Contract notice: Construction work for gas Tender - 31129264
Tender notice from Poland, published on 28 Feb 2019.
Exeutive Summary
The POLSKA SPÓ?KA GAZOWNICTWA SP. Z O.O. has issued a Tender notice for the procurement of a Contract notice: Construction work for gas pipelines in the Poland. This Tender notice was published on 28 Feb 2019 and is scheduled to close on 03 Apr 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 31129264, while the tender notice number is 096392-2019 and Register on the platform.
Key facts
Summary
Contract notice: Construction work for gas pipelines
Object of the contract Construction work for gas pipelines Description: Contract notice: Construction work for gas pipelines Authority Type: Utilities entity Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45231220, 45111200, 45112210, 45110000, 45112100, 45112300, 45233124, 45111240, 45100000, 45112700, 45200000, 45300000, 45255000, 45231220, 45231200, 45342000, 45400000, 45312000, 45315100, 71632200, 45231220, 45111200, 45112210, 45110000, 45112100, 45112300, 45233124, 45111240, 45100000, 45112700, 45200000, 45300000, 45255000, 45231200, 45342000, 45400000, 45312000, 45315100, 71632200 CPV Description: Construction work for gas pipelines. Site preparation and clearance work. Topsoil-stripping work. Building demolition and wrecking work and earthmoving work. Trench-digging work. Infill and land-reclamation work. Trunk road construction work. Ground-drainage work. Site preparation work. Landscaping work. Works for complete or part construction and civil engineering work. Building installation work. Construction work for the oil and gas industry. Construction work for oil and gas pipelines. Erection of fencing. Building completion work. Alarm system and antenna installation work. Electrical engineering installation works. . Non-destructive testing services. . Task # 1 - reconstruction of SRP and Zygmuntowka Q = 9, 000 Nm / h as part of the investment project called. "Construction of a gas pipeline relationand Sandomierz - Ostrowiec Świętokrzyski "- sectoral order - Reference Number: PSGKI.ZZSP.901.003.19 The subject of the order is the reconstruction, making necessary checks and commissioning and commissioning of the reduction and measurement station I with a capacity of Q = 9, 000 Nm / h constituting Task no. 1 of the investment project entitled "Construction of the Sandomierz - Ostrowiec Świętokrzysk gas pipelineand "(Robots), in accordance with the design documentation (Documentation), which will be the subject of the order. Main Site: The investment will be carried out in Ostrowiec Świętokrzyski, Ostrowiecki District, Ostrowiec Świętokrzyski commune 1 The subject of the order is reconstruction, making necessary checks and commissioning and commissioning of a pressure reduction and measuring station IQ = 9, 000 Nm / h constituting Task No. 1 of the investment project entitled "Construction of the Sandomierz-Ostrowiec Świętokrzyski gas pipeline" (Works), in accordance with the design documentation (Documentation), which will jointly constitute the subject of the order. X 2 The subject of the orders includes in particular the construction of the reduction and measurement station IQ = 9, 000 Nm / h at Zygmuntowka St. in Ostrowiec Świętokrzyskim with a boiler room, odorization plant, AKPiA and telemetry together with the development of the station area. X 3. Details of the subject of the Order, obligations of the Contractor, material and fittings requirements and other conditions and rules for the implementation of the order constituting the materialization of this Description of the Subject of the Order can be found in Appendix No. 1 to the ToR (Detailed description of the subject of the order and mandatoryin the contractor), being at the same time Annex No. 1 to the contract template. X 4. The contracting authority provides for the possibility of ordering, referred to in art. 134 sec. 6 point 3 of the Act not exceeding 10% of the value of the basic order. As part of the orders referred to in art. 134 sec. 6 point 3 of the Act, the Contracting Authority provides for similar construction works within the scope provided for under the basic ordero. Orders that reimburse similar construction works will be granted if there is a justified need to repeat construction works to the extent provided for under the basic order, in the case of actual or legal obstacles in the implementation of the basic order. construction OrderIt will recognize, among other things, such as: assembly of additional elements in the station or in technological systems at the station improving the functionality of the facility or adapting it to possible new needs that may appear during the task. X 5. Due to technical limitations, unlimited, full and direct access to information contained in the ToR, you can getfree of charge at: https://zamowienia.psgaz.pl / public proceedings No. PSGKI.ZZSP.901.003.19 I. The Contractors, who: 1, may apply for the order. they are not subject to exclusion, 2. meet the following conditions for participation in the proceedings: 2.1. have technical and professional abilities - specified in section III.1.3) of the announcement, 2.2. they are in the right economic situation and financy - specified in section III.1.2) of the announcement - The assessment of fulfillment of the above mentioned conditions will be made in accordance with the formula "meets not fulfilling", based on information contained in EED, statements and documents to be provided by the Contractor to confirm fulfillment of conditions participation in the proceedings. X From the proceedings for the award of the contract, the Contracting Authority excludes Contractors based on themows specified in art. 24 sec. 1 point 12) - 23) PPL and art. 24 sec. 5 points 1) and 8) of the PPL, subject to art. 133 ust. 4 Pzp and art. 24 sec. 7-12 Pzp. X II. A list of statements and documents to be provided by the Contractor in order to confirm that the conditions for participation in the procedure have been met and no grounds for exclusion have been met. Documents and declarations submitted together with the offer by all Contractors: 1.1.The offer form, prepared in accordance with Annex 2 to the SETC. In the event that the offer is submitted by several Contractors jointly applying for the order (Consortium), please indicate all entities included in the consortium, indicating the Proxy (leader) of the Consortium. 