Oct 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work for gas pipelines
Description: Contract notice: Construction work for gas pipelines
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45231220, 45111200, 45112210, 45110000, 45112100, 45112300, 45233124, 45111240, 45100000, 45112700, 45200000, 45300000, 45255000, 45231220, 45231200, 45342000, 45400000, 45312000, 45315100, 71632200, 45231220, 45111200, 45112210, 45110000, 45112100, 45112300, 45233124, 45111240, 45100000, 45112700, 45200000, 45300000, 45255000, 45231200, 45342000, 45400000, 45312000, 45315100, 71632200
CPV Description: Construction work for gas pipelines.
Site preparation and clearance work.
Topsoil-stripping work.
Building demolition and wrecking work and earthmoving work.
Trench-digging work.
Infill and land-reclamation work.
Trunk road construction work.
Ground-drainage work.
Site preparation work.
Landscaping work.
Works for complete or part construction and civil engineering work.
Building installation work.
Construction work for the oil and gas industry.
Construction work for oil and gas pipelines.
Erection of fencing.
Building completion work.
Alarm system and antenna installation work.
Electrical engineering installation works.
Non-destructive testing services.
Zadanie nr 3A: Budowa SRP I w m. Dąbrowa gm. Masłow Q = 25 000 Nm3/h w ramach przedsięwzięcia inwestycyjnego pn.: „Budowa gazociągu relacji Lubienia Masłow and the Mojcza Kielce gas pipeline "
Reference Number: PSGKI.ZZSP.901.017.19
The subject of the contract is the construction, execution of necessary tests and test start-ups, as well as commissioning of a reduction and measuring station I in Dąbrowa, Masłow commune Q = 25, 000 Nm3 / h constituting Task No. 3A of the investment project entitled "Construction of the Lubie gas pipelineMasł-w and the Mojcza - Kielce gas pipeline (Works), in accordance with the project documentation (Documentation), which will jointly constitute the subject of the order.
Main Site: Area of activity of Polska Społki Gazownictwa Sp. z o.o, Zakład Zakład Gazniczy w Kielce, POLSKA
I. The subject of the contract is the construction, necessary tests and commissioning, as well as commissioning of the stationand reduction and metering I in Dąbrowa, commune Masłow with a capacity of Q = 25, 000 Nm3 / h constituting Task No. 3A of the investment project "Construction of the Lubienia Masłow gas pipeline and the Mojcza - Kielce gas pipeline" in accordance with the design documentation (Documentation), which will jointly constitute the subject of the contract.
1. The basic scope of the contract:
a) Construction of a reduction station- measuring I Q = 25, 000 Nm3 / h in Dąbrowa, commune Masłow with a boiler room, odorization plant, I&C and telemetry along with the development of the station area.
B) Execution of works accompanying the construction.
The subject of the contract should be implemented in accordance with the Documentation, generally applicable provisions and relevant standards, internal regulations in force in Polska Społce Gazownictwa sp.z o.o. onimplementation of the contract, the principles of current technical knowledge and the art of construction, as well as in accordance with applicable regulations and health and safety rules, fire protection regulations, and environmental protection regulations.
2. The scope of the contract does not include:
a) Mounting of PGC 2000 and NGC 8260 chromatographs.
B) Mounting of dew point analyzer.
C) Switching work
3. For the taskand No. 3A, the Employer holds the final building permit decision.
Decision No. 2557/2012 issued by the Staroste of Kielce of 27.12.2012 for the construction of the I Masłow reduction and measuring station Q = 25, 000 Nm3 / h together with the road exit, investment for plots no. 1309/1, 1912 precinct Dąbrowa, commune Maslov.
II. Detailed Description of the Subject of the Contract, Contractor's obligations, material requirements andfor fittings and other terms and conditions for the performance of the contract constituting the specification of this Description of the Object of the Order are in Annex 1 to the ToR (DETAILED DESCRIPTION OF THE SUBJECT OF THE CONTRACT AND THE CONTRACTOR'S OBLIGATIONS), while being Annex 1 to the contract template.
