Contract notice: Construction work for electricity Tender - 31879226
Tender notice from Bulgaria, published on 28 Mar 2019.
Executive Summary
The „??????????????? ???????? ????????“ ??? has issued a Tender notice for the procurement of a Contract notice: Construction work for electricity power lines in the Bulgaria. This Tender notice was published on 28 Mar 2019 and is scheduled to close on 10 Apr 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 31879226, while the tender notice number is 145074-2019 and Register on the platform.
Key facts
Summary
Contract notice: Construction work for electricity power lines
Object of the contract Construction work for electricity power lines Description: Contract notice: Construction work for electricity power lines Authority Type: Utilities entity Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: Lowest price CPV code: 45231400, 45231400, 45231400, 45231000 CPV Description: Construction of a new 400 kV line from Varna to Bourgas Reference number: ЦУ / 2019/041 Subject: Construction work for pipelines, communication and power lines. the public procurement is the construction of a new 400 kV high-voltage power plant from Varna to Bourgas and includes the following main types of works: excavation for the foundations, installation and leveling of thefoundation, laying of concrete and implementation of the foundations of the new pillars, including shuttering and decking, installation of new pillars, assembly of wire chains and lightning rope with mounting rollers and their suspension on pillars Main Site: The substation power line "Varna" to R14 on the territory of Varna District Construction of a new 400 kV power linewith a length of 28, 046 km, from Varna substation to R14 (pillar №101), including: - the tracking of the track and the central points of the new posts, - the conduction of the pillars, - the trenches for making the foundations, the installation and leveling the foundations according to the physico-mechanical properties of the soil for each concrete pillar, - laying of concrete and implementation of the foundations of the new pillars, includingtiling and decking, - installation of the new pylons, - backfilling with dredging of the ground in the foundations, - installation of new pillars, preparation and straightening after recruitment of the concrete strength of the concrete, - conductor and lightning rope with mounting rollers and their suspension on the pillars, - spread of pilot ropes for each tension- - drawing, adjusting and installing phase wires and lightning ropes with the installation of the tensioning circuits for the conductor and the lightning rope, - mounting of the terminal clamps, - mounting of spacing spacers in the interlayer according to the enclosed drawings for installation, - mounting the bridge connections of all tensioning pins, - mountingof the "OZ" plates, numbering and dating of all pillars, - measuring of contact and earth connections, - conducting a survey of the constructed line, cleaning of the track and shaping of the new pillars, It applies to all lots: The participants should be entered in the central professional register of the builder in the third group - for the construction of the first category.the submission of a certified copy of a certificate of entry in the central professional register of the builder in the third group - for first category construction and a valid control coupon When submitting the tender, the participants declare their compliance with the selection criteria by filling in the information required by the contracting authority, in the relevant section of EEDOP, presented in electronic form Documents, pproof of compliance with the selection criteria shall be submitted by the tenderer designated for the contractor for the relevant lot before the award of the contract. Documents are also submitted to subcontractors and third parties if the participant has declared them. Applies to all lots: 1. Participants to have a valid "ProfessionAccording to Article 171a of the Territorial Units Act, a person from a Member State of the European Union or from another State party to the Agreement on the European Economic Area, which is a member of the European Economic Area, under Article 171 of the Spatial Development Act. establishes in the territory of the Republic of BULGARIA, shall have equivalent professional indemnity insurance or guarantee in anotheror is a party to the Agreement on the European Economic Area It is proved by the presentation of a certified copy of professional liability insurance covered by the Ordinance on the terms and conditions for compulsory insurance in the design and construction. a person from a Member State of the European Union or from another State Partythe reason for the European Economic Area that is established on the territory of the Republic of BULGARIA shall be an equivalent document, according to Art. 171a of the TDA. 2. Participants should have made a total turnover for the last three completed financial years, depending on the date on which the participant was established or started its activity specified in the minimum requirements.with the submission of a statement of accounts and the annual financial statements or their components, when their publication is required by the law of the country where the participant is established. Participants must have achieved a minimum turnover in the field covered by the contract for the last three financial years ended, depending on the date of the participant's creationaden or commenced its activities as specified in