Contract notice: Construction work for gas Tender - 23986553
Tender notice from Poland, published on 07 Jun 2018.
Executive Summary
The POLSKA SPÓ?KA GAZOWNICTWA SP. Z O.O. has issued a Tender notice for the procurement of a Contract notice: Construction work for gas pipelines in the Poland. This Tender notice was published on 07 Jun 2018 and is scheduled to close on 24 Jul 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 23986553, while the tender notice number is 244676-2018 and Register on the platform.
Key facts
Summary
Contract notice: Construction work for gas pipelines
Object of the contract Construction work for gas pipelines Description: Contract notice: Construction work for gas pipelines Authority Type: Utilities entity Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45231220, 45111200, 45112210, 45110000, 45112100, 45112300, 45233124, 45111240, 45100000, 45112700, 45200000, 45300000, 45255000, 45231220, 45231200, 45342000, 45400000, 45312000, 45315100, 71632200, 45231220, 45111200, 45112210, 45110000, 45112100, 45112300, 45233124, 45111240, 45100000, 45112700, 45200000, 45300000, 45255000, 45231200, 45342000, 45400000, 45312000, 45315100, 71632200 CPV Description: Construction work for gas pipelines. Site preparation and clearance work. Topsoil-stripping work. Building demolition and wrecking work and earthmoving work. Trench-digging work. Infill and land-reclamation work. Trunk road construction work. Ground-drainage work. Site preparation work. Landscaping work. Works for complete or part construction and civil engineering work. Building installation work. Construction work for the oil and gas industry. Construction work for oil and gas pipelines. Erection of fencing. Building completion work. Alarm system and antenna installation work. Electrical engineering installation works. Non-destructive testing services. Zadanie nr 1 - Przebudowa SRP I Zygmuntowka Q= 9 000 Nm/h w ramach przedsięwzięcia inwestycyjnego pn. „Budowa gazociągu relacji Sandomierz - Ostrowiec Świętokrzyski " Reference Number: PSGKI.ZZSP.901.009.18 The subject of the order is the reconstruction, making necessary checks and commissioning and commissioning of the reduction and measurement station I with a capacity of Q = 9, 000 Nm / h constituting task 1 of the project investment project "Construction of the Sandomierz - Ostrowiec Świętokrzyski gas pipeline" (Works), according to the documentationproject (Documentation), which in total will be the subject of the order. Main Site: Area of operation of Polska Społka Gazownictwa Sp. z o.o. Oddział Zakład Gazowniczy w Kielcach. 1. The subject of the order is the reconstruction, making necessary checks and commissioning, and commissioning of the reduction and measurement station I with a capacity of Q = 9, 000 Nm / h constituting task 1 of the projectsand investment pn. "Construction of the Sandomierz-Ostrowiec Świętokrzyski gas pipeline" (Robots), according to the design documentation (Documentation), which will jointly constitute the subject of the order. X. 2. The subject of the orders includes in particular the construction of the reduction and measurement station IQ = 9, 000 Nm / h at Zygmuntowka St. in Ostrowiec Świętokrzyski with a boiler room, odorization plant, AKPiA and telemetry together withsettling of the station area. X. 3. Details of the subject of the Order, obligations of the Contractor, material and fittings requirements and other conditions and terms of ordering constituting the Purpose of this Order Subject Description can be found in Attachment 1 to the ToR (Detailed description of the subject of the order and the contractor's obligations), at the same time Annex No. 1 to inzoru contract. X. 4. The Contracting Authority provides for the possibility of ordering referred to in art. 134 sec. 6 point 3 of the Act not exceeding 10% of the value of the basic order. As part of the orders referred to in art. 134 sec. 6 point 3 of the Act, the Contracting Authority provides for similar construction works within the scope provided for under the basic order. Orders that resemble similarThe construction works will be granted if there is a justified need to repeat construction works to the extent provided for under the basic order, if there are actual or legal obstacles to the implementation of the basic order. as: assembly toelements in the station or in technological systems in the area of stations improving the functionality of the facility or adapting it to possible new needs that may arise during the implementation of the task. X. 5. Due to technical limitations, unlimited, full and direct access to information contained in the ToR, you can get free of charge at: https://zamowienia.psgaz.pl / public proceedings no. PSGKI.ZZSP.901.009.18 I. The Contractors, who: 1, may apply for the order. they are not subject to exclusion, 2. meet the following conditions for participation in the proceedings: 2.1. they have technical and professional abilities - specified in section III.1.3) of the announcement 2.2. they are in the appropriate economic and financial situation - as specified in section III.1.2) of the announcementenia Assessment of the fulfillment of the abovementioned the conditions will be fulfilled according to the formula "meets not fulfilling", based on the information contained in EAT, statements and documents to be provided by the Contractor to confirm the fulfillment of conditions for participation in the proceedings. X. From the procedure for awarding the contract, the Contractor excludes Contractors on based on the premises specified in Article 24 paragraph 1 point 12) - 23) PPL and in art. 24 sec. 5 points 1) and 8) Pzp with reservation of art. 133 ust. 4 Pzp and art. 24 sec. 7-12 Pzp. X. II. A list of statements and documents that are to be provided by the Contractor to confirm that the conditions for participation in the proceedings are met and that no grounds for exclusion exist. Documents and statements submitted together with the offer by all Contractors: 1.1. The offer form, made in accordance with tre. of Annex No. 2 to the ToR. In the event that the offer is submitted by several Contractors jointly applying for the award (Consortium), please indicate all entities included in the consortium, indicating the Proxy (leader) of the Consortium. 1.2. Proof of payment of the bid security in accordance with item 10. SIWZ. 1.3. Power of Attorney (original or copy certified by the notary) to sign the offer, jif the authorization to sign the offer does not result from the registration documents (if applicable). 1.4. The third party's obligation to provide resources according to Annex 10 to the ToR (if applicable). The commitment is submitted in the original. 1.5. Actual statement / statements on the day of submitting offers in the scope indicated in this ToR in the formula of the Single European Document of Contract(EAT, model of which is Annex No. 11 to the ToR) in compliance with the requirements set out in 8.1.5.3 of the 8.1.5.9 SIWZ and documents referred to in points 8.1.5.2., 8.1.5.11, 8.1.5.12 of the Terms of Reference: 1.5 .1. The Contractor shall submit to EED for preliminary confirmation that he is not subject to exclusion and meets the conditions for participation in the proceedings. 1.5.2. Contractor who refers to the resources of other entities, in order to demonstrate the absence of grounds for exclusion and fulfillment in relation to them, to the extent that they refer to their resources, the condition of participation in the proceedings shall also be submitted by EGA regarding these entities, signed by the entity whose documents relate to the requirements specified in sections 8.1. 5.3 8.1.5.8 of the SIWZ, 1.5.3. EAT is prepared according to the standard form of the circleeelled in the European Commission's executive regulation issued on the basis of art. 59 par. 2 of Directive 20 14/24 / EU and art. 80 st. 3 of Directive 2014/25 / EU. The standard pattern of the EAT form is available on the Employer's website at https://zamowienia.psgaz.pl in the proceedings under the number PSGKI.ZZSP.901.009.18 Annex No. 11 to the Terms of Reference, 1.5.4. EAT should be submitted electronicallyprovided with a qualified electronic signature, via the PSG Procurement Platform. To place an EAT, log on to the PSG Procurement Platform at https://zamowienia.psgaz.pl. If the Contractor does not remember the password, he must use the "Password recovery" form before logging in. Contractors who do not have an account Purchase PlatformPSGs perform their own registration. After registering, the Contractor will receive an e-mail address about the acceptance of its registration by an external administrator of the PSG Procurement Platform, and in the case of a password reminder will receive a new one-time password, which should be activated with the link provided in the e-mail and change after logging - More information on contains the SIWZ. 1. Oh usplitting of orders can be applied to Contractors who are in the appropriate economic and financial situation, ie they will show that: 1.1. have financial means or creditworthiness, in an amount not less than PLN 2, 000, 000.00 (in words: two million zlotys), the Contractor, in order to prove the fulfillment of this condition, will present information from a bank or cooperative savings banka loan confirming the amount of funds held or the creditworthiness of the Contractor, issued in a period not earlier than one month before the deadline for submission of tenders. In order to confirm the fulfillment of the condition of participation in the proceedings, the Contractor, at the request of the Contracting Authority, will submit the following documents: 2.1. Information of the bank or cooperative savings and credit bank afterconfirming the possession of financial resources or creditworthiness of the Contractor in the period not earlier than one month before the deadline for submission of tenders, confirming the fulfillment of the condition specified in clause 6.1.2.2.1. SIWZ [point 1.1. above the advertisement] 2.3. The Contractor may, in order to confirm compliance with the conditions of participation in the proceedings, in relevant situations and with respect to the specific caseor its parts, rely on the technical or professional capacity or financial or economic standing of other entities, regardless of the legal nature of the legal relationship that it has with it. 2.4. The Contractor, which relies on the abilities or the situation of other entities, must prove to the Employer that while performing the order he will have the necessary resources of theseotow, in particular by presenting the obligation of these entities to put at the disposal of the necessary resources for the needs of the order, prepared according to the template constituting Annex No. 10 to the ToR. 2.5. The Awarding Entity assesses whether the technical or professional capacity or their financial or economic situation made available to the Contractor by other entities allow the Contractor to demonstrate complianceon the conditions for participation in the proceedings and examines whether the subject of exclusion referred to in clause 7 of the ToR - 2.6. The contractor, which relies on the economic and financial situation of other entities, is jointly and severally liable with the entity that committed to provide resources for the damage suffered by the Ordering Party