Expired Tender Hungary ICB TOT Ref. 31161197

Contract notice: Construction work for buildings Tender - 31161197

Tender notice from Hungary, published on 01 Mar 2019.

Executive Summary

The GY?R MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA has issued a Tender notice for the procurement of a Contract notice: Construction work for buildings relating to education and research in the Hungary. This Tender notice was published on 01 Mar 2019 and is scheduled to close on 04 Apr 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 31161197, while the tender notice number is 096996-2019 and Register on the platform.

Key facts

Summary
Contract notice: Construction work for buildings relating to education and research
TOT Ref. No.
31161197
Document Ref. No.
096996-2019
Country
Hungary
Notice type
Tender
Competition
ICB
Publication date
01 Mar 2019
Bid deadline
04 Apr 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work for buildings relating to education and research
Description: Contract notice: Construction work for buildings relating to education and research
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45214000, 45210000, 43325000, 45236250, 45261400, 45321000, 45331100, 45350000, 45422100, 45442100, 45453100, 45214000, 45210000, 43325000, 45236250, 45261400, 45321000, 45331100, 45350000, 45422100, 45442100, 45453100
CPV Description: Construction work for buildings relating to education and research.
Building construction work.
Park and playground equipment.
Flatwork for parks.
Sheeting work.
Thermal insulation work.
Central-heating installation work.
Mechanical installations.
Woodwork.
Painting work.
Refurbishment work.
Cuha utcai boelcsőde felujitasa
Reference Number : EKR000189972019
Kivitelezesi szerződes a Cuha utcai Boelbankruptcy of the bankruptcy of the "Cuha Street Boelcsőde developer", called TOP-6.2.1-16-GY1-2018-00004 sam-myaty
Main Site: Hungary, Győr, 9023 Győr, Cuha utca 16.
Main tasks:
- flat roof ( zarofoedem) heat-insulated and water-insulated exchange (892.84 m),
- anti-faucet isolation: 892.84 m
- fa-ade thermal insulator (616.45 m),
- unaltered ramp design (1 pc)ntes sanitary block (1 pc),
- group room (45 and 46 srams) free internal door replacement (3 pcs.),
- replacement of previous upright line arrows (5 pcs),
- position of thermostatic valves on radiators (84 db),
- other superficial jobs: laundry floor and wall covering replacement and painting, changing floor covering, office padloburkoil change, group rooms floor and wall coverings replacement, watertight and water blocks floor and wall coverings replacement paint door replacement, interior door paintings, paintings repair, replacement of canopies,
- sanitary facilities: full water-heating pipe set or switching equipment / heat exchangers,
- The garden upholstery is made up of garden upholstery (120 m).
The nature of the investment, the activities to be carried out at the same time, and the unified technical unit do not make it possible to keep the file (Kbt. 61 (4)). : the 15th anniversary of the authors from the authors' center,
eje: the 110th calendar day of the working space atada aton (if this is not a working day, the first working day that provokes it), which works with the minors in the letesitmeny artisan koezo, with its finely tuned koeruelmenyei koezoett, must be painted,
- Full leallas: 15.6.2019 es 15.7, during which time the internal works can be operated,
- Duration of the technical atadas atvetel(Section 6: 247 (2) of the Civil Code): up to 30 calendar days., unassociated coelcomponent, or a draft copyright agreement.I have examined the nature of the purchaser, the nature of the acquirer (and the artistic complex, that is, the only epuel of the elephant) and the authors, because of the nature of the property, the aspect of the co-operative, the aspect of the co-operative, the parallel construction. activities vezo koezoetti eventual litigation elkeruelese forestsIn this case, it does not make it possible to compile a copy of the file. In addition, some of the workflow processes of the constructor are closely related to one another, one for the epuel, and the work organization of the investor can solve it more efficiently in a case. (Kbt.61- (4))
The reasons for the exclamation are:
1. it is not allowed to have a timer (AT), sub-sub-agent (AV), and cannot retrieve itazolas is a farmer with whom Kbt. One of the conditions set out in Section 62 (1); it is not allowed to have AT, AV, and not be able to retrieve a suitable player in the real world against whom Kbt. Article 62 para. (2) states that the certificate mods are listed, the description of roevid is:
Receiver is a Kbt. According to Masodik Resze, the Kezeszerzzesi performed at the time of entry into the Kr II. In accordance with Section 2-7, the European Co-operative Purchase Document (EECD) must be preceded by a proof that the Kbt does not belong. - 62 (1) and (2) power of the alias
The statement must include the statement of the AT that it does not take a lotfor the author's performance, the AV falling under the excuse of Article 62 (1) to (2). The statement must also be entered if AK does not specify the AVs known in the prior art. Section 69 (4) - (8) is based on the introduction of exclusions for reasons of exclusion in the case of the economic operator Kr III. Chapter 8 and Section 10 must be verifiedthat there is no power of excuse to do so, he must also declare whether there is a change in the order before the cegbirosag, and if so, attach the variation entry bracket to the cegbirosag and the verb with the cegbirosag. Kr III. Chapter 8-16 Certificates authenticated are not available if AK is Kbt. 6In accordance with Article 9 para. (11), the non-referral in the selected Chapters has not been mentioned, the reasons for exclusion exclude the fate or the host member's suitability for the real databases, and the economic actor made them viable in the EECD. The Modes of Verification mentioned in Section 8-16 of Chapter I can be validated in accordance with Chapter V if you qualify as a certified farmerThe prooflists issued for the expulsion reasons may also be used (usable) as long as the contents of the records are true or false. The AK is the true content of the data until the contrary is proved