the minimum requirements. Turnover within the scope of the contract is the turnover of construction works in electrical installations and electricity networks It is evidenced by the submission of a statement - declaration. When submitting the tender, the participants declare their compliance with the selection criteria by filling in the information, required by the contracting entity, in the respective section of EEDOP, presented in electronic form - Documents demonstrating compliance with the selection criteria set are to be submitted by the contractor designated for the contractor for the respective lot before the conclusion of the public procurement contract. Documents are also submitted to subcontractors and third parties if the participant has declared such. If a participanta bid is submitted for more than one lot, a separate package is provided for each lot, indicating the position to which it refers. The time limit for submission of tenders is determined in accordance with Art. 133, para. 4 of the Public Procurement Act. Reasons: Public procurement is carried out as part of the activity "Construction of a new 400 kV power line between Dobrudja and Bourgas", co-financed with funds from the financial MechaConnecting Europe - Energy Sector under Grant Agreement No. INEA / CEF / ENER / M2016 / 1155363 between ESO EAD and Ex. agent. "Innovations and Networks" to the EC Under the Grant Agreement, the implementation period is until 31.12.2020. In 2018, a procedure for the award of a public procurement contract has been opened with the subject "Construction of a new 400 kV wind power plant "Varna"The procedure has been suspended after the enforcement of the CPC definition for non-granting of a temporary suspension measure has been resumed and was subsequently terminated by Decisions No. 257, 258, 259 from 22.1.2019 on the grounds of Art. 110, para. 1, item 2 of the Public Procurement Act with the following reason - all tenders submitted are inappropriate within the meaning of -2, item 25 of the Supplementary Provisions of the Public Procurement Act. Cato taking into account that financing with the resources of the Agreement may take place provided that the cost of building the electrical supply is made before the deadline for the implementation of the action or not later than 31.12.2020, a delay in the implementation of the action may result in a partial or complete loss of European funding for the construction of a power line. Project "Construction of a new 400 kV high-voltage power plant from Varna / Burgas to Burgas / Burgas has the status of a project of common European interest under Regulation 347/2013 for the construction of trans-European infrastructure. The project is part of a group of projects of common interest 3.8 "Increasing the transmission capacity of an interconnection between BULGARIA and ROMANIA" (known as the Black Sea Corridor), including 3 investments in Romanianterritory. Any delay in the construction of a power line will result in a failure to meet the objectives set in the regulation and the arrangements made with the Romanian side. The implementation of the group of projects has a significant impact on the security of supply in the region and contributes to the flexibility of the system, the transfer of electricity from renewable energy sources, interoperability and safer electric powersystems on both sides. Research on the implementation of projects shows that the transmission capacity of the North-South Priority Corridor is increasing by more than 1, 000 MW.The construction of these projects will strengthen the network in Eastern Europe in order to be able to join the new and planned RESs highly concentrated in S / E BULGARIA and SW / RO, thus providing the conditions for achievingnot the European and national renewable energy targets and the reduction of climate change in the long term. The reasons given clearly demonstrate both the importance and the need to implement the project, respectively the implementation of the project activities within the terms of the agreement. Regarding legal normsthe time limits for the execution of the procedure, the designation of a contractor and the conclusion of a contract and the time limits for the implementation of the project activities envisaged for each distinct item of the public procurement contract and on the basis of Art. 133, para. 4 the time limit for receipt of tenders in the procedure is 15 days from the date of dispatch of the public procurement notice for publication in the light of urgencyimposed by the circumstances From field III.1.3): When submitting a tender, the participants declare the correspondence. you are with a critter. for selection by filling in the information in EEDOP. Documents demonstrating compliance with the selection criteria shall be submitted by the tenderer designated as contractor prior to the conclusion of the contract. Documents shall also be submitted to subcontractors and third parties, akthe participant has declared such Internet address (URL): www.?so.bg
The bid deadline for Contract notice: Construction work for electricity power lines was 10 Apr 2019. Bidding is closed.
This tender has been issued by „??????????????? ???????? ????????“ ??? in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45231400 - Construction work for electricity power lines, 45231000 - Construction work for pipelines, communication and power lines.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 31879226. The purchaser document reference is 145074-2019.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.