Expired Tender Hungary ICB TOT Ref. 15026615

Contract notice: Construction work Tender in Hungary - 15026615

Tender notice from Hungary, published on 20 Jul 2017.

Executive Summary

The ÉRD MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA has issued a Tender notice for the procurement of a Contract notice: Construction work in the Hungary. This Tender notice was published on 20 Jul 2017 and is scheduled to close on 04 Sep 2017, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 15026615, while the tender notice number is 280456-2017 and Register on the platform.

Key facts

Summary
Contract notice: Construction work
TOT Ref. No.
15026615
Document Ref. No.
280456-2017
Country
Hungary
Notice type
Tender
Competition
ICB
Publication date
20 Jul 2017
Bid deadline
04 Sep 2017
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work
Description: Contract notice: Construction work
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45000000, 45200000, 71220000, 45210000, 45211350, 45214200, 45215200, 45000000, 45200000, 71220000, 45210000, 45211350, 45214200, 45215200
CPV Description: Construction work.
Works for complete or part construction and civil engineering work.
Architectural design services.
Building construction work.
Multi-functional buildings construction work.
Construction work for school buildings.
Construction work for social services buildings.
Keretmegallapodas kereteben magasepitesi feladatok ellatasa Erd Megyei Jogu Varos terueleten.
Keretmegallapodasos eljarIn the frame of the framework of the Erd County Joga Varos's high-level work, the epitese, developer, and utilization of the authorizations. In this respect, the bundles are:
1. Creation of an Integrated Social and Child-Friendly InteractionA:
In 20875 hrsz-u real estate the existing epithet to atepites, fel-jit. The planned 1-floor 2-floor apartment with high roof. Complex disadvantages and disadvantages of the project.
The basic usefulness of the planned investment is 4 500 m2, with a min. 150 people can be accommodated in a lecture hall with a loudspeaker. It has a legitimate epithetic license, but nYertes is responsible for the execution of the export plans. Legitimate 400-course kitchen and the most basic 1 337 m2 garden.
2. Erd County Jogu Varos is a developer of professional interior engineering systems in Erdő.
The renovation of the Kos Karoly Szakepasztal Iskola School in Karelia, with new gym (25m x 46.50m) with spaces and an oenallo workshop. Existing obsolete epithelium bOntasra keruel. There is also a workshop room with 500-course kitchen cookware. The basic usefulness of the planned investment is 8, 800 m2. min. 700 people can be accommodated in a lecture hall with epithe of loudspeakers. It has a legitimate epithetic license, but the winner is responsible for the execution of the export plans. 3006 m2 garden with epitaxial sport palya.
3. BatthYany Sportiskolai Altalanos School reconstruction, expanding koezepfoku educatas developer
The new school's epithet is more beautiful in the uetem, in a dog the school is constantly evolving. The curriculum program consisted of 24 classroom, secondary schools and gymnasiums, which were suitable for epueletegyuettes, with the gymnasium with the soft reconstruc- tion to transfer the novel resinAbbra should remain in use. The epithelium of the epithelium of the epithelium would also have epilepsy. The floor space is 800 m2 and is connected to a restaurant.
The useful floor space of the planned building is 11 535 m2 (1 967 m2, 9 568 m2 new epites). min. 700 people can be accommodated in a lecture hall with a loudspeaker. 6090 m2 sports hall, 800 m2 artificial treeS gambler. Complex anti-fatigue eliminator. It has a legitimate epithetic license, but the winner is responsible for the execution of the design plans, which is the epitome of the worst 700-course dish.
4. In Fenyves-Parkvaros there is an epitome of the coaching center
The 933 hrsz-u real estate brokering school, 24 elementary schools .. The school has a "C" type gym .. The tanodaoda (15x25 mWith 6x10 m tanks) will be able to be deployed. In the basement there is a 800-degree heat cooker and a connected dining room. Substantial useful floor space of the planned investment: 12 018 m2 (676 m2 other material, covered terrace) min. 700 people can be accommodated in a lecture hall with a loudspeaker. Complex anti-fatigue eliminator. It has a legitimate epithetBut the winner is responsible for the execution of the export plans. 5 098 m2 garden epithet.
5. Teleki Samuel Altalanos School Reconstruction
12 tantermes gimnazium letesuel, basketball pallet with new gym, parking with placement. The school's expansions and facilities are packed together, with a 250-course-sized kitchen, a restaurant room.
The planned interior is a useful useful baseElevation: 5 022 m2 (2 067 m2 new epites). min. 700 people can be accommodated in a lecture hall with a loudspeaker. Complex anti-fatigue eliminator. It has a legitimate epithetic license, but the winner is responsible for the execution of the export plans. 7 736 m2 garden with epitome of sports hall, with enclosed roofs.
The above mentioned works are handled by a licensed dealerfor all tasks szuekseges in order to carry out egyuett be the winning AT's implement.
The tender price must include all koeltseget that the implementation can not be szueksegesek.
The procedures Bidder (AT), contractors (AV), and may not participate in methods for demonstrating an administrator in December, he Yes. Section 62 (1) to (2). Exclusionary reasons under the power of all.
