Contract notice: Construction work Tender in Poland - 16545682
Tender notice from Poland, published on 16 Sep 2017.
Exeutive Summary
The AKADEMIA SZTUK PIĘKNYCH IM. WŁADYSŁAWA STRZEMIŃSKIEGO has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 16 Sep 2017 and is scheduled to close on 30 Oct 2017, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 16545682, while the tender notice number is 363324-2017 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45000000, 45100000, 45223000, 45223100, 45223110, 45223200, 45223821, 45232460, 45262110, 45262120, 45262300, 45262310, 45262311, 45262321, 45262522, 45262700, 45300000, 45310000, 45311000, 45312000, 45312100, 45312200, 45312310, 45313100, 45314310, 45314320, 45316100, 45320000, 45321000, 45323000, 45324000, 45330000, 45331000, 45331100, 45332000, 45332400, 45343000, 45343220, 45400000, 45410000, 45420000, 45421100, 45421141, 45421146, 45421152, 45430000, 45432000, 45432113, 45432114, 45440000, 45442200, 45450000, 45453100, 45000000, 45100000, 45223000, 45223100, 45223110, 45223200, 45223821, 45232460, 45262110, 45262120, 45262300, 45262310, 45262311, 45262321, 45262522, 45262700, 45300000, 45310000, 45311000, 45312000, 45312100, 45312200, 45312310, 45313100, 45314310, 45314320, 45316100, 45320000, 45321000, 45323000, 45324000, 45330000, 45331000, 45331100, 45332000, 45332400, 45343000, 45343220, 45400000, 45410000, 45420000, 45421100, 45421141, 45421146, 45421152, 45430000, 45432000, 45432113, 45432114, 45440000, 45442200, 45450000, 45453100 CPV Description: Construction works within the project pn. Academic Design Center for the Development of Cultural Heritage and Artistic Education Construction work Site preparation work Structures construction work Assembly of metal structures. Installation of metal structures. Structural works. Prefabricated units. Sanitary works. Scaffolding dismantling work. Scaffolding erection work. Concrete work. Reinforced-concrete work. Concrete carcassing work. Floor-screed works. Masonry work. Building alteration work. Building installation work. Electrical installation work. Electrical wiring and fitting work. Alarm system and antenna installation work. Fire-alarm system installation work. Burglar-alarm system installation work. Lightning-protection works. Lift installation work. Installation of cable laying. Installation of computer cabling. Installation of outdoor illumination equipment. Insulation work. Thermal insulation work. Sound insulation work. Plasterboard works. Plumbing and sanitary works. Heating, ventilation and air-conditioning installation work. Central-heating installation work. Plumbing and drain-laying work. Sanitary fixture installation work. Fire-prevention installation works. Fire-extinguishers installation work. Building completion work. Plastering work. Joinery and carpentry installation work. Installation of doors and windows and related components. Installation of partitioning. Installation of suspended ceilings. Installation of partition walls. Floor and wall covering work. Floor-laying and covering, wall-covering and wall-papering work. Parquet flooring. Wood flooring work. Painting and glazing work. Application of anti-corrosive coatings. Other building completion work. Refurbishment work. 3.1. The subject of the order are construction works in the facility located at ul. Księży Młyn 13/15 in Ł-dź. WORK FOR WORK 1. Works in the main building (historical) including: - Insulation and attic roofing; - - Ventilation chimney above dahu, - dismantling of temporary bridges, - dismantling, construction, masonry in JM's axles - dismantling of old installations in JM's axles - installation of indoor installations in the building, including: mechanical ventilation, air conditioning, telecommunication installations (including AV, LAN, SSWiN, CCTV, DSO, SAP, SKD, BMS);The ordering author allows the use of technical gres in square format instead of hex plates in technical rooms, but the use of material, format, pattern other than that included in the design documentation requires acceptance of the ordering. on styrofoamMaintenance of the same parameters of thermal insulation) - Construction of new ceilings in the technology of gypsum boards, Painting of walls; - Installation of lighting fixtures and fittings by fitting the required ac - Joinery and door locksmith - The ordering authorizes the use of standard slab doors, in the case of designed aluminum doors with a pattern on the chemically treated glass. interior fittings by mounting the required acceptance - Supply and assembly of artistic and decorative elements by fitting the required acceptance of the pattern by the Ordering Party); - Restoration of metal stairs as recommended and agreed with WUOZ; - Renovation of the fresco as recommended and agreed with WUOZ ; 2. Works remaining (in the field): - execution of external electrical and lighting installation - indelivery and installation of fountains (including construction works) - ramps and ramps for disabled people - delivery and assembly of parking automatics (including construction works) with enclosure and rigging and netting under green climbing The detailed scope of work is included in the design documentation for the taskThe existing condition of the historic building should be taken into account, for this purpose a local vision of the site is recommended. All product and material names mentioned in the Design Documentation Order are intended to determine the desired performance standard and specification of the technical characteristics and requirements. Equivalent devices and materials are understood as devicesenia / materials made by any manufacturer with identical or better technical parameters and utility values and fully compatible with the rest of the devices provided that they meet the same technical specifications and at the stage of implementation will be accepted by the Ordering Party. The Orderer's decisions in this respect will be based on the requirements laid down in the documenth contracts, as well as norms and guidelines. The detailed designation of the subject of the order is included in the design documentation constituting the attachment to the SIWZ and the model contract, which is an attachment to the SIWZ. The ordering party requests the deposit of PLN 300, 000. (three hundred thousand zlotys). Bid security is requested before the deadline for submission of bids. The bid bond may be deposited in one or-in several of the following forms referred to in art. 45 sec. 6 b) bank guarantees or sureties of a savings and credit union, provided that the surety of the cashier is always a money guarantee, c) bank guarantees, d) insurance guarantees, e) sureties provided by the entities, referred to in Art. 6b para. 5 point 2 of the Act dated 9.11.2000 on the creation of the Polish Agency for Enterprise Development. From the contents of the guarantees and sureties referred to in art. 45 sec. 6 point 2-5 of the PP must be unconditional, irrevocable and at the first written request of the orderer, the guarantor's obligation to pay to the ordering party the amount specified in the guarantee: 4.1. if the contractor has been selected: a) refusal to sign the contracta public procurement order under the conditions set out in the offer, b) does not provide the required performance bond, c) the conclusion of the contract on public procurement becomes impossible for reasons attributable to the contractor. if the contractor, in response to a request referred to in art. 26 sec. 3 and 3a Pzp, for reasons lying on his side, will not make statements or todocuments confirming the circumstances referred to in art. 25 sec. 1 PPL, statements referred to in art. 25a sec. 1 PPL, the plenipotentiary or does not agree to correct the mistake referred to in art. 87 sec. 2 pt 3 Pzp, which will make it impossible to choose the tender submitted by the contractor as the most advantageous 5. The bid bond is submitted before the deadline for submission of bids. Security deposit paid in pPlease pay by bank transfer to the bank account of the ordering party 33 1130 1163 0014 7148 7820 0011. A copy of the transfer order or printout from the electronic transfer is recommended to be submitted together with the offer. Payment of the bid bond in money by bank transfer to the bank account indicated by the contracting authority will be effective once the bank account is recognized with the amount of the bid bond (if the cashThe bank indicated by the contracting authority will be delivered before the deadline for submission of tenders). Original document confirming the deposit of the bid bond in the forms referred to in Art. 45 sec. 6 pt 2-5 The contractor submits with the offer. In order to convert all values and financial data in other currencies into PLN, the Purchaser will apply the average exchange rate of the given currency of the National Bank of Polandiego (NBP), as of the publication date of the announcement in the Official Journal of the European Union, and if the day of publication is the day when the NBP does not publish the average exchange rate, the exchange rate will be accepted the day after the publication date of the announcement. If the bid bond is filed in the forms referred to in art. 45 sec. 6 pt 2-5 PPI and the amount of the bid bond will be determined in these formsin foreign currency, in order to convert all the values and financial data in other currencies into PLN, the Orderer will apply the average exchange rate of the given currency of the National Bank of Poland (NBP), valid at the date of publication of the notice in the Official Journal Office of the European Union, and if the publication date is a day when the NBP does not publish the average exchange rate, the rate will be accepted.the day after the publication of the announcement. In the case of a tender deposit in cash and the contents of guarantees and sureties referred to in art. 45 sec. 6 pt 2 5 Pzp, if the bid bond will be submitted in these forms, it must appear that the bid bond secures the tenderer's offer submitted in the public procurement proceedings for " Academic Center-With the consent of the contracting authority, the contractor may change the form of the bid bond into one or more forms referred to in Article 45 (6) of the CPC Terms of Reference. The change in the form of the bid bond must be made with the continuity of the security of the bid with the amount of the bid bond.WARRANTY AND GUARANTEE The contractor is obliged to provide a minimum of 60 months warranty and warranty for the works performed. 