Contract notice: Construction work Tender in Poland - 15307023
Tender notice from Poland, published on 31 Jul 2017.
Executive Summary
The MIASTO ŁÓDŹ - ZARZĄD INWESTYCJI MIEJSKICH has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 31 Jul 2017 and is scheduled to close on 06 Sep 2017, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 15307023, while the tender notice number is 296432-2017 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Regional or local authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45000000, 71000000, 45100000, 45220000, 45231220, 45231300, 45112710, 45233161, 45236000, 45231400, 45232000, 45233000, 45233252, 45316110, 45310000, 45330000, 45453000, 71240000, 71250000, 71310000, 71322000, 71351910, 71352000, 71354000, 71530000, 71700000, 45000000, 71000000, 45100000, 45220000, 45231220, 45231300, 45112710, 45233161, 45236000, 45231400, 45232000, 45233000, 45233252, 45316110, 45310000, 45330000, 45453000, 71240000, 71250000, 71310000, 71322000, 71351910, 71352000, 71354000, 71530000, 71700000 CPV Description: Construction work. Architectural, construction, engineering and inspection services. Site preparation work. Engineering works and construction works. Construction work for gas pipelines. Construction work for water and sewage pipelines. Landscaping work for green areas. Footpath construction work. Flatwork. Construction work for electricity power lines. Ancillary works for pipelines and cables. Construction, foundation and surface works for highways, roads. Surface work for streets. Installation of road lighting equipment. Electrical installation work. Plumbing and sanitary works. Overhaul and refurbishment work. Architectural, engineering and planning services. Architectural, engineering and surveying services. Consultative engineering and construction services. Engineering design services for the construction of civil engineering works. Geology services. Subsurface surveying services. Map-making services. Construction consultancy services. Monitoring and control services. Rewitalizacja Obszarowa Centrum Łodzi Projekt 1 przebudowa ul. Włokienniczej oraz budowa pasażu pieszo jezdnego łączącego ul. Włokienniczą z ul. Jaracza, w systemie „zaprojektuj i wybuduj". Reference Number: DOA-ZP-VIII.271.53.2017 The contract is for reconstruction ul. Wlokiennicza and the construction of a pedestrian walkway connecting ul. Wlokiennicza with ul. Jaracz, in the "design and build" including two tasks: Main Site: Lodz, ul. Textiles (from the street. East ul. Kilińskiego) Task 1: Plot No. 440/14, 460/9, 460/8, 460 / 5 S-1; The subject of the order is RevitalizationArea Center of Ł-dź Project 1 reconstruction of ul. Wlokiennicza and the construction of a pedestrian walkway connecting ul. Wlokiennicza with ul. Jaracza, in the "design and build" system, covering two tasks: Task 1 Design documentation and reconstruction of Włokiennicza Street, including the execution of design documentation and reconstruction of Włokiennicza Street in Ł-dź on the section from Wschodnia Street.Crossing) to ul. Drainage and necessary reconstruction of the infrastructure of the area together with the development of the pocket park (square) adjacent to ul. Textiles. The scope of design documentation and robotics includes, inter alia: reconstruction of pavements, pavements, and industry developments in the field of lighting constructionAlong with the illumination, along with dehydration of the designed road, construction of teletechnical sewerage, removal of telecommunications, electricity, heating, gas and water supply collisions, assembly of small architectural elements ie design, Execution of signsConstruction and installation of the Municipal Information System and the construction of irrigation systems together with the construction of the irrigation system. Wlokienniczej 17 and 19. The investment area covered by this PFU is located within the following areasH conservation conservation areas included in the municipal register of monuments: the area of protection of cultural landscape and urban planning "Cloth Halls of the New Town handicraft village" and in the area of conservation protection, ie in the area covered by the archaeological protection zone Task 2 Design documentation and construction of the passage Walking foot connecting Wlokien StreetThey are from ul. Jaracza Projekt 1 divided into 2 tasks: 2a and 2b, including: Task 2a construction of a walking passage connecting the ul. Wlokiennicza with ul. Jaracza, including: execution of design documentation and construction of the passage on the walkway connecting ul. Wlokiennicza with ul. Jaracz. The scope of the design documentation and the robot covers the pavement of existing paved roads (pavements and pavements), rConstruction of a playground for children, development of public space into elements of small architecture, assembly of urban furniture, construction of a fountain and revitalization of the existing brick walkways in the north part of the passage, as well as Industry developments in the fieldRebuilding and construction of illumination along with illumination, dehydration of the planned thrust and urban space, reconstruction of the existing terrain network in the scope of colliding with the projected investment works, installation of the City-light showcases and the execution of the plant together with the construction of the irrigation system. Development of plot 460/4 of S-1, at present withA transformer station is located (to execute under the right-of-way option), consisting in carrying out design documentation and transferring an existing transformer station located in a building at ul. Jaracza 22a ie the demolition of the existing building of the station, the dismantling of the station and its reconstruction in a new location with the connection of power and reception and development of the areaAt the plot. The Ordering Party reserves the right to exercise the option right within 4 months from the date of signing the contract. 