1.2 . Proof of payment of the bid security in accordance with item 10. SIWZ. 1.3. Power of attorney, in accordance with item 12.6 12.7SIWZ (if applicable). 1.4. Obligation of a third party to make available resources according to Annex No. 11 to the ToR (if applicable). 1.5. Actual statement / statements on the day of submitting the offers in the scope indicated in this ToR in the formula of the Single European Order Document (EED). 1.6. Offer with attachments, including statements made in the form of a single documentand the statement indicated in point 8.2. Terms of Reference and documents referred to in points 8.3., 8.13. and 10 of the SIWZ, the Contractor submits the requirements specified in sections 8.4. 8.11 SIWZ. The Contractor shall submit other documents to the ordering party's request. 2. Declaration of belonging or non-affiliation to the same capital group, submitted obligatorily by all Contractors3 days from the date of placing by the Employer of the information on the website referred to in art. 86 par. 5 of the Act, i.e. information from the opening of offers. 3. The Contractor who refers to the resources of other entities in order to demonstrate the absence of grounds for exclusion and fulfillment in relation to them, in the scope in which he relies on their resources, the condition of participation in the proceedings, also submits the uniforme documents relating to these entities, prepared in electronic form and bearing a qualified electronic signature by the entity the documents refer to - while complying with the requirements specified in clauses 8.4.8.11 of the ToR. 4. The single document is prepared in accordance with the standard form provided for in the European Commission executive regulation issued on the basis of art. 59 par. 2 of Directive 2014/24 / EU and art. 80 st. 3 of Directive 2014/25 / EU. A template of a standard form of a single document is available on the Employer's website at https://zamowienia.psgaz.pl in the proceedings under number PSGKI.ZZSP.901.003.19. 5. The offer together with attachments including a single document should be prepared and submitted under pain of nullity in the electronic form of thewith a qualified electronic signature, via the PSG Procurement Platform. 6. To submit an offer with attachments including a single document, log in to the PSG Procurement Platform at: https://zamowienia.psgaz.pl. If the Contractor does not remember the password, he must use the "Password Recovery" form before logging into the system. Contractors who do notthey have accounts in the PSG Procurement Platform. They make their own registration. More in the SIWZ. 1. Contractors who are in the right economic and financial situation, ie 1.1, can apply for the contract. they have financial resources or creditworthiness in the amount not less than PLN 2, 000, 000 (say: two million zlotys). In the case of the most advantageous offer atOrdering Party, the Contractor will present the document required in point 8.20.10. SIWZ tj.Information of the bank or cooperative savings and credit fund confirming the possession of funds or creditworthiness of the Contractor, in a period not earlier than 1 month before the deadline for submission of bids, confirming the fulfillment of the condition specified in section 6.1.2.2. Terms of Reference. [content above oproclaim the]. 2 X. For the purpose of preliminary confirmation of compliance with the conditions for participation in the procedure set out in point 6.1.2. The Contractor, the Contractor submits the appropriate statement in Part IV section α of the Single European Order Document (form EAT). The Contracting Party indicates that the Contractor may confine himself to filling only the section α in part IV of the Single European Order Document, wowczas does not have to fill in any of the other sections (A, B, C, D) in Part IV of the EAT, because the Employer will accept that the Contractor has confirmed that all required conditions for participation in the procedure (eligibility criterion) set out in this chapter of the SIWZ have been met. X 3 . The Contractor may, in order to confirm compliance with the conditions of participation in the proceedings, in relevant situations and with reference to kthe inert order, or its part, rely on the technical or professional capacity or financial or economic situation of other entities, regardless of the legal nature of the legal relationship that it has with it. 4. The Contractor, who relies on the abilities or situation of other entities, must prove to the Employer that while performing the order he will have the necessary resources of thoseentities, in particular by presenting the obligation of these entities to put at the disposal of the necessary resources for the needs of the order, prepared according to the template constituting Annex No. 11 to the ToR. 5. The Contracting Authority assesses whether the technical or professional capacity or their financial or economic situation made available to other entities by Contractors allows the Contractor to demonstratethe conditions for exclusion referred to in clause 7 of the ToR. 6. The Contractor, who relies on the economic and financial situation of other entities, is jointly and severally liable with the entity