Contract notice: Construction work Tender in Bulgaria - 13024780
Tender notice from Bulgaria, published on 06 May 2017.
Executive Summary
The ЮЖНОЦЕНТРАЛНО ДЪРЖАВНО ПРЕДПРИЯТИЕ has issued a Tender notice for the procurement of a Contract notice: Construction work in the Bulgaria. This Tender notice was published on 06 May 2017 and is scheduled to close on 08 Jun 2017, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 13024780, while the tender notice number is 171344-2017 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Body governed by public law Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: Lowest price CPV code: 45000000, 45000000, 45100000, 45220000, 45230000, 45233000, 45233200, 45233300, 45240000, 45262000, 45000000, 45100000, 45220000, 45230000, 45233000, 45233200, 45233300, 45240000, 45262000, 71000000, 71200000, 71300000, 71320000 CPV Description: Construction work. Site preparation work. Engineering works and construction works. Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork. Construction, foundation and surface works for highways, roads. Various surface works. Foundation work for highways, roads, streets and footpaths. Construction work for water projects. Special trade construction works other than roof works. Architectural, construction, engineering and inspection services. Architectural and related services. Engineering services. Engineering design services. „Проектиране, авторски надзор и строителство в съответствие с нуждите на „Южноцентрално — продължава в II.1.4). Продължава от раздел II.1.1) (...) държавно предприятие", включващо: 1. проектиране, авторсSurveillance and construction of new permanent forest roads and transport technical infrastructure to them; 2. designing, authorizing supervision and overhaul of existing permanent forest roads; and 3. designing, authoring supervision and construction of technical and fortification facilities incl. Construction / overhaul of others within the meaning of Art. 3, para. 1, item 1, b. "B" of the PPL. NUTS Code: BG42 Main Site: In the TerritoriesThe scope of the South Central State Enterprise DS Continued from Item II.2.1): (...) and others within the meaning of Article 3, Paragraph 1, Item 1, Item b of the Public Procurement Act, In accordance with the needs of the South Central State Enterprise "DS", including: construction of new permanent forest roads and transport technical infrastructure to them, major overhaul of existing permanent forest roads;Repacking equipment incl. Construction / overhaul of others within the meaning of Art. 3, para. 1, item 1, b. (B) of the PPA Description of the activities - The following main activities are foreseen: Delivery of the materials and equipment required for use in the construction works (with the exception of these supplies to the contracting entity, if any) accompanied by the relevant "Quality Documentation" "(Certificates of originE, declarations of conformity, technical passports, etc.) Temporary construction and preparatory work Organization of the execution of the construction and assembly works Dismantling and preparatory work Construction and assembly works and tests . Construction of construction papers, preparation of executive documentation, executive drawings and cadastral filming, coordination actions onAcceptance and commissioning of the construction Removal of defects occurring during the term of the guarantee Organization and execution of other accompanying activities not specified above but essential for approval of investment projects, construction permit, implementation of Construction works and the commissioning of the constructions, after duly empowering themThe procedure may involve Bulgarian and / or foreign natural or legal persons, including their associations, which meet the requirements of the Public Procurement Act, the RDP and the SPA, as well as any other entity that has The right to perform construction and design services under the law of the State in which it is established- a separate item Subject: "Construction and overhaul of permanent forest roads, facilities, incl. Techno-fortification facilities, and others within the meaning of Art. 3, para. 1, item 1, b. "B" of the Public Procurement Act, in accordance with the requirements of the South Central State Enterprise The participant must hold a registration in the Central Professional Register of the builder for the second group, the second category and the fourth group, -First category or registration in a relevant register of a Member State of the European Union or of another State party to the Agreement on the European Economic Area, in which case the participant shall submit an equivalent document evidencing membership registration in an analogous professional organization of the country in which it is established And has the power of entering the Central ProfessionalRegister of the builder for the scope of the activities for which it was issued. The participant fills in Section A: "Fitness" in Part IV: "Selection Criteria" of Single European Public Procurement (EEDOP). Prior to concluding a public procurement contract, the contracting authority shall request from the participant designated as a contractor a copy of the Certificate for entry in the TSPR to the Construction Chamber for the execution of the contractRest of the construction category where the object of the order falls - for more information: http://register.ksb.bg/). If the participant is a non - resident person, he / she may present a valid equivalent document or declaration or certificate issued by a competent authority of a Member State of the European Union or of another State party to the Agreement on the European Economic AreaEvidence of the entry of the participant in a relevant register of that State. 2nd Lot Item Subject: "Design and Authorization Supervision of the Construction of New Perennial Forest Roads and Transport Techniques. Infrastructure to them and on the ground. Repair of existing permanent forest roads, as well as the construction of technical and fortification facilities incl. Construction / ax. Repair of others. Within the meaning of Art. 3, -Para. 1, p. 1, b, b, pp The natural persons who will carry out the design shall have full designer competence in the respective part for which they will prepare the project The legal entities that will carry out the design shall meet all the requirements of the Liaip Foreign persons should have a document in accordance with national law certifying the rightO of the physical persons - designers, to carry out the design of objects within the scope of this order. The authenticity of the document submitted shall be certified by a certified translation of the relevant legal provisions under national law. The participant fills in Section A: "Fitness" in Part IV: "Selection Criteria" of Single European Public Procurement (EEDOP). Before concludingThe contracting authority shall request from the participant designated as a contractor a copy of the Certificate of Full Designer Competence of all the members of the team in the respective parts. If the participant is a non-resident, he can present a valid equivalent document or declaration or certificate issued by a competent authority of a Member State of the European UnionThe Union or any other State party to the Agreement on the European Economic Area proving the entry of the participant in a relevant register of that State. The Contracting Authority requires a participant - a consortium which is not a legal person to submit a copy of a constituting document showing the legal basis for establishing the grouping containing minThe applicant completes field 2a of Section B: Economic and Financial Condition in Part IV: "Selection Criteria" by EEDOP Before the conclusion of the framework agreement, The contracting authority requires the contractor to submit the documents referred to in Article 62 (1) (4) of the PPA: - evidence of realizedRevise it by submitting a statement of the turnover in the scope covered by the order and the annual financial statements for the last 3 completed financial years. Note: "Turnover in the scope of the order" shall mean realized turnover from: "Construction and / or ground repair of roads and facilities" .- - Evidence of existence of professional liability insurance, in-In case they are not available through direct and free access to the relevant national database The participant fills field 4 of section B: Economic and financial status in Part IV: "Selection criteria" by EEDOP and complies with the Methodology According to Annex № 2, to Article 31, paragraph 2 of the RSPC. Prior to the conclusion of a public procurement contract, the contracting authority requires from theThe person designated as contractor to submit the documents under Art. 62, para. 1, item 3 of the PPL - Evidence of the existence of the declared data and circumstances regarding the mentioned coefficients - Annual financial statements or their components for the last completed financial year. 67, para. 5 of the PPL, the contracting authority may take advantage of its right to ask the participants to submitAll or part of the documents proving the information specified in EEDOP. The second lot is filled in. The participant fills in box 2a of section B: Economic and financial status in Part IV: "Selection criteria" by EEDOP. The contracting authority requires the contractor to submit the documents referred to in Article 62 (1) (4) of the PPL: - evidenceAnd for the realized turnover, by providing a report on the turnover in the sphere falling within the scope of the order and the annual financial statements for the last 3 completed financial years. Note: "Turnover in the scope of the order" shall mean realized turnover from the design of roads and facilities. "- evidence of the existence of professional liability insurance, in caseSo that they are not accessible through direct and free access to the relevant national database The participant fills in box 4 of section B: Economic and financial status in Part IV: "Selection criteria" by EEDOP and complies with the Methodology In accordance with Appendix 2 to Article 31, paragraph 2 of the RSPC. Prior to the conclusion of the framework agreement, the contracting authority shall require the participant to determineTo submit documents under Art. 62, para. 1, Item 3 of the Public Procurement Act - Evidence of the existence of the declared data and circumstances regarding the stated coefficients - Annual financial statements or their components for the last completed financial year. Pursuant to Art. 67, para. 5 of the PPA, the assignor may take advantage of his / her right to ask the participants to present all orOf the documents evidencing the information given in EEDOP. Continued from item III.1.3): 1st lot. The participant fills in box 1a) of Part IV of Section E of EEDOP - Selection Criterion regarding activity with subject and volume identical or similar to the subject of the contract Prior to concluding a public procurement contract, the contracting authority requires the contractor, To submit documents under Art. 64, para. 1, item 1 of the Public Procurement Act - a list of works identical to or similar to the subject of the contract, accompanied by certificates of good performance, which contain the value, the date of completion, the place, the type and the volume, In accordance with the regulatory requirements. To establish the compliance of the participant with the requirementsFor technicians of the contracting entity, the participant fills in field 2 of Part IV of Section E of EEDOP - Selection Criterion. Prior to the conclusion of the framework agreement, the contracting authority requires the participant designated as contractor to submit the documents under Art. 64, para. 1, item 3 of the Public Procurement Act the list of the technical persons who will be responsible for the quality control, which specifies the professional competence of the persons 3. The Participant completes Section D: Quality Assurance Standards and Environmental Management Standards in Part IV: Selection Criteria by EEDOP regarding the Certificates it holds. Prior to the conclusion of the Framework Agreement, the Contracting Authority shall require the Designated Contractor to submit Documents under Article 64, Paragraph 1, Items 4 and 7 of the PPL Pursuant to Article 67 (5) of the Public Procurement Act, assignThe participant may take advantage of his or her right to ask the participants to submit all or part of the documents proving the information specified in EEDOP. The participant fills in field 1a) of Part IV of Section E of EEDOP - Selection Criterion regarding activity with subject and volume identical or similar to the subject of the contract Prior to the conclusion of a public procurement contractThe contracting authority requires the participant designated as contractor to submit the documents under Art. 64, para. 1, item 2 of the Public Procurement Act - list of services identical or similar to the subject of the contract, indicating the values, dates and recipients, together with evidence of the services rendered. The participant completes field 2 of Part IV of Section C of EEDOP - Selection Criterion for the team of designers who Prior to the conclusion of the framework agreement, the contracting authority requires the participant designated as a contractor to submit the documents under Art. 64, para. 1, item 6 of the Public Procurement Act - list of the personnel, who will perform the order, which specifies the professional competence of the persons. The participant completes Section D: Quality Assurance Standards and Environmental Management Standards in-Part IV: "Selection Criteria" by EEDOP regarding the certificates it holds Before concluding the framework agreement, the contracting authority requires the contractor to submit the documents referred to in Article 64 (1) (4) of the PPL Pursuant to Article 67 (5) of the PPA, the contracting authority may use its right to ask the participants to submit all or part of the documents by means of whichO For each specific procurement contract, the contracting authority will require a performance guarantee of 3% (three percent) of the value of the specific contract without the VAT. The guarantee is provided in 1 of the forms under Art. 111, para. 5 of the Public Procurement Act Internet address (URL): www.ucdp-smolian.com Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Construction work was 08 Jun 2017. Bidding is closed.
This tender has been issued by ЮЖНОЦЕНТРАЛНО ДЪРЖАВНО ПРЕДПРИЯТИЕ in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45100000 - Site preparation work, 45220000 - Engineering works and construction works, 45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, 45233000 - Construction, foundation and surface works for highways, roads, 45233200 - Various surface works, 45233300 - Foundation work for highways, roads, streets and footpaths, 45240000 - Construction work for water projects, 45262000 - Special trade construction works other than roof works, 71000000 - Architectural, construction, engineering and inspection services, 71200000 - Architectural and related services, 71300000 - Engineering services, 71320000 - Engineering design services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 13024780. The purchaser document reference is 171344-2017.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.