Expired Tender Poland ICB TOT Ref. 29333765

Contract notice: Construction work for gas Tender - 29333765

Tender notice from Poland, published on 19 Dec 2018.

Executive Summary

The POLSKA SPÓ?KA GAZOWNICTWA SP. Z O.O. has issued a Tender notice for the procurement of a Contract notice: Construction work for gas pipelines in the Poland. This Tender notice was published on 19 Dec 2018 and is scheduled to close on 25 Jan 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 29333765, while the tender notice number is 559491-2018 and Register on the platform.

Key facts

Summary
Contract notice: Construction work for gas pipelines
TOT Ref. No.
29333765
Document Ref. No.
559491-2018
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
19 Dec 2018
Bid deadline
25 Jan 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work for gas pipelines
Description: Contract notice: Construction work for gas pipelines
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45231220, 45111200, 45112210, 45110000, 45112100, 45112300, 45233124, 45111240, 45100000, 45112700, 45200000, 45300000, 45255000, 45231220, 45342000, 45400000, 71632200, 45231200, 45231220, 45111200, 45112210, 45110000, 45112100, 45112300, 45233124, 45111240, 45100000, 45112700, 45200000, 45300000, 45255000, 45342000, 45400000, 71632200, 45231200
CPV Description: Construction work for gas pipelines.
Site preparation and clearance work.
Topsoil-stripping work.
Building demolition and wrecking work and earthmoving work.
Trench-digging work.
Infill and land-reclamation work.
Trunk road construction work.
Ground-drainage work.
Site preparation work.
Landscaping work.
Works for complete or part construction and civil engineering work.
Building installation work.
Construction work for the oil and gas industry.
Construction work for oil and gas pipelines.
Task 4: Construction of high-pressure gas pipelines: DN 500 and DN 300 together with the accompanying infrastructure as part of the investment project called "Construction of the Sandomierz-Ostrowiec Świętokrzyski gas pipeline"
Reference Number: PSGKI.ZZSP.901.021.18
The subject of the order is construction, execution of necessary checks and start-ups, and putting into service of high-pressure gas pipelines; DN 500 with a length of approximately 9.42 km and DN 300 with a length of approximately 3.08 km together with the accompanying infrastructure constituting task no. 4 of the investment project called. "Construction of the Sandomierz - Ostrowiec Świętokrzyski gas pipeline" (Robots), in accordance withwith project documentation (Documentation), which in total will be the subject of the order.
Main Site: Area of operation of Polska Społka Gazownictwa Sp. z o.o., Oddział Zakład Gazowniczy w Kielcach
1. The subject of the order includes in particular:
1.1. construction of a high-pressure gas pipeline DN 500 PN 6.3 MPa, MOP 6.0 MPa with a length of about 9.42 km,
1.2. construction of a high-pressure gas pipeline DN 300 PN 6.3MPa, MOP 6.0 MPa, approximately 3.08 km long,
1.3. construction of shut-off and relief system "Zakład Porcelany Ćmielow" on high pressure gas pipeline PN 6.3 MPa, MOP 6.0 MPa DN 500,
1.4 construction of high pressure gas pipeline PN 6.3 MPa; MOP 6.0 MPa DN 80 with length approx. 707 meters, supplying the plant Porcelain Ćmielow,
1.5th pipeline construction for fiber optic cable routing to technical ogas pipeline service along with branches about 26.57 km long,
1.6. implementation of the cathodic protection system.
2. Details of the subject of the Order, obligations of the Contractor, material and fittings requirements and other conditions and terms of ordering constituting the content of this Description of the Subject of the Order can be found in Appendix No. 1 to the ToR (Detailed description of the subject of the contractand the Contractor's obligations), at the same time being Annex No. 1 to the model contract.
3. The Contracting Authority provides for the possibility of ordering referred to in art. 134 sec. 6 point 3 of the Act not exceeding 10% of the value of the basic order. As part of the orders referred to in art. 134 sec. 6 point 3 of the Act, the Contracting Authority provides for similar construction works on the section provided for under the contractprimary element. Orders that reimburse similar construction works will be granted if there is a justified need to repeat the construction works on the section provided for under the basic order, if there are actual or legal obstacles to the implementation of the basic order.The Purchaser will, among other things, recognize the implementation of an additional shutdown / bleed unit, the implementation of an additional system with a section of the gas pipeline or connection to a potential new customer.