10 months after the conclusion of the contract (tasks 1 and 2a). The contracting authority does not specify in this respect any requirements which-Performance The Contractor is obliged to demonstrate in a special way. The condition will be deemed fulfilled if the Contractor demonstrates that he has the funds or has a credit capacity of: PLN 1 200 000 Note: For the purposes of assessing compliance with the condition specified, Above, if the value or values are given in currencies other than PLN, the Purchaser will accept the average rateA given currency published by the National Bank of Poland at the date of publication of the contract notice in the Official Journal of the European Union. If, on the day of publication of the contract notice in the Official Journal of the European Union, the National Bank of Poland does not publish the average exchange rate of a given currency, the conversion rate shall be the average exchange rate published on the first day after the date of publication. In order to confirm that the Contractor fulfills the conditions for participation in the proceedings concerning the financial situation, the Purchaser requests the following documents: Information of the bank or collective savings and credit union confirming the amount of financial means held or Creditworthiness you If, for justified reasons, the Contractor can not submit documents concerning the financial situation required by the Employer, he may submit another document which sufficiently confirms the fulfillment of the condition of participation of the contracting authority described by the contracting authority. Recall numbering is consistent with zapiSIWZ: 6. Grounds for exclusion according to SIWZ 7. List of statements or documents confirming fulfillment of conditions for participation in the proceedings and lack of grounds for exclusion 7.1 According to Art. 24aa. 1 of the Public Procurement Law, the Awarding Entity will first evaluate the tenders and then examine whether the contractor, whose bid has been evaluated as the most favorable, is not subject to exclusion and meets the conditions of7.2 For the bid, the contractor attaches for the purpose of provisional confirmation that he is not subject to exclusion and meets the conditions for participation in the proceedings: 7.2.1 valid as of the date of submission of the tender document, the single European Document of Arrangement (hereinafter referred to as JEDZ) Constituting Attachment No. 3 to the SETC and in accordance with the instructions for the filling of the JEDZ constituting the Register7.2.1.1 If the Contractor invokes the resources of other entities, in order to demonstrate the absence of grounds for exclusion and fulfillment, in so far as it relies on their resources, the conditions for participation in the proceedings, in art. 25a sec. Section 3 of the PPL is obliged to present for each of the entities subject to a separate uniform JED document.7.2.2 Original of the obligation of the entity providing its resources for the purpose of the Contractor submitting the bid if applicable. 7.4.1 In order to confirm that the Contractor fulfills the conditions Participation in proceedings concerning the financial situation; and-Technical or professional capacity The contracting authority requests the following documents: 7.4.1.1 Information of the bank or collective savings and credit union confirming the amount of ownership. 7.4.1.2 List of construction works 7.4.1.3 list of persons 7.4.2 In order to demonstrate the lack of grounds for exclusion from the contractor's procurement procedure, the Purchaser shall order the following documents: 7.4.2.1 information from the National Criminal Register within the scope defined in art. 24 sec. 1 point 13, 14 and 21 of the Public Procurement Law 7.4.2.2 within the scope defined in art. 24 sec. 1 pt. 15 of the Act Not to issue a final court judgment or final judgment against the contractor. Administrative decision on arrears with payment of taxes, charges or social or health insurance premiums 7.4.2.3 to the extent specifiedIn art. 24 sec. 1 pt. 22 of the PPL Act. The lack of a ban against him. Applying for the order. Publ 7.4.2.4 within the scope defined in art. 24 sec. 5 pts. 1 copy of the Act from the relevant register or from the central register and information on business activity 18.1 The ordering does not provide: 18.1.1 the conclusion of the framework agreement, 18.1.2 the submission of variants, 18.1.3 settlement in currencies-Foreigners, 18.1.4 electronic auction, 18.1.5 reimbursement of participation in the proceedings, 18.1.6 introduction of the reservation of the obligation of the person. Execution of the key parts of the order by the Contractor. dynamos. Shopping system 18.2 The ordering party envisages the scope of task 2b, 18.3. 67 sec. 1 point 6 of the Public Procurement LawBones up to 20% of the value of the basic order, consisting in the repetition of similar services or construction works (as described in point 18.3 SIWZ) 18.4 The Purchaser informs that in the case of not granting the funds or parts thereof the contracting entity intends to invalidate the proceedings under Art. 93 section 1a of the Public Procurement Law 18.5 Scope and conditions of amendments to the agreements and other issues related to the umbrellaThese are specified in the template of the agreement constituting Appendix 7 7.3 The contractor, without the contracting authority's request, is obliged, within 3 days of placing on the Internet site, With the opening of offers (http://przetargi.bip.uml.lodz.pl), give the ordering party a declaration of belonging or not belonging to the same capital group. Internet address (URL): http://www.uml.lodz.pl/ Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Construction work was 06 Sep 2017. Bidding is closed.
This tender has been issued by MIASTO ŁÓDŹ - ZARZĄD INWESTYCJI MIEJSKICH in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 71000000 - Architectural, construction, engineering and inspection services, 45100000 - Site preparation work, 45220000 - Engineering works and construction works, 45231220 - Construction work for gas pipelines, 45231300 - Construction work for water and sewage pipelines, 45112710 - Landscaping work for green areas, 45233161 - Footpath construction work, 45236000 - Flatwork, 45231400 - Construction work for electricity power lines, 45232000 - Ancillary works for pipelines and cables, 45233000 - Construction, foundation and surface works for highways, roads, 45233252 - Surface work for streets, 45316110 - Installation of road lighting equipment, 45310000 - Electrical installation work, 45330000 - Plumbing and sanitary works, 45453000 - Overhaul and refurbishment work, 71240000 - Architectural, engineering and planning services, 71250000 - Architectural, engineering and surveying services, 71310000 - Consultative engineering and construction services, 71322000 - Engineering design services for the construction of civil engineering works, 71351910 - Geology services, 71352000 - Subsurface surveying services, 71354000 - Map-making services, 71530000 - Construction consultancy services, 71700000 - Monitoring and control services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 15307023. The purchaser document reference is 296432-2017.