III. The awarding entity envisages the possibility of awarding orders referred to in art. 134 section 6 item 3 of the Actexceeding 10% of the value of the basic order. As part of the orders referred to in art. 134 section 6 point 3 of the Act, the Awarding Entity provides for similar construction works to the extent provided for under the basic contract. Contracts involving the repetition of similar construction works will be awarded if there is a justified need to repeat construction work in the field ofas part of the basic order, in the event of actual or legal obstacles in the framework of the implementation of the basic order. or customizefor any new needs that may arise during the implementation of the task.
IV. In accordance with art. 93 item 1a. of the Act, may cancel the procurement procedure if the funds from the European Union budget and non-refundable funds from the assistance granted by the member states of the European Free Trade Agreement (EFTA), which the Employer ordersintended to finance all or part of the contract, they were not awarded.
V. The ordering party informs that in accordance with art. 30b of the Act, if the Employer requires the presentation of a certificate issued by a conformity assessment body or test reports carried out by that body as evidence to prove compliance with the requirements or characteristics specifiedand in the description of the subject of the contract, criteria for the evaluation of the offers or the conditions of the contract, the Employer also accepts certificates issued by other equivalent conformity assessment bodies.
More information in the ToR.
I. Contractors who can apply for the contract:
1. are not excluded,
2. meet the following conditions for participating in the procedure:
2.1. have tec skillstechnical and professional - specified in section III.1.3) announcements
2.2. are in an appropriate economic and financial situation - as specified in section III.1.2) of the advertisement
Assessment of compliance with the abovementioned the conditions will be made in accordance with the formula "meets does not meet", based on information contained in JEDZ, statements and documents to be provided by the Contractor to confirm compliance with the conditionsow to participate in the proceedings.
II. The Employer excludes Contractors from the contract award procedure on the basis of the conditions specified in art. 24 paragraph 1 point 12) - 23) of the PPL and in art. 24 paragraph 5 points 1) and 8) Public Procurement Law, subject to art. 133 section 4 Public Procurement Law and art. 24 paragraph 7-12 Pzp.
III. List of declarations and documents to be provided by the Contractor to confirm compliance with the conditions for participation in the proceedingsand u and no exclusion grounds.
1. Documents and statements submitted with the offer by all Contractors:
1.1. Tender form, prepared in accordance with the content of Annex 2 to the ToR.
If several tenderers submit joint bid for the contract (consortium), please indicate all entities included in the consortium, with the indication of the Proxy (Leader) Consortium.
1.2. Proof of payment of the bid security, in accordance with point 10. SIWZ.
1.3. Power of attorney pursuant to item 12.6 12.7 of the ToR (if applicable).
1.4. Third party obligation to make resources available according to Annex 7 to the ToR (if applicable)
1.5. Statement / statements valid as at the day of submitting bids to the extent indicated in the ToR in the formula of the Single European Procurement Document(EAT).
1.6. The offer with attachments, including declarations submitted in the form of a single document and the declaration indicated in item 8.2. ToR and documents referred to in points 8.3., 8.13. and 10 of the Terms of Reference, the Contractor submits in compliance with the requirements specified in points 8.4. 8.11 of the SETC. The remaining documents shall be submitted by the Contractor at the request of the Employer.
2. Declaration of belonging or notbelonging to the same capital group, submitted by all Contractors within 3 days from the date of placing by the Employer on the website information referred to in art. 86 section 5 of the Act, i.e. information from the opening of offers. A specimen declaration is attached as Annex 10 to the ToR.
3. Contractor who relies on the resources of other entities to demonstrate a lack of existence towardsthe grounds for exclusion and fulfillment, to the extent that reference is made to their resources, conditions for participation in the proceedings, also submits uniform documents regarding these entities, prepared in electronic form and bearing a qualified electronic signature by the entity to which the documents relate - subject to the requirements specified in points 8.4 8.11 of the SETC.
4. Single documentis administered, in accordance with the template of the standard form set out in the European Commission implementing regulation issued on the basis of art. 59 clause 2 of Directive 2014/24 / EU and art. 80 deg. 3 of Directive 2014/25 / EU. A template of the standard uniform document form is available on the Awarding Entity's website at https://zamowienia.psgaz.pl in the procedure in question.
5. Offertogether with attachments including the Single Document should be prepared and submitted under pain of nullity in an electronic form with a qualified electronic signature, via the PSG Purchasing Platform.
Due to technical limitations, more information is contained in the ToR.