Professional activity vegzesere is applicable [Kbt. Section 65 (1) (c)]
Farmers engaged in epitope construction activities must be included in Etv. according to the construction industry. The non-Hungarian construction industry is based on a hosts srobbers must be registered in the country of establishment, or have a license issued by a resident in the country of residence, a legal parent or an organization, a chamber tag. The simple statement of the host acter is accepted, the form is not sporadic IV. the data is specified in the file.
Kbt. Article 69.many:
- In the case of a resident economic operator established in Hungary, he / she verifies the registered attendance of the registered person; vonatkozo must be entered, taking into account also Article 1 (2) - (5) of the Government Decree. Section 65 (7), (9), (11) and Kbt. -- 69 (11) is also available. Masodik Resze conducted a chess session at the start of the show in Kr II. In accordance with the chapter, the EECD has to be presented in advance, it has to prove in advance that it complies with Kbt. Section 65 is based on the timeliness
The timeliness of the preliminary statement of the appropriate co-operatives will accept the simple statement of the affiliated farmer, not looking for the EECD IV. information in the file. Since AK accepts the simple statement, it is not necessary to apply for the appropriate DDD. (This is what kesses in the Oeszefuegges)z keepers pay attention to Kbt. Article 62 (1) (i))
Kr Kr. I can deal with the modalities mentioned in the chapter under Chapter V. If you are a qualified journalist in a certified host, you can prove that you are in compliance with the requirements of the Kezbadzzer. Article 69 (4)zoan:
Benyujtando AT, or the body of the appropriate reader, P1) the statement about the full - underdeveloped traffic rumor - the rush of the rushed back to the end of the battles, which is closed with a bell-head, or when you started your activity if you have these datasre down. (Kbt.65- (1) a, Kr Section 19 (1) c) Sufficient data (s) of the ev (s) with which to verify the appropriate proof (s). If the farmer does not have the documents and data described above, because he is a legal artist in the legal form, which is not possible to make a statement about the rake or the oath, it is possible to make an appropriate test of this point.eny and proofer can proceed in line with Kr 19. - (3). Relevant statements and certificates according to Section 65 (7) - (8) are also included in the report. In addition, the host acted on the given - alala verifiable - suitableas described above. (Kbt.67.- (3))
1st IV.2.6) in case of days = 60 days, with regard to Article Kbt.81 (11), the term "Working days expressed in working days" according to point II.2.7) is due on calendar day
2.
3: Contingency of the project is related to or not: no
4.tendon. ATs with notes are tighter
5. AK does not assign a new hianypot to an AV named as Kbt.71.- (6). Kieg.taj. can be found according to Kbt.56.- (1), Kbt.56.- (2) - (5), in the EDF (ECR Kr 2-). Consultation no, the place will bejaras: 13.3.2019, 10:00 orkor on the construction site.
7. Thoughts with lost content, imprint, atamita, translit, modoFor further details on the timing of the check, the check pin, and the time of purchase, please refer to the Coaching Document. K does not claim, therefore, that it is not necessary to indicate in the schedule the resesit (resesit) of the case, for the performance of which it is desirable to take the AT AV, and it is not necessary to give the respect to the tremendousness and the introduction of the news. known as AVt. (Kbt.66.- (6)).
9. Statements, certificates: primarily but not exclusively in Section Kbt.66 (2), (5) or optionally Kbt. Section 65 (7) - (8) ECR according to Article 13 (3) - (4) of the EDF.
The statement in the EDF form (EU) declaration is in the language of the declaration, the declaration must be made in the EU. (EKR Kr10- (2)), to which the EDF Kr 13 - (1) with the iranyado.
Koezoes AT-k eseteben EUe is submitted by GSz (ECR Kr 13 - (2)).
AK koeteeles accepted if AT is using the previous Keszdeszerzeszzzja prior to the use of EEKD, assuming that its content is appropriate.
The content of the information contained in the EEKD is the responsibility of AT (Kr17.- (1)). put on. and the iz. ok up to EKR Kr 12 - (2) is entitled ..
10. They are qualifying for AT, Kbt.65.- (7), it has been introduced in a simple way:
a. an authentic cegalairasi statement (cimpeldany with a notarial alairas creditor), or an alairas sample counted against a court or legal advocate under Section V, -9 (3) of 2006; and, if applicable, the terms of reference specified in the documentation. The schedule should include the complete taskThe dog is carrying all the shells. His commercial and professional career has been pushed forward. Undiscovered low exam if appropriate Ep Ep 25 -
12. FAKSZ: Adamne Egri Judit (registration number: 00239)
13. AK applies Kbt.75 (2) (e). Article III.2.2. Legislation: Yes. 135.- (1) - (3), (5) - (7), Ep. 30-32 / B-; 272/2014. (XI. 5.) Kr. evi CXVII. tv; CC.6: 130. (1) - (2)
Continued in Section VI.4.3
Internet address (URL): http://www.gyor.hu