4. According to art. 93 para. 1a. The Ordering Party may annul the procedure for awarding the order if the funds from the European Union budget and non-refundable funds from theThe European Free Trade Agreement (EFTA) granted by Member States, which the Employer intended to allocate to finance all or part of the order, was not granted to him.
Due to technical limitations, unlimited, full and direct access to information contained in the Terms of Reference can be obtained free of charge at: https://zamowienia.psgaz.pl / proceedings punumber nr PSGKI.ZZSP.901.021.18
I. The Contractors, who:
1, may apply for the order. they are not subject to exclusion,
2. meet the following conditions for participation in the proceedings:
2.1 have technical and professional capacity - specified in section III.1.3) of the announcement,
2.2. they are in the appropriate economic and financial situation - specified in section III.1.2) of the ad/ in the conditions will be made in accordance with the formula "meets not fulfilling", based on the information contained in EAT, statements and documents to be provided by the Contractor to confirm the fulfillment of conditions for participation in the procedure.
X
From the proceedings for awarding the contractor excludes Contractors on the basis of the prerequisites specified in Article 24 paragraph 1 point 12) - 23) PPL and in Article 24 of the Actvol. 5 point 1) and 8) of the PPL, subject to art. 133 ust. 4 Pzp and art. 24 sec. 7-12 Pzp.
X
II. A list of statements and documents to be provided by the Contractor to confirm that the conditions for participation in the procedure have been met and no grounds for exclusion. Documents and statements submitted together with the offer by all Contractors:
1.1. The offer form, prepared in accordance with Annex 2 to SIWZ.
In the event that the offer is submitted by several Contractors jointly applying for the award (Consortium), please indicate all entities included in the consortium, indicating the Proxy (leader) of the Consortium.
1.2. Proof of payment of the bid security in accordance with item 10. SIWZ.
1.3. Power of attorney, in accordance with item 12.6 12.7 of the ToR (if applicable).
1.4. Obligation of a third party to make availablethe provisions of Annex 11 to the ToR (if applicable).
1.5. Actual statement / statements on the day of submitting bids in the scope indicated in this ToR in the form of a single document.
1.6. The offer, including attachments, including statements made in the form of a single document and the statement indicated in point 8.2. ToR and documents referred to in points 8.3., 8.13. and 10 SIThe Contractor submits WZ compliance with the requirements specified in sections 8.4. 8.11 SIWZ. The Contractor shall submit other documents to the Ordering Party's request.
2. Declaration of belonging or non-affiliation to the same capital group, submitted obligatorily by all Contractors within 3 days from the date of placing by the Employer of the information on the website, referred to in art. 86 par. 5 of the Act, i.e. information from the opening of tenders.
Contractor, within 3 days from the date of posting on the website https://zamowienia.psgaz.pl in the subject proceedings, information referred to in art. 86 par. 5 of the Act, i.e. information from the opening of offers, provides the Employer with a declaration of belonging or non-affiliation to the same capital group as referred to inArt. 24 sec. 1 point 23 of the Act. With the submission of a statement, the Contractor may submit documents or information confirming that connections with another Contractor do not lead to distortion of competition in the procurement procedure. The single document shall be drawn up in accordance with the specimen of the standard form set out in the European Commission Implementing Regulation based onArt. 59 par. 2 of Directive 2014/24 / EU and art. 80 st. 3 of Directive 2014/25 / EU. A template of a standard form of a single document is available on the Employer's website at https://zamowienia.psgaz.pl in the proceedings on the PSGKI number. ICZM. 901.021.18
4. In the case of joint application for contractors, a single document shall be submitted by each of the contractors jointlyapplying for the order while maintaining the requirements specified in section 8.4. 8.11.
5. The offer with attachments including the Single Document should be prepared and submitted under pain of nullity in an electronic form with a qualified electronic signature, via the PSG Procurement Platform.
X
Due to technical limitations, more information is contained in the ToR.