1. Contractors who are in an appropriate economic situation may apply for the contractej and financial, i.e. they have financial resources or creditworthiness of not less than 2 million. PLN.
The Contractor to prove compliance with this condition will provide information from the bank or cooperative savings and credit union confirming the amount of financial resources or creditworthiness of the Contractor, no earlier than 1 month before the expirydeadline for submission of bids.
In the case of the most advantageous bid at the request of the Employer, the Contractor shall submit the document required in point 8.20.10. Terms of Reference.
2. In order to pre-confirm the fulfillment of the conditions for participation in the procedure specified in item 6.1.2. ToR, the Contractor submits the relevant statement in part IV, section α of the Single European Procurement Document (EAT form). Employer regardingindicates that the Contractor may limit himself to completing only section α in Part IV of the Single European Procurement Document, then he must not complete any of the other sections (A, B, C, D) in Part IV EAT, because the Employer will assume that the Contractor has confirmed compliance all required conditions for participation in the procedure (selection criterion) specified in chapter VI of the ToR.
3. WITHthe contracting authority may, at any stage of the proceedings, consider that the Contractor does not have the required capacities if the involvement of the Contractor's technical or professional resources in other economic activities of the Contractor may have a negative impact on the performance of the contract.
4. The Contractor may, in order to confirm compliance with the conditions for participation in the procedure, in appropriate situations and in relation to particularof an ethical contract, or part thereof, rely on the technical or professional capacity or financial or economic situation of other entities, regardless of the legal nature of the legal relations with it.
5. The Contractor, which relies on the abilities or situation of other entities, must prove to the Employer that in carrying out the contract he will have the necessary resources of these entitiesin particular, presenting the undertaking of these entities to make available to him the necessary resources for the purposes of the contract, prepared in accordance with the template constituting Annex 7 to the ToR.
X
Cd. point III.1.3) announcement regarding point 1.2.:
WARNING !
1) The Awarding Entity will consider the fulfillment of the conditions listed in point 6.1.2.1.2 ToR under the letter d) and f) also in the case of having the required cropsnt by the same person.
2) The Awarding Entity shall consider the fulfillment of the conditions listed in item 6.1.2.1.2 ToR under the letter g), j), l), n) also in the case of having the required qualifications by the same person.
3) The Awarding Entity will consider the fulfillment of the conditions listed in point 6.1.2.1.2 ToR under the letter h), i), k), m), also in the case of having the required qualifications by the same person.
4) The Purchaser will considerfor meeting the conditions listed in point 6.1.2.1.2 of the ToR under the letter d), f), o), also in the case of having the required qualifications by the same person.
5) The Awarding Entity will consider the fulfillment of the conditions listed in point 6.1.2.1.2 SIWZ under the letter b) and from p) to u) also in the case of possession of the required qualifications by the same person, provided that the requirements specified in the ToR have been met
6) Employerknows for fulfilling the condition listed in point 6.1.2.1.2 of the ToR under the letter i), if the Contractor has demonstrated the rights indicated in point 6.1.2.1.2. letters g) or h) by more than one person.
7) The Awarding Entity considers the fulfillment of the conditions listed in item 6.1.2.1.2 ToR under the letter from p) to u) also in the case of having the required qualifications by the same person, providedmeeting the requirements set out in the ToR.
8) In other cases, the Purchaser will not consider the fulfillment of the conditions if the required person has the required rights.
I. Zam. before awarding the order, request a copy of which the offer has been highest rated to be submitted within a designated period not shorter than 10 days, valid on the day of submitting the following statements or documentarticles confirming the circumstances referred to in art. 25 paragraph 1 of the Act:
1. Information from the KRK in the scope specified in art. 24 paragraph 1 item 13, 14 and 21 of the Act, issued not earlier than 6 months before the submission deadline.
Subject to the content of art. 133 section 4 of the Act, Wyk. Is not subject to exclusion in the case referred to in art. 24 paragraph 1 point 13 lit. d, and in the case in questionin art. 24 paragraph 1 point 14, if the person referred to in this provision has been convicted of an offense listed in art. 24 paragraph 1 point 13 lit. d.