Documents

Tender Notice
Login to view

Similar tenders

Tender Country TOT Ref. No. Bid deadline
Bp. Iv. Baross U. 39-43 Building B Transformation Planning Hungary 152592235 25 Nov 2026
Building a Solar System in 2 Parts Hungary 152592234 14 Dec 2026
Internal Road Improvements and Renovations Hungary 152592135 23 Nov 2026
Construction of axle load and total weight measuring station and bicycle path ** Hungary 152592034 24 Nov 2026
Renovation and Expansion of the Rainwater Network in Szikszon Hungary 152591932 23 Nov 2026

Hungary Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work for buildings relating to education and research was 04 Apr 2019. Bidding is closed.

This tender has been issued by GY?R MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA in Hungary.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45214000 - Construction work for buildings relating to education and research, 45210000 - Building construction work, 43325000 - Park and playground equipment, 45236250 - Flatwork for parks, 45261400 - Sheeting work, 45321000 - Thermal insulation work, 45331100 - Central-heating installation work, 45350000 - Mechanical installations, 45422100 - Woodwork, 45442100 - Painting work, 45453100 - Refurbishment work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 31161197. The purchaser document reference is 096996-2019.

See the Similar Tenders section on this page or browse other tenders from Hungary.

This tender falls under Construction and Real Estate, Technology and Equipment in Hungary. Suppliers in these sectors can track similar Hungary tenders using CPV-based alerts.