89 sec. 1 point of the PPL act as incompatible with the content of the SETCPPThe agreement and the warranty constitutes the criterion for the evaluation of the tender, clause 15.2.C. SIWZ. Performance bond 1. The security is set at 10% of the total price quoted in the offer. The Contractor shall provide security against the signing of a public procurement contract. The performance bond paid in money is paid by bank transfer to the bank account of the contracting authority 33.1130 1163 0014 7148 7820 0011. Payment of the performance bond in money transfer to the bank account indicated by the contracting authority will be effective upon the recognition of this bank account with the amount of collateral (cash inflows on the bank account indicated by the contracting authority must be preceded by the signing of a public procurement agreement. Security-Proper performance of the contract may be made in one or more of the following forms referred to in art. 148 sec. A) money, b) bank guarantees or surety bonds of a savings and credit union, except that the surety of the cashier is always a money guarantee, c) bank guarantees, d) insurance guarantees, e) sureties provided by entities, about-those referred to in art. 6b para. 5 pt 2 of the Act of 9 November 2000 on the establishment of the Polish Agency for Enterprise Development (Journal of Laws of 2007, No. 42, item 275, as amended). the forms referred to in art. 148 sec. 1 pt. 2 5 Contractor contractor submits the original document confirming the lodging of the security in these forms. Subject to paragraph 17.5. SIWZ, with bambooThe guarantees and sureties referred to in art. 148 sec. Pursuant to the unconditional, irrevocable and first written request of the beneficiary, the guarantor's obligation to pay to the contracting party the amount representing 10% of the total price stated in the tender for non-performance or inadequate performance of the contract by the contractor (oblizanego). 5. The ordering party shall return the security within 30 days of the date of execution of the order and the ordering by the ordering party to be duly executed. The amount left for securing claims for defects for defects can not exceed 30% of the collateral value. From the contents of the guarantees and sureties referred to in art. 148 sec. 1 pt. 2 5 Pzp must result that the amount left for securityno claims for defects for defects amount to 30% of the amount of collateral. 7 The amount referred to in point 17.6. The SIWZ is returned no later than the 15th day after the expiry of the warranty period for defects. The Purchaser does not agree to lodge a security: a) in promissory notes issued by a bank or a credit union savings bank, b) by establishing a lien on securitiesissued by the State Treasury or a unit of territorial self-government, c) by establishing a registered pledge under the terms of the registered pledge and pledge reimbursement. With the contracting authority's consent, the contractor may change the form of the collateral for one or more of the forms referred to in art. 148 sec. 1 PC. Changing the form of the collateral must be made from the leftthe continuity of the security and without reducing its height. From the document stating the lodging of collateral in the form other than money, it must appear that the collateral relates to the proper performance of the agreement on public procurement for "Construction works under the project" Academic Design Center for the Development of Cultural Heritage and Artistic Education "MarkIf the contractor lodges a security in a foreign currency, the amount of the collateral will be converted into PLN at the average exchange rate. PLN in relation to foreign currencies announced by the National Bank of Poland (Table A exchange rates of foreign currencies) are obligatoryon the day of placing the dispatch notice on the date of publication of the contract notice in the Official Journal of the European Union. If the security is brought in the forms referred to in art. 148 sec. In this form, the amount of collateral will be determined in foreign currencies, the amount of the collateral will be converted into PLN according to the average PLN exchange rate in relation to the currency.foreigners