ATsThe EEKD should be tried in advance by the probationary.
The exclusionary reasons justify a check in A. kroner in the case of: I. EEKD basis, II. A 321/2015. (X. 30.) Gov. (Hereinafter referred to as "Cr."). Under section 69 (4). Overseas Kbt. According to Section 64. The legally binding one is tested by the host operator at the same time as the EEKD.Under the motto of exclusionary reasons, no justification for the pool is provided in Sections 8, 10, 12-14. - - 15 (1) - 16, --. In the case of exclusionary reasons, no justification for the establishment of the pool. Section 67 (4) And Article 15 (1) of the Code. Unsubscribed AVs are excluded due to exclusionary reasons. Section 67 (4) And - 15 (2) of the Cr.
The EEKD is suitableIn the case of an ongoing filing for a filing, the filing of the filing for the filing and the filing of the filing from the filing of the filing shall also be filed with the filing of a filing certificate . If AT is not in progress vMust be filed in the form of a written, negative content declaration (Section 13). The owner of the epitomous industrial design is not suitable unless it is included in the Etv., Or in the case of hosts established on a non-Mo, the resident country in the USA or in the case of a non-resident-In a country that is licensed, entitled or by organizational, chamber members. It is unsuitable for AT if it is not listed in the US Department of Commerce according to its design services related to the epithet. In the case of hosts established on a non-Mo, the sovereign country in the USA or, if it is not in the country of resident, With elle, right or with organizational, chamber tags. The Kbt. Article 65 (1) (c) requires the testing of ATs in the United States of America if it satisfies the requirements of S.2. Koev [Kbt. 65 (6)]. This requirement can be claimed if the organization has the capacity for the task for which the role of the organization is in the NOW, with organizational tags or subdivisionsThe field test is valid. Section 65 (1) (c) requires that all ATs in the test must comply with the provisions of the SZ1 test. Verification: In the case of a one-piece European Deed of Documentation, 1). A. in the prerequisite mod approach of the EEKD, accepting the hosts is simple-Statement, in connection with the provisional proof of the al ko test, that is, the IV. In the case of the NYT, pursuant to Section 69 para. (11) of the Kbt. Data or artefacts free of charge are not extracted from the NYT, the organs leading it to the vertex or the verbZolo Dok must be justified in a simple supper; A) it is tested by default. In the case of a resident registered in Mo, the person present in the NYC is registered with the AK-register, The data of the NYC of the Egyptian wizards; No employer established on Mo, in accordance with Annex XI of the 2014/24 / EU. Breastfeeding certificate, extracted from NYT(26 - (2)) AK is a 322/2015. (X.30.) Section 21 - (1) (2) of Section 21 and the provisions of Section Kr.1. - (3) (AT) on the date 321/2015. (X. 30.) Korm. Decree No. 1 (1) and Section II. In accordance with Section (5) of the Constitution (EEKD), it must be confirmed in advanceThat the AK accepts the simple declaration of the hosts regarding the provisional proof of the al ko koeans, that is, the IV. The application of the relevant documents of the suitability test is based on the basis of the application of the law on the basis of Article 1 (2) of the Government Decree, -And Section 19. - The Licensee shall not provide any verifiable information when the Kbt. In accordance with the provisions of Section 69 (11) of the Hungarian Civil Code, Unspecified amounts of allowances not mentioned in the chapter are credited to the databases, and the economic operator has indicated their availability in the EEKD. Date Added by 321/2015. (X. 30.) Korm. Decree (19) (1) (b)Based on the last few days prior to the current call for applications, the sole or the legal predecessor of the merger date under the administrative law of the present applicant is a simple masculine of the suffixes of the samaritan toerving (if the law of the country of the host country is established) Altal garden talkingYou can find out about the web site of the ceginformacios service, the details of the report are checked by the provider, the attachment of the report is unsuitable.
P / 2. Date Added by 321/2015. (X. 30.) on the basis of Article 19 (1) (c) of the basic Regulation, the total amount of the bullshit completed in the previous quarter, (Pp. 3, pp. 3). (Pp. 3). (P. 3). Date Added by 321/2015. (X. 30.) Korm. Of 19 - (1) (a) of the KormHe is a member of a penchant for an interview with a two-year-old statement, with the following content:
- all the daughters of the pennies, - the guild of the pennies, - the guilty of the pennies, - the guilty conscripts, Were in two years (24 months) or more than 30 daysSorbaallitas (attol fucking the time when the runner when the letter to the letter or when did the artificial person if these data are available to you).