2. Certificate of the competent US Head of Department requirements. described in item 8.20.2 of the Terms of Reference
3. The certificate of the relevant field organizational unit of ZUS or KRUS requires details. described in item 8.20.3 of the Terms of Reference
4. Extract from the relevant register or from CEIDG for the purposes ofassertion of no grounds for exclusion pursuant to Article 24 (1) 5 point 1 of the Act, a requirement of detail. described in item 8.20.4 of the Terms of Reference
Ref. point. I.1-4 - If the offer is submitted by several Lectures jointly applying for the award of the contract and the Consortium, the requirement to submit a document applies to each of them, as well as subcontractors and entities for resources to which the reference is made. Declaration of absenceissuing a final court judgment against him or making a final administrative decision on late payment of taxes, fees or insurance premiums. Social or health requirements. described in item 8.20.5 of the ToR
6. Declaration of the lack of a judgment against him as a preventive measure forbidding public procurement - requirement of details. described in item 8.20.6 of the Terms of Reference
7. StatementCol. on non-payment of local taxes and fees, referred to in the Act of 12.01.1991 on local taxes and fees - requirement of detail. described in item 8.20.7 of the Terms of Reference
Ref. point. I.5-7-Statements may be submitted according to the model specified in Annex No. 3 to the Terms of Reference. If the offer is submitted by several Lectures jointly applying for the award of the contract and Consortia, the requirement to submit a Statementzenia according to the Annex No. 3 applies to each of them, as well as subcontractors and entities on resources which are referenced by Chart
8. List of persons-requirements detailed in item 8.20.8 of the ToR.
9. List of construction works - a requirement described in detail in item 8.20.9 of the Terms of Reference
Dot. points I.8-9-In the event that several offers are jointly applying for a contract, the requirement to submit a doc. applies to Ex.
10 only. infbank statement or cooperative savings and credit union - the requirement is described in detail in item 8.20.10 of the Terms of Reference
11. Certificate that the product has a recognized (qualified) arc welding technology in accordance with the PN-EN ISO 15614-1 (PN-EN 288-3), PN-EN ISO 15613 or PN-EN 288-9 standards or equivalent requirements of the details. described in item 8.20.11 of the Terms of Reference
12. Certificate of an independent entity dealing with the requestensuring compliance of the actions of Wyk with the PN-EN ISO 9001 standard or equivalent - a detailed requirement described in point 8.20.12 of the ToR
13. Certificate of compliance of the management system with the requirements of the PN-EN ISO 3834-2 or PN-EN ISO 3834-3 standard or equivalent or a certificate of compliance with this standard - a requirement. described in item 8.20.13 of the Terms of Reference
14. Test Laboratory Recognition Certificate issued by an independent engaging entityconfirming compliance with the PN-EN ISO / IEC 17025 standard or equivalent - a requirement. described in point 8.20.14 of the Terms of Reference
15. Certificate of an independent entity dealing with the certification of compliance with actions. Schedule PN-EN ISO 9001 or equivalent - requirement described in item 8.20.15 of the Terms of Reference
16. Accreditation issued by the Polish Center for Accreditation in the field of research - requirement details. described in point 8.20.16 SIWZ
17. Document confirming the permission for the use, transport and storage of gamma and X-ray devices - requirement of the details. described in item 8.20.17 of the ToR
Internet address (URL): www.psgaz.pl

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work for gas pipelines was 31 Oct 2019. Bidding is closed.

This tender has been issued by POLSKA SPÓ?KA GAZOWNICTWA SP. Z O.O. in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45231220 - Construction work for gas pipelines, 45111200 - Site preparation and clearance work, 45112210 - Topsoil-stripping work, 45110000 - Building demolition and wrecking work and earthmoving work, 45112100 - Trench-digging work, 45112300 - Infill and land-reclamation work, 45233124 - Trunk road construction work, 45111240 - Ground-drainage work, 45100000 - Site preparation work, 45112700 - Landscaping work, 45200000 - Works for complete or part construction and civil engineering work, 45300000 - Building installation work, 45255000 - Construction work for the oil and gas industry, 45231200 - Construction work for oil and gas pipelines, 45342000 - Erection of fencing, 45400000 - Building completion work, 45312000 - Alarm system and antenna installation work, 45315100 - Electrical engineering installation works, 71632200 - Non-destructive testing services.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 36765118. The purchaser document reference is 458205-2019.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.