announced by the National Bank of Poland (Table A foreign exchange rates) on the date of publication of the contract notice in the Official Journal of the European Union. If the security is lodged in cash, the ordering party stores it on an interest bearing bank account. The ordering party returns the security lodged in cash with interest arising from the bank account agreement, to whomThe rime was kept, minus the cost of keeping this account and the bank commission for transferring money to the bank account of the contractor. During the performance of the contract the contractor may change the form of the collateral in one or more forms referred to in art. 148 sec. 1 pt. 2 5 PPL. Changing the form of collateral is done with continuity of collateral and without reducing ithis height is 16. In the case of lodging a collateral in the form other than money, the Contractor shall submit to the Purchaser a form of guarantee or surety for approval. Settlements between the contracting authority and the contractor will be in PLN currency. The bid price calculated by the Contractor should include all indirect and direct costs that the Contractor deems necessaryto incur for the timely and correct execution of the order object (must include all costs associated with the execution of the order, resulting from the design documentation and technical specifications of the execution and acceptance of the construction work, as well as the following costs: any preparatory, replacement and cleaning work, land development and maintenance backyard buwaste management, landfill and temporary storage, execution of as-built documentation, information board, off and on devices, supervision by the user's employees) profit of the Contractor and all required taxes and fees, and in particular VAT. Attached to this SIWZ the robot counter (Attachment No. 10 to SIWZ) should be treated jauxiliary material, not directly used to calculate the price of the offer. The price indicated by the Contractor should be determined in accordance with art. 2 pts. 1 of the PPL law, which provides that the price should be understood as a price within the meaning of art. 3 sec. 1 pt. 1 and paragraph 2 of the Act of 9.5.2014 on information on prices of goods and services (Journal of Laws of 2014, item 915, as amended), ie the value expressed in units of moneyThe buyer is obliged to pay the trader for the goods or services; The price includes the goods and services tax and the excise tax if, under separate regulations, the sale of goods (services) is subject to the tax on goods and services or excise duty. The price is also understood as the tariff. According to the Act of 7 July 1994 on the denomination of the zloty (OJ No. 84 pos. 386 with the change) Polish monetary unit is gold, which is divided into 100 cents. So the smallest monetary value is $ 0.01 ($ 1). According to Art. 91 sec. 3a Pzp If an offer has been made which would lead to the creation of a tax liability in accordance with the provisions of the tax on goods and services, the contracting authority shall, in order to assess such an offer, The tax on goods and services that it would have to settle in accordance with those provisions. The contractor, by submitting an offer, informs the contracting authority whether the selection of the bid will lead to the inclusion in the contracting party of the tax obligation, indicating the name of the construction work to which the service will lead to its creation, and indicating its value without tax. Payment inThe salaries will be in parts, once every two calendar months, after the unqualified completion of the robots scheduled in the material and financial timetable for the two-month billing period, provided that the first billing period ends on the last day of the second full calendar month counted from the date of signing the contract. last part of the salary, nomay amount to more than 10% of the total gross remuneration indicated. The payment of each part of the remuneration will be made on the basis of a valid partial VAT invoice issued by the General Contractor, within 30 days of the date of delivery to the Investor, by bank transfer to the bank account specified in the invoice. According to Art. 91 sec. 3a of the Public Procurement Act, when submitting an offer, Involved to inform the Orderer (in the Offer form) whether the selection of his offer will lead to the inclusion in the Orderer of the tax obligation in accordance with the provisions of the tax on goods and services, indicating the name (type) of the goods or services to which the delivery or service will lead to its creation, and indicating their value without the amount of VAT. In the case of subcontracting contract in-The scope of the construction work to which the subject of supplies or services is subject to the subcontracting is the value of the contract: - of a value equal to or greater than 0.5% of the value of the contract or - of a value greater than PLN 30, 000. Contractors may apply for the award of the contract, which: a) are not subject to exclusion in the circumstances referred to in art.. 24 sec. 1 and paragraph (B) they meet the conditions for participation in the procedure specified by the contracting authority in the contract notice and the SIWZ. Terms of participation in the proceedings. Contractors who meet the conditions for participation in the procedure may apply for the award of: - a) competences or powers to pursue a specific occupational activity, if-This is due to separate regulations, b) economic or financial situation, c) technical or professional capacity specified by the contracting authority in the contract notice and the SIWZ. 24 sec. 1 PPL in the procurement procedure is excluded: 1) the contractor who has failed to demonstrate compliance with the conditions for participation in the proceedings or has not been invited to negotiate or to submit an initial offeror 2) a contractor who is a natural person who has been convicted of a criminal offense: a) referred to in Art. 165a, art. 181-188, art. 189a, art. 218-221, Art. 228-230a, Art. 250a, art. 258 or art. 270-309 of the Penal Code (Journal of Laws of 2016, item 1137, later amended 6), or 6.6.1997. 46 or Art. 48 of the Act of 25 June 2010. on sport (OJ of 2016, item 176, 1170 and 1171, and from 2017, items 60 and 1051), b) of the terrorist character referred to in art. 115 - 20 of the Act of June 6, 1997 Criminal Code, c) Treasury, d) referred to in Art. 9 or art. 10 of the Act of 15.6.2012 on the consequences of entrusting the performance of work to foreigners who are against the regulations in the territory of the Republic of Poland (Journal of Laws, Dz.U.769); 3) the contractor, if the acting member of his managing or supervisory body, partner in the public or partner or general partner in the limited partnership or limited partnership or proxy was legally convicted of the offense referred to in point 13; The contractor, against whom a final court judgment or final administrative decision on the suspension of u andtax, social security or health insurance premiums or charges unless the contractor has paid taxes, social security or health insurance premiums or fees together with interest or fines, or has entered into a binding agreement on the repayment of those debts; The result of deliberate action or gross negligence has misled the purchaser-when providing information that it is not subject to exclusion, meets the conditions for participation in the procedure or objective and non-discriminatory criteria, hereinafter referred to as "selection criteria", or who has concealed this information or is unable to provide the required documentation; or negligently provided information misleading the ordering party that could haveSignificant influence on decisions made by the awarding entity in the procurement procedure; 7) The contractor who has unlawfully influenced or attempted to influence the contracting authority's activities or obtain confidential information that might give him an advantage in the procurement procedure; in the preparation of the ordering procedure or of which the employee, as well as the person in thewho performs work on the basis of a contract of assignment, work, agency or other contract for the provision of services, has participated in the preparation of such proceedings unless the cause of this distortion of competition can be eliminated otherwise than by the exclusion of the contractor from participation in the proceedings;, which with other contractors has concluded an agreement aimed at jamming competition between-10) contractor who is a collective entity against which the court has banned the application for a public contract pursuant to the Act of 28.10.2002 on the liability of the entities collective acts forbidden under penalty of perjury (Journal of Laws of 2016, item 1541 and 2017r. pos. 11) contractors, which were the subject of a preventive measure against the application for public orders; Consumers (Journal of Laws of 2017, item 229, 1089 and 1132), submitted separate offers, partial offers or requests to participate in postunless they demonstrate that the links between them do not lead to distortion of competition in the procurement procedure. Based on Article. 