1. Oh, thank youThe contractors who are in the appropriate economic and financial situation can apply for contracting, i.e. they will demonstrate that: 6.1.2.2.1. they have financial resources or creditworthiness of no less than 6 million. PLN (say: six million zlotys), the Contractor will provide information from a bank or cooperative savings bank to prove the fulfillment of this conditiona loan confirming the amount of funds held or the creditworthiness of the Contractor, issued in a period not earlier than one month before the deadline for submission of tenders. In order to confirm the fulfillment of the conditions for participation in the proceedings referred to in point 6.1.2. The Contractor, the Contractor submits an appropriate statement in part IV section α of the Single European Document Z(the EAT form). The Contracting Party indicates that the Contractor may limit himself to completing only the section α in Part IV of the Single European Order Document, he then does not have to fill in any of the other sections (A, B, C, D) in Part IV EAT, as the Employer accepts that the Contractor has confirmed all required conditions for participation in the procedure are met (criteria for qualification)(c) referred to in Chapter VI of the ToR.
3. The Awarding Entity may, at any stage of the proceedings, consider that the Contractor does not have the required capacities if the involvement of technical or professional resources of the Contractor in other economic undertakings of the Contractor may have a negative impact on the implementation of the order. The Contractor may confirm the fulfillment of the conditions for participation in the proceedings, as appropriateand in relation to a particular contract, or a part thereof, rely on the technical or professional capacity or financial or economic situation of other entities, regardless of the legal nature of the legal relationship that it has with it.
5. The Contractor, who relies on the abilities or the situation of other entities, must prove to the Employer that while implementing the order will be dhe presented the necessary resources of these entities, in particular by presenting the obligation of these entities to give him the necessary resources for the needs of the order, prepared according to the template constituting Annex No. 11 to the SETC.
6. The Awarding Entity assesses whether the technical or professional capacity or their financial or economic situation is made available to the Contractor by other entities, for the Contractor to demonstrate compliance with the conditions of participation in the proceedings and examine whether there is any ground of exclusion regarding this subject, referred to in clause 7 of the ToR.
7. The contractor, which relies on the economic or financial situation of other entities, is jointly and severally liable with the entity that has committed to provide resources for the damage incurred by the Ordering Party arising from theutek not making these resources available, unless it is not blamed for not sharing the resources.
X
I. If the Lecturer has his registered office or place of residence outside the territory of the Republic of Poland, he shall submit the documents referred to in - 7 of the Regulations. MINISTER OF DEVELOPMENT of 26.07.2016 on the types of documents that may be requested by Zam. from the lecture in the proceedings for the order (Dz.U.2016.1126 dated 27/07/2016), which states that
"1. If Lecture has a registered office or place of residence outside the territory of the Republic of Poland, instead of the documents referred to in: - 1) VI.3) I.1 of the notice (8.20.1. Of the ToR), submit information from the relevant register or, in the absence of such register, other equivalent document issued by the competent judicial or administrative body of the country in which the contractor is established or resident or place of incorporationa person who is affected by information or a document, to the extent specified in art. 24 sec. 1 items 13, 14 and 21 and par. 5 points 5 and 6 of the Act;
2) VI.3) I.2 VI.3) I.4 of the announcement (8.20.2 8.20.4 of the ToR) shall submit a document or documents issued in the country in which the contractor is established or place of residence, confirming respectively that:
I. Zam. before ordering, he will call for a lecture, whichego the offer has been rated the highest, to submit in the period, not shorter than 10 days, valid as at the day of submitting the below-mentioned statements or documents confirming the circumstances referred to in art. 25 ust. 1 of the Act:
1. Information from the National Criminal Register in the scope specified in art. 24 sec. 1 items 13, 14 and 21 of the Act, issued not earlier than 6 months before the end of the yeardate of submission of offers. Subject to the content of art. 133 ust. 4 of the Act, lecture is not subject to exclusion in the case referred to in art. 24 sec. 1 point 13 lit. d, and in the case referred to in art. 24 sec. 1 point 14, if the person referred to in this provision has been convicted of an offense listed in art. 24 sec. 1 point 13 lit. d. 2
