Expired Tender Poland ICB TOT Ref. 15377675

Contract notice: Construction work Tender in Poland - 15377675

Tender notice from Poland, published on 02 Aug 2017.

Executive Summary

The WYDZIAŁ MECHANICZNY ENERGETYKI I LOTNICTWA, POLITECHNIKA WARSZAWSKA has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 02 Aug 2017 and is scheduled to close on 04 Sep 2017, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 15377675, while the tender notice number is 302897-2017 and Register on the platform.

Key facts

Summary
Contract notice: Construction work
TOT Ref. No.
15377675
Document Ref. No.
302897-2017
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
02 Aug 2017
Bid deadline
04 Sep 2017
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work
Description: Contract notice: Construction work
Authority Type: Other
Contact Nature: Works
Procedure: Negotiated procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 45210000, 45300000, 45400000, 45214400, 45214410, 45000000, 45210000, 45300000, 45400000, 45214400, 45214410
CPV Description: Reconstruction and extension of buildings in the Institute of Thermal Technology at ul. Nowowiejska 21/25 in Warsaw as part of the investment: "Spatial optimization of existing infrastructure of the Faculty of Mechanical Engineering and Aeronautics of the Warsaw University of Technology to increase the usable floor space for learning needs" (Contract No. 1422 / MNiSW dated
Construction work.
BUilding construction work
Building installation work.
Building completion work.
Construction work for the university buildings.
Polytechnic construction work.
The scope of the individual stages of construction
The project does not plan to change the purpose of the building, only the necessary addition and extension of certain functions. Because of the specifics of the facility, some of the features must remain in placeThat location. Suggested solutions arrange space where possible, emphasize and visualize the interesting historical value of elements of the building and to allocate missing functional spaces.
Scope of remodeling
Wing C
Rebuilding within wing C aims at introducing appropriate functional divisions, complementing deficiencies and introducing legible Layout komunikacyjnego. It involves the separation of new premises, the introduction of two staircases and the creation of a new corridor. The space of the present emptiness in the middle of the building will be filled with new ceilings, creating communication. Inside there will be a soul, transferred steel staircase and two existing lifts. On the ground floor of the room in the hall of the zosA vast expanse of corridor located along the eastern facade of the building. Due to significant changes, demolition in the existing supporting walls will be necessary, and additional construction will be used on which the new elements of the horizontal partitions will fall.
Wing D
The ordering of the function requires significant changes in the Hall d body.View of a non-functional staircase in the southern part of the wing. A new crate with a crane was designed. The second vertical communication node is provided at the eastern, internal fa-ade of the hall. Some existing machines will be removed so that new divisions and functionalities can be introduced. In the middle of the building are planned new ceilings, which will connectDifferent levels in the north and south of the wing additionally create the opportunity to exhibit in the open, two-storey space of the original assembly element of the mini-power plant. The design of the internal communication solution, which includes the transition to a two-storey room for the Lavals turbine and crane exposition, will enable-The expansion of the existing courtyard between the C and D wings and the Aula B. It will feature additional features. As part of the merger of this zone with the existing front wing, passage is planned at level 1 on both sidesThis is the result of the creation of an additional story in this section.
Planned demolition and disassembly work
In connection with the reconstruction of the ITC building, it will be necessary to carry out demolition work on the premises. It is also necessary to remove some of the equipment that is no longer in operation, as well as the components of the installation.
Sanitary ventilation
In the sanitary facilities, mechanical ventilation is provided. IN-This is why it is necessary to supply the supply air. In the door to the room should be undercutting the area required by law. In the case of REI 30 / REI60 fire resistance doors, the undercut is to be discontinued, instead of performing a wall pass, with fire protection. A fuse, cut off the supply in case of fire. Required volume of supplyDescribed in the project Sanitary Installations. The location of the door with undercuts and transfer grids indicated in the drawings of the Architecture and Sanitary Installations
Sanitary Installations
The building is expected to install mechanical ventilation, air conditioning, technological, central heating, water and sewage, fire water pipe and roof drainage. localizedJust a fan room. There is also an existing, modernized heating node. Sanitary installation equipment will be located in the technical part of the underground storey and on the roof of the new overhanging courtyard in the courtyard
Detailed sanitary documentation is available in the Sanitary installation project
Installation of fog sprinklers
Building within the constructionIn Hall C, D, and in the courtyard will be additionally protected by fire by the installation of fixed fire extinguishers fog sprinklers. On the ground floor in room B.-1.07. The technical room of the water tank is equipped with a tank with a pump and necessary for supplying the equipment.The internal fire network was insulated. On the above-ground levels fire hydrants are located. DN 25 with interchangeable hose close to staircases.
Electrical and teletechnical installations
The building will be equipped with electrical, lightning and teletechnical installations. The technical basements were designed in the cellar.
Installed in the Institute of Thermal Technology:
230 V
Installation 400 V, 16/32 A,
General and emergency lighting,
Photovoltaic installation,
Computer network,
Telephone installation,
Wi-fi,
Installation of intrusion alarms,
Installation of toilets for disabled people,
SAP Signaling,
Access Control System,