that committed to provide resources for the damage suffered by the Employer arising as a result of not sharing these resources, He does not blame for failing to supply resources. The Ordering Party, prior to the order being awarded, will call the Contractor whose offer has been best assessed, to submit within the prescribed, not shorter than 10 days, the current date as of the date of submitting the below statements or documents confirming the circumstances of which referred to in art. 25 para. 1 of the Act: 1. Information from the NQF in the scope specifiedm in art. 24 sec. 1 items 13, 14 and 21 of the Act, (...) Subject to the content of art. 133 ust. 4 of the Act - in accordance with point 8.20.1 SIWZ 2. Certificate of the competent head of the tax office - in accordance with point 8.20.2 SIWZ 3. The certificate of the relevant ZUS or KRUS organizational unit - in accordance with item 8.20.3 of the SETC 4. A copy from the relevant register or from CEIDG, to confirm the absence of exclusion groundspursuant to art. 24 sec. 5 point 1 of the Act - in accordance with item 8.20.4 of SIWZ 5. Declaration of the Contractor about the lack of issuing a final court judgment or final administrative decision on default of payment of taxes, fees or social security or health insurance premiums, or - in the event of such a judgment or decision (...) - in accordance with point 8.20.5 of the Terms of Reference 6. Contractor's declarationy about the lack of a ruling against him as a preventive measure of the prohibition against applying for public orders (...) - in accordance with item 8.20.6 of the SETC 7. Contractor's statement about not paying taxes and local fees - in accordance with item 8.20.7 of the SETC 8. List of persons - in accordance with item 8.20.8 of the ToR - to confirm the condition set out in point. 6.1.2.1.2 SIWZ [III.1.3) announcements] 9. List of robot with attachmentevidence - in accordance with item 8.20.9 of the ToR - to confirm the condition specified in item 6.1.2.1.1. SIWZ [III.1.3) announcements] 10. Information of a bank or cooperative savings and credit union confirming the possession of financial resources or creditworthiness of the Contractor (...) - in accordance with point 8.20.10 of the ToR - to confirm the condition set out in point. 6.1.2.2 SIWZ [III.1.2) announcements] 11. CertificatesNot that the Contractor has a recognized (qualified) arc welding technology (...) - in accordance with point 8.20.11 of the ToR - to confirm the condition specified in paragraph 6.1.2.4. a) SIWZ 12. Certificate of an independent entity that certifies compliance of the Contractor's activities with the PN-EN ISO 9001 standard or equivalent (for the scope of the works covered by this specification) (...) - in accordance with item 8.20.12 of the Terms of Reference- to confirm the condition set out in point 6.1.2.1.4 lit. b) SIWZ 13. Certificate of an independent entity that certifies compliance of the Contractor's activities with the PN-EN ISO 3834-2 standard or equivalent (for the scope of the work covered by this specification) (...) - in accordance with item 8.20.13 of the ToR - to confirm the condition set out in point 6.1.2.1.4 lit. c) SIWZ 14. Certificate of Recognition of the LaboratoryResearch (...) - in accordance with item 8.20.14 - to confirm the condition specified in point 6.1.2.1.3 lit. a) SIWZ 15. Certificate of an independent entity that certifies compliance of the Contractor's activities with the PN-EN ISO 9001 standard or equivalent (within the scope of tests covered by this specification) (...) - in accordance with item 8.20.15 of the ToR - to confirm the condition set out in point 6.1.2.1.3 lit. b) SIWWith 16. Accreditation issued by the Polish Center for Accreditation (...) - in accordance with item 8.20.16 of the Terms of Reference for confirmation of the condition specified in point. 6.1.2.1.3 lit. c) SIWZ 17. Document confirming the authorization to use, transport and store gammagrafic and X-ray equipment, including the permission to use radioactive sources to confirm compliance with the condition set out in point6.1.2.1.3 lit. d) SIWZ. - in accordance with item 8.20.17 of the ToR - to confirm the condition set out in point 6.1.2.1.3 lit. d) SIWZ Note: The Contractor submits the documents referred to in points 8.20.11 to 8.20.17 also for subcontractors, which the Contractor intends to entrust the execution of works, which relate to the conditions for participation in the proceedings, indicated in point. 6.1.2.1.3 lit. a), b) c) and d) and in pkt 6.1.2.1.4 litas a), b) and c) SIWZ. More in the SIWZ. Internet address (URL): www.psgaz.pl
The bid deadline for Contract notice: Construction work for gas pipelines was 03 Apr 2019. Bidding is closed.
This tender has been issued by POLSKA SPÓ?KA GAZOWNICTWA SP. Z O.O. in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45231220 - Construction work for gas pipelines, 45111200 - Site preparation and clearance work, 45112210 - Topsoil-stripping work, 45110000 - Building demolition and wrecking work and earthmoving work, 45112100 - Trench-digging work, 45112300 - Infill and land-reclamation work, 45233124 - Trunk road construction work, 45111240 - Ground-drainage work, 45100000 - Site preparation work, 45112700 - Landscaping work, 45200000 - Works for complete or part construction and civil engineering work, 45300000 - Building installation work, 45255000 - Construction work for the oil and gas industry, 45231200 - Construction work for oil and gas pipelines, 45342000 - Erection of fencing, 45400000 - Building completion work, 45312000 - Alarm system and antenna installation work, 45315100 - Electrical engineering installation works, 71632200 - Non-destructive testing services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 31129264. The purchaser document reference is 096392-2019.