The timer in conjunction with the proof of qualification will draw attention to 321/2015. (2) - (3) and (5) to (7) of the Decree No. X. (X. 30.) Korm. (X. 30.) Korm. Of Section 19 para. (1) b)In the case of a subordinate case, the equivalent may be complied with, so that one of the most basic ones in the trial is to comply with the given test procedure. Article 65 (7) of the Constitution may meet the requirements of a suitable body of work, the time-consuming persons may meet the capacities of any body or person, You fucking fucking. In this case, this organization and the appropriate test methods or experimental measures must be included in the schedule, which is justified by the fact that the provider is or is also relying on this organization. The Kbt. Article 65 (8) shall be accompanied by a declaration of the capacity of the organization that has the capacities of a contractor or contractorA document containing a copy of the certificate, which will inform you that the contingent resources of the contractor will be available for the duration of the contract. In this justifications, please read the enclosed documents' verbatim statements.
2. You must enclose a read-out with the application. Section 66 para. (5).
3. The content is up to dateYou must have the time-consuming statement of the Kbt. Section 66 (2) and (4). The timing for an original item is the Kbt. The declaration under Section 66 (2) shall contain the original copy of the declaration. Provider of the present document of the Kbt. Article 63 (6) of the Information at a Glance. Reszajanlattetel not provided for the reasons given below: TimeThe lathe found that the timing of the co-purchasing period was incompatible with the economic essentials, and the expiration of the tasks that had been evaluated would undermine the corresponding task. Organizational, design, contractual, and guarantee-based applications create a one-sided structure for the task of determining the investment, It would be a waste of time for the bureau to endure full castration. The tasks to be devalued in the context of the individual controversy are closely related to one another, because of the oesszefueggese functions that can be performed by designers or designers. SECTION VI: COMPLEMENTARY INFORMATION VI.1) CONTRACT RELATED TO A PROJECT Article 76 (2) (C) point (points 0-100).
1.1-1-2. In the case of the case, the fordiThis is a golden match, while the 2-4. In the case of a straight line, the straight gold.
7. Tender for the Kbt. Section 105 para. (4) is based on the fact that the competition authority applies the same criteria as outlined in the Koezbeszerzesi Dokumentumok. The timekeeper gave the timescales the appropriate explanations for the list of qualified timers (P / 1.-P / 3.; M / M-1 / second).
9th Forditas: Kbt. Article 47 (2), paragraph 10 Iranyado law: the 2015 CXLIII. Toervens and promotions.
11. Koezoes has a time limit for the Kbt. Section 35 shall be based on the foundation. The date must be attached to the date of submission of the statement by the Alairasi cimpeldanyat, a member of the legal entity involved in the application, And Section V. (1) of Section V of the Toerveny. Time-consuming project portfolio is excluded from both time-consuming and challenging timescales. [PPA. Article 35 (9)]
14. The times given in this user are based on the Koezep-european time zone. Hianypotlas: Kbt. Article 71.
16. In the case of the odds of the issuing foreign currency to the forint, -In the face of the arrears of the last day of the month, the MNB's foreign exchange rate on the full time of the reference is referenced. Explain the timetable: the Kbt. Section 56. basis.
22. Responsibility: The frame spindle is blocked at a second stage.
23. Providers of Time: AK provides the time schedules for a time-to-day supply of information as per Section 54 (2) of the Kbt., Whose unimaginable denomination is 10, 000, 000 (ie HUF 18 million). Bank account number: 12001008-00209494-00100001, paid by: Erd MJV Outbound Payment) Deposits of the credit card: atutalasrol szolo bankruptcy simple solicitor or penitentiary institution or secured guarantee or solicitor handwritten security document-Or a mere supporter of a contractor's contract.
24. Fax: dr. Incze Adam, filed under: 00006.
25. The Applicant shall apply this Tender Section 75 e).
26. The author argues that the cloud is M / 2. Of the Hungarian Chamber of Merchants (www.mmk.hu) and the Hungarian Epitance Chamber (www.mek.hu), mustIn a number of legally defined names, which must be insured for the duration of the contract.
Internet address (URL): http://www.erd.hu
Directive: Classical Directive (2014/24/EU)

Documents

Tender Notice
Login to view

Similar tenders

Tender Country TOT Ref. No. Bid deadline
Modernization of the Pongracz Ut Trolleybus Fleet Hungary 152654097 07 Dec 2026
Mate - Laboratory Services Dbr Hungary 152652247 28 May 2027
Km Performs Tree Row Maintenance and Mowing Tasks. Hungary 152648344 23 Nov 2026
Renovation and Expansion of the Spa Building Hungary 152644951 26 Nov 2026
Railway Superstructure and Bridge Inspection Activity Hungary 152643467 23 Dec 2026

Hungary Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work was 04 Sep 2017. Bidding is closed.

This tender has been issued by ÉRD MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA in Hungary.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45000000 - Construction work, 45200000 - Works for complete or part construction and civil engineering work, 71220000 - Architectural design services, 45210000 - Building construction work, 45211350 - Multi-functional buildings construction work, 45214200 - Construction work for school buildings, 45215200 - Construction work for social services buildings.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 15026615. The purchaser document reference is 280456-2017.

See the Similar Tenders section on this page or browse other tenders from Hungary.

This tender falls under Construction and Real Estate in Hungary. Suppliers in these sectors can track similar Hungary tenders using CPV-based alerts.