CCTV System,
Audio-Video Systems Equipment,
The Obscure Teaching System
TeBuilding Chnology Due to the specificity of functions located in the building, it is necessary to design technological installations within didactic and research laboratories. They will be deployed in accordance with the guidelines of each department of the Department of Mechanical and Aerospace Engineering.
In the laboratories used flammable gases connected to stations. In the case of additional storageUse fire protection cabinets. There will be a fuel tank connected to the room of the turbine engine.-New mineral waterproofing of existing foundation walls after founding foundations
Facade finishing
Fa-ade renovation range
Clean and renovate facades with historic architectural details. Repair works using the original materials used for facade reception in accordance with the Conservation Program.
Colors and finishesNo new fa-ades
new exterior fa-ades are present in the courtyard and surrounding area of the existing Bula building. Double-layer walls on pos. 1st floor with the E and J axes, walls on the existing attic of the hall and around the new overhanged teaching room plastered and painted in white RAL 9003.
joinery and window fixtures
new glass fa-ades
new glass fa-ade facade was designedCovered courtyard and additions on the sides of the shed roof. Glass fa-ades are also planned on the 1st floor of the new scientific research center. The pole-and-beam distribution is consistently conducted on the roof.K PV modules, PVT, glazed collector wall modules and so on. Solar wall, modules with variable-phase PCM material and with transparent insulation. Place the brackets fixed to the facade poles for the assembly of the measuring equipment, using the system solution of the manufacturer of the fixture to which they will be installed.A glass canopy in the form of a shed roof. Slope of southern slopes equipped with photovoltaic cells at an angle of 45, northbound at an angle of 30. All assembled into steel beams and integrated into drainage ditches along them.
Joinery and door joinery
It will be necessary to replace the door parts (now externally) Exit door in haPlates C and D. It is also planned to replace the internal doors to make a good, solid joinery and a joinery machine. * For some existing door openings and new ones, as a result of additional demolition, a new door locksmith, including fire protection (shown in the drawings)
Windy
The building has designed various vertical communication solutions for lifts and lifts piThere are two vertical lifts adapted for the needs of the disabled, at the stairs leading from the courtyard to the A part of the building.
Ceilings
Suspended ceilings are designed in several variants: they were in the interior design.Interior glazed
The interior glass walls on aluminum profiles are used in the project. Use a noiseless system, also in the case of walls with fire protection requirements. Formal WC cabins
WCs have been designed with WC cabins made of HPL laminated panels with invisible construction. Dimensions, quantities, locationAccording to the views and statements. Color RAL 9004. Reference system:
Mobile inner walls
In the teaching room D.1.01 and in the laboratory C.2.01 is designed a mobile wall, allowing the division into two smaller rooms.
Balustrades
Design of balustrades:
- new, steel, with Mesh filling, or steel handrails: fasteners, courtyard stairs in the courtyard, dedicated cages-Hallway, new communication in hall D, corridor around the hall TC1, mezzanines and footbridge in the courtyard, entrance to the house,
- existing, repaired (adapted to legal requirements and filled with the net), carried: communication in hall C, mezzanine around Boiler in hall D.
electric shutters
interior roller shutters are electrically controlled in a flush or wall mounting systemFailure to install the cassette.
Glass smoke curtains
In the yard under the newly designed containers should be made glass smoke curtains. Fixed curtains made of fireproof glass. Tables with a rectangular shape and height of 80 cm
Steel tubular construction
In the courtyard under the newly designed lecture hall was designed a spatial structure of steel pipes with a turnpikeOju round Avg. 10 cm. The multifocal pillar system plays the role of a modern, spatial form for the interior of a cafe and serves as a substructure to which light fixtures will be attached. Steel joints are mounted to the floor of the courtyard, the structure of reinforced concrete columns and to the ceiling under the lecture hall.
The contractor is obliged to contribute a high bid bondSpelling: 500 000 PLN (in words: five hundred thousand zlotys)
bid security must be submitted before the deadline for submission of bids in the following forms, depending on the choice of the Contractor:
a. Money, transfer to bank account No. 81124010531111000005005664;
b. Bank guarantees;
c. Cash suretyship of savings and credit unions; Bank guarantees;
e. Insurance guaranteespieczeniowych;
f. Sureties provided by entities referred to in Art. 6b para. 5 point 2 of the Act of 9.11.2000 on the creation of PAED (ie Journal of Laws 2007, No. 42, item 275)
The bid bond must cover the whole binding period. Excluded from proceedings.
Rules of return and detention of the bid bond are specified in art. 46 of the Public Procurement Law.
An order may applyAn onder who: 1) is not subject to exclusion under art. 24 sec. 1 and under Art. 24 sec. 5) Points 1), 2), 3), 4) and 8) of the Public Procurement Law 2) meet the conditions of participation specified in the announcement
3) will be classified in points 1 to 5 according to point II.2.9.
Internet address (URL): http://www.zamowienia.pw.edu.pl/wykaz
Directive: Classical Directive (2004/18/EC)

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work was 04 Sep 2017. Bidding is closed.

This tender has been issued by WYDZIAŁ MECHANICZNY ENERGETYKI I LOTNICTWA, POLITECHNIKA WARSZAWSKA in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45000000 - Construction work, 45210000 - Building construction work, 45300000 - Building installation work, 45400000 - Building completion work, 45214400 - Construction work for university buildings, 45214410 - Polytechnic construction work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 15377675. The purchaser document reference is 302897-2017.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.