. Certificate of the competent head of the tax office - inin more detail described in point 8.20.2.SIWZ
3. The certificate of the relevant ZUS or KRUS organizational unit - the requirement is described in detail in p. 8.20.3.SIWZ
4. A copy from the relevant register or CEIDG to confirm the absence of grounds for exclusion under Art. 24 sec. 5 point 1 of the Act - the requirement is described in detail in item 8.20.4.SIWZ
5. Contractor's statement about the lack of release to hima final court decision or a final administrative decision on default of taxes, fees or social security or health insurance premiums - the requirement is described in detail in p. 8.20.5.SIWZ
6. Declaration of the Contractor about the lack of a decision against him as a preventive measure for the prohibition of applying for public orders - the requirement is detailed in point. 8.20.6.SIWZ
7. Oświadcthe Contractor's non-payment of taxes and local fees, referred to in the Act of January 12, 1991 on taxes and local fees (Journal of Laws of 2018, item 1445) - the requirement is described in detail in item 8.20.7.SIWZ
Dot. point I. 5-7. Declarations may be submitted in accordance with the specimen set out in Attachment 3 to the ToR. In case the offer consists of several lectures jointly applying for the benefitOrder and Consortium eligibility, the requirement to submit a Statement according to Regret. No. 3 applies to each of them, as well as subcontractors and entities for the resources referred to in Chart.
8. List of persons - a requirement detailed in point. 8.20.8.SIWZ,
9 List of construction works - detailed description in point. 8.20.9.SIWZ
Dot. point I.8-9 - If the offer consists of several Lecturers jointly applying for the thighordering, the requirement to submit a document applies to Total excl.
10. Information of the bank or cooperative savings and credit union - the requirement is described in detail in point 8.20.10.SIWZ
11. The certificate that Wyk has a recognized (qualified) arc welding technology - the requirement described in detail in p. 8.20.11.SIWZ
12. Certificate of an independent entity dealing with attestation of conformityand actions Wyk. with the PN-EN ISO 9001 standard or equivalent - detailed description in point 8.20.12.SIWZ,
13. Certificate of an independent entity dealing with the certification of compliance of measures with the PN-EN ISO 3834-2 standard or equivalent - detailed description in point 8.20.13.SIWZ
14. Certificate of Recognition of the Testing Laboratory, issued by an independent entity dealing with the attestation of conformityand with the PN-EN-ISO / IEC 17025 standard or equivalent - detailed description in point 8.20.14.SIWZ
15. Certificate of an independent entity dealing with the certification of compliance of measures with the PN-EN ISO 9001 standard or equivalent - detailed description in point 8.20.15.SIWZ
16. Accreditation issued by the Polish Center for Accreditation in the field of research to be carried out on the subject, or other equals. document - the requirement is described in detail in point 8.20.16.SIWZ
17. Document confirming the authorization for the use, transport and storage of gammagrafic and X-ray equipment, including the permission for the use of radioactive sources - detailed description in point. 8.20.17.SIWZ
Technical limitations - more in SIWZ
Internet address (URL): www.psgaz.pl

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work for gas pipelines was 25 Jan 2019. Bidding is closed.

This tender has been issued by POLSKA SPÓ?KA GAZOWNICTWA SP. Z O.O. in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45231220 - Construction work for gas pipelines, 45111200 - Site preparation and clearance work, 45112210 - Topsoil-stripping work, 45110000 - Building demolition and wrecking work and earthmoving work, 45112100 - Trench-digging work, 45112300 - Infill and land-reclamation work, 45233124 - Trunk road construction work, 45111240 - Ground-drainage work, 45100000 - Site preparation work, 45112700 - Landscaping work, 45200000 - Works for complete or part construction and civil engineering work, 45300000 - Building installation work, 45255000 - Construction work for the oil and gas industry, 45342000 - Erection of fencing, 45400000 - Building completion work, 71632200 - Non-destructive testing services, 45231200 - Construction work for oil and gas pipelines.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 29333765. The purchaser document reference is 559491-2018.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.