resulting from the non-availability of these resources, Ordering party prior to ordering, will call the Contractor whose offer has been the highest rated, to submit in the prescribed, not shorter than 10 days, the current date as of the day of submitting the following statements or documents confirming the circumstances of which referred to in art. 25 ust. 1 of the Act: 1. Information from the NQF in the scope specifiedin Article 24 sec. 1 items 13, 14 and 21 of the Act, subject to the content of art. 133 ust. 4 of the Act, the requirement described in clause 8.3.1 of the SIWZ 2. Certificate of the competent head of the tax office - the requirement described in clause 8.3.2 of the ToR, 3. Certificate of the relevant ZUS or KRUS field organizational unit - the requirement described in clause 8.3.3 of the SETC, 4. Copy from the relevant register or from CEIDG to confirm the lack of grounds-exclusion pursuant to art. 24 sec. 5 point 1 of the Act - the requirement described in clause 8.3.4 of the ToR, 5. The Contractor's statement that he has not been the subject of a final court judgment or final administrative decision on late payment of taxes, fees or social security or health insurance premiums or - in the event of such a judgment or decision (...) - the requirement described in clause 8.3.5 TOR 6. ABOUTProviding the Contractor with the lack of a decision against him as a preventive measure for the prohibition of applying for public orders - the requirement described in clause 8.3.6 of the SETC 7. Contractor's declaration on not paying taxes and local fees - the requirement described in clause 8.3.7 of the SETC 8. A list of persons in accordance with clause 8.3.8 of the ToR confirming the condition specified in clause 6.1.2.1.2. SIWZ [III.1.3) announceda] 9. Evidence determining whether the construction works listed in the EED were duly carried out, in particular information on whether construction works were carried out in accordance with the provisions of construction law and properly completed, the evidence referred to are references or other documents confirming the condition specified in 6.1 .2.1.1. SIWZ [III.1.3) announcements] 10. Bank information or sa savings and credit unions confirming the possession of financial resources or creditworthiness of the Contractor, - in accordance with clause 8.3.10 of the ToR - to confirm compliance with the condition specified in clause 6.1.2.2.1. SIWZ [III.1.2) announcements] 11. Certification that the Contractor has a recognized (qualified) arc welding technology in accordance with clause 8.3.11 of the ToR - confirming the fulfillment inthe condition specified in point 6.1.2.1.4. a) SIWZ. 12. Certificate of an independent entity that certifies compliance of the Contractor's activities with the PN-EN ISO 9001 standard or equivalent (for the scope of the work covered by this specification) in accordance with clause 8.3.12 of the ToR - to confirm the fulfillment of the condition specified in section 6.1.2.1.4. letter b) SIWZ. 13. The certificate of an independent entity is taken byconfirming compliance of the Contractor's activities with the PN-EN ISO 3834-2 standard or equivalent (with respect to the work covered by this specification) in accordance with clause 8.3.13 of the ToR - to confirm the fulfillment of the condition specified in clause 6.1.2.1.4. c) SIWZ. 14. Certificate of Recognition of the Testing Laboratory - in accordance with clause 8.3.14 of the ToR - to confirm the fulfillment of the condition specified in clause 6.1.2.1.3point and). Terms of Reference. 15. Certificate of an independent entity that certifies compliance of the Contractor's activities with the PN-EN ISO 9001 standard or equivalent (within the scope of tests covered by this specification) in accordance with clause 8.3.15 of the ToR - to confirm the fulfillment of the condition specified in clause 6.1.2.1.3. b). Terms of Reference. 16. Accreditation issued by the Polish Center for Accreditation in accordance with point 8.3.16 of the Terms of Reference-- to confirm the fulfillment of the condition specified in point 6.1.2.1.3. c) SIWZ. 17. Document confirming the authorization to use, transport and store gammagrafic and x-ray equipment, including the authorization of the use of radioactive sources to confirm the fulfillment of the condition specified in point 6.1.2.1.3. d) SIWZ. More in SIWZ - due to technical limitations. Internet address (URL): www.psgaz.pl Directive: Classical Directive (2014/25/EU)
The bid deadline for Contract notice: Construction work for gas pipelines was 24 Jul 2018. Bidding is closed.
This tender has been issued by POLSKA SPÓ?KA GAZOWNICTWA SP. Z O.O. in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45231220 - Construction work for gas pipelines, 45111200 - Site preparation and clearance work, 45112210 - Topsoil-stripping work, 45110000 - Building demolition and wrecking work and earthmoving work, 45112100 - Trench-digging work, 45112300 - Infill and land-reclamation work, 45233124 - Trunk road construction work, 45111240 - Ground-drainage work, 45100000 - Site preparation work, 45112700 - Landscaping work, 45200000 - Works for complete or part construction and civil engineering work, 45300000 - Building installation work, 45255000 - Construction work for the oil and gas industry, 45231200 - Construction work for oil and gas pipelines, 45342000 - Erection of fencing, 45400000 - Building completion work, 45312000 - Alarm system and antenna installation work, 45315100 - Electrical engineering installation works, 71632200 - Non-destructive testing services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 23986553. The purchaser document reference is 244676-2018.