24 sec. 5 PPL from the procurement procedure, the contracting authority also excludes the contractor: 1) in relation to which the liquidation has been opened, the approved court arrangement in the restructuring proceedings is intended to satisfy the contractorThe creditor by liquidation of his property or the court ordered the liquidation of his property pursuant to art. 332 sec. 1 Law of 15.5.2015 Restructuring Law (Journal of Laws of 2015, item 978, 1259, 1513, 1830 and 1844, and 2016 item 615) or declared bankrupt, with the exception of the contractor after the bankruptcy declaration has concluded an agreement approved by a final court decision if the arrangement nIt provides for the satisfaction of creditors by liquidating the assets of the bankrupt, unless the court has ordered the liquidation of its assets under Art. 366 sec. 1 Law of 28.2.2003 on Bankruptcy Law (Journal of Laws of 2005, item 233, 978, 1166, 1259 and 1844 and 2016, item 615). Participating in the proceedings, the contracting authority requests the following documents: 1) inFormation of the National Criminal Register within the scope defined in Art. 24 sec. 2) an extract from the relevant register or from the central register and information on business activity, if separate regulations require entry in the register or records, to confirm lack of grounds for exclusion under Art. 24 sec. 3) declaration of the contractor not to issue to na final court judgment or final administrative decision to pay taxes, social security or health insurance premiums or contributions, or in the event of the issuance of such judgment or decision of the documents confirming the payment of these duties, with any interest or fines or the conclusion of a binding agreement on repayment of those claims; 4a statement by the contractor that he has not been judged as a precautionary measure against the prohibition of applying for a public contract; 5) the contractor's declaration of belonging or not belonging to the same capital group; In case of belonging to the same capital group, the contractor may submit together with the statement documents or information confirming that the relations with anotherThe conciliator does not lead to distortion of competition in proceedings (see section 6.6 of this SIWZ). 24 sec. Within 11 working days, the contractor, within 3 days of posting on the website, the information concerning the amount it intends to allocate for the financing of the order, the companies and the addressees of the contractors who submitted the tenders within the time limit, -Terms of payment included in the offers, shall provide the contracting authority with a declaration of affiliation or non-affiliation to the same capital group referred to in art. 24 sec. 1 pt. 23 PPL. With the submission of the statement, the contractor can provide evidence that the connection with another contractor does not lead to distortion of competition in the procurement procedure. Internet address (URL): http://www.asp.lodz.pl Directive: Classical Directive (2004/18/EC)
The bid deadline for Contract notice: Construction work was 30 Oct 2017. Bidding is closed.
This tender has been issued by AKADEMIA SZTUK PIĘKNYCH IM. WŁADYSŁAWA STRZEMIŃSKIEGO in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45100000 - Site preparation work, 45223000 - Structures construction work, 45223100 - Assembly of metal structures, 45223110 - Installation of metal structures, 45223200 - Structural works, 45223821 - Prefabricated units, 45232460 - Sanitary works, 45262110 - Scaffolding dismantling work, 45262120 - Scaffolding erection work, 45262300 - Concrete work, 45262310 - Reinforced-concrete work, 45262311 - Concrete carcassing work, 45262321 - Floor-screed works, 45262522 - Masonry work, 45262700 - Building alteration work, 45300000 - Building installation work, 45310000 - Electrical installation work, 45311000 - Electrical wiring and fitting work, 45312000 - Alarm system and antenna installation work, 45312100 - Fire-alarm system installation work, 45312200 - Burglar-alarm system installation work, 45312310 - Lightning-protection works, 45313100 - Lift installation work, 45314310 - Installation of cable laying, 45314320 - Installation of computer cabling, 45316100 - Installation of outdoor illumination equipment, 45320000 - Insulation work, 45321000 - Thermal insulation work, 45323000 - Sound insulation work, 45324000 - Plasterboard works, 45330000 - Plumbing and sanitary works, 45331000 - Heating, ventilation and air-conditioning installation work, 45331100 - Central-heating installation work, 45332000 - Plumbing and drain-laying work, 45332400 - Sanitary fixture installation work, 45343000 - Fire-prevention installation works, 45343220 - Fire-extinguishers installation work, 45400000 - Building completion work, 45410000 - Plastering work, 45420000 - Joinery and carpentry installation work, 45421100 - Installation of doors and windows and related components, 45421141 - Installation of partitioning, 45421146 - Installation of suspended ceilings, 45421152 - Installation of partition walls, 45430000 - Floor and wall covering work, 45432000 - Floor-laying and covering, wall-covering and wall-papering work, 45432113 - Parquet flooring, 45432114 - Wood flooring work, 45440000 - Painting and glazing work, 45442200 - Application work of anti-corrosive coatings, 45450000 - Other building completion work, 45453100 - Refurbishment work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 16545682. The purchaser